Inspection ID Class I and II Well Inspection Form US Environmental Protection Agency - Region 4 Underground Injection Control Program 61 Forsyth Street SW, MC 9T25, Atlanta, Georgia, 30303 Phone: (404)562-9424 EPA Well ID#: K Y S 0 9 9 0 0 1 0 Year-Month-Day: 2 0 2 4 - 0 2 - 2 1 EPA Permit # (or RA): K Y I 0 4 2 0 Page 1 Of 2 Inspector(s): _____C__a_r_o_l_C__h_e_n__________________ (lead),______B_r_i_a_n_n__a__L_a_P_a__p_a_____________ Start Time:1__0_:_1_2__a_m__ ____________________________________, ____________________________________ End Time:1_0__:2__2__a_m__ Facility Contact Information Logsdon Valley Oil Co., Inc.
refid# B5gLoKR2VQ1J42YZYMOp7Kzjo2 pages
SENT VIA ELECTRONIC MAIL Michael Ray Environmental Specialist Solvay Speciality Polymers USA, LLC. 3702 Clanton Road Augusta, Georgia 30906 michael.ray@syensqo.com Dear Michael Ray: On May 28-29, 2024, the U.S.
refid# 6RDXL55BkK0dVk4n0g3L3dJz320 pages
Clean Air Act Title II: Mobile Source Inspection INSPECTION REPORT Attached please find the United States Environmental Protection Agency's inspection report of your inspected facility and/or any vehicles/engines identified therein.
refid# X7OzrjBVzG0wvmJd3E7NwvDkJ3 pages
SENT VIA ELECTRONIC MAIL Danny Moseley Plant Manager United Packers of Mobile Coca-Cola Bottling Company United, Inc. 5300 Coca Cola Road Mobile, Alabama 36619 Dannymoseley@ccbcu.com Dear Danny Moseley: Enclosed is a copy of the final Inspection Report (Enclosure A) generated by the Environmental Protection Agency Region 4 Air Enforcement Branch for the December 11, 2024, partial compliance inspection of the Coca-Cola Bottling Company United, Inc., facility located at 5300 Coca-Cola Road, Mobile, Alabama.
refid# 6by3vbXVNqL2prgYa3djY44E918 pages
U.
refid# gDEO3y8LV1jpbaOn9MBkGnOqL2 pages
ELECTRONIC EMAIL CONFIRMATION OF EMAIL RECEIPT REQUESTED Ali Davis 3630 Kopac Cove Sumter, South Carolina 29154 Davisali21@hotmail.com Re: Notice of Violation and Opportunity to Show Cause Pursuant to Section 309(a) of the Clean Water Act (CWA), 33 U.S.C. 1319(a), and Information Request Pursuant to Section 308 of the CWA, 33 U.S.C. 1318, for Ali Davis, near Sumter, Sumter County, South Carolina; Docket No. 308-2024-14 Dear Ali Davis: This letter is to inform you that the U.S.
refid# jyNQxY8qjpx3KGBmOpjL8qLDZ8 pages
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Region 4 Laboratory Services and Applied Science Division 980 College Station Road, Athens, Georgia 30605-2700 D.A.R.T.
refid# GmxowZ5wvQjJZQdwONbV75wRq24 pages
U.S.
refid# qaDw9wGZkOYZL7Dy19yREpEaj5 pages
March 5, 2024 Lexington Fayette Urban County Government c/o Mr.
refid# LJERzZBBE2Q8LJYaLGGGrZyZQ1 page
LSASD Project ID: 24-0275 Georgetown Sewage Treatment Plant #2 NPDES Compliance Evaluation Inspection 900 Cherry Blossom Way Georgetown, Kentucky 40324 Project Date(s): July 9th, 2024 Report Date: September 12, 2024 FSBFORM-1403-R0 073024 Project Leader: Chris McHugh Water Quality Section Field Services Branch Laboratory Services & Applied Science Division USEPA - Region 4 980 College Station Road Athens, Georgia 30605-2720 LSASD Project ID: 24-0275 Page 1 of 5 Final Report FSBFORM-1403-R0 073024 Project Requestor: Jairo Castillo, P.E.
refid# 3J1x9Qv2EXJ6m16000rMEQkOa5 pages
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, GEORGIA 30303-8960 ELECTRONIC MAIL CONFIRMATION OF EMAIL RECEIPT REQUESTED Mr.
refid# OJ3D57bdb9Rmdnr8pVxgB676K9 pages
Clean Water Act Section 404: Site Visit/Case Development For inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) This report includes only factual information gained by documentation, onsite observations, and/or onsite interviews.
refid# 6wn6q6ZVzY4m98z73mDZpgm0m13 pages
Inspection ID Facility Contact Information Class I and II Well Inspection Form US Environmental Protection Agency - Region 4 Underground Injection Control Program 61 Forsyth Street SW, MC 9T25, Atlanta, Georgia, 30303 Phone: (404)562-9424 Inspector(s): Carl E.
refid# dQJbjxgN22zkbdGJ0J9jw4gj02 pages
Emission Unit Enclosure D Inspection Observations 5/28-29/2024 Control Device Parameter Monitor Permit Limit Amodel Process (Down During the Inspection) Observations Hot Oil Heater KB-901 (0A17) Boiler UB-1210 (0A21) None None Flare KB-807 (0A15) None Extruder KM-601 (0A6D) None Visible Emissions (%) Visible Emissions (%) Steam Flowrate (lb/hr) Steam Pressure (psig) Visible Emissions (%) Pilot Flame Indicator <20% <20% <40% Visible Emissions (%) <40% Scrubber KD-633 (0A6B) Pressure Drop (in H2O) Flowrate <5 in H2O >1 gpm Seal Drum (KF613) Exit Temperature (F) <220F Vacuum (C603) Pump Exit Temperature (F) <220F Mix Tank KD-260 (0A2B) None Visible Emissions (%) <40% Mix Tank KD-260 (0A2B) Surge Tank KD-266 (0A2C) Concentrator KD-301 (CONC) Scrubber KT-1001 (A10A) Pressure Drop (in H2O) <6 in H2O Flowrate >20,000 lb/hr Distillation Still KD-806 (0A9A) Condenser C-803 (0A8C) Exit Temperature (F) <350F Hot Oil Heater #1 (00H1) Hot Oil Heater #2 (00H2) None None Sulfone Process Visible Emissions (%) Visible Emissions (%) <20% <20% Process Down Process Down Process Down Process Down Process Down Process Down Process Down Process Down Process Down Process Down 0 0 Waste Heat Boiler LM-731 (00B8) None Visible Emissions (%) Temperature <20% >1500F Railcar Unloading Station (RCU) Tank LD-101 (0C1E) None None Visible Emissions (%) Visible Emissions (%) <20% <40% Reactor LR-201 (0C4D) None Visible Emissions (%) <40% Waste Heat Boiler LM-731 (00B8) Mist Eliminator (0C7L) Pressure Drop (in H2O) Storage Tank LF-111 (0C2B) Storage Tank LF-115 (0C2X) Condenser (0C2A) Exit Temperature (C) >9 in H2O <12.8C Reactor LR-201 (0C4D) Condenser (0C2G) Exit Temperature (C) <12.8C Reactor Cooler LE-202 (0C2E) Tower LT-302 (0C3C) Reactor LR-380 (R380) Condenser (0C2L) Exit Temperature (C) <12.8C Condenser (0C5A) Exit Temperature (C) <12.8C Process Down 0 0 0 Process Down 3.45 0.62 0.98 3.01 Emission Unit Feed Tank LD-458 (0C4I) Feed Tank LD-401 (0C6F) Control Device Condenser (0C6A) Tower LT-460 (0C6G) Condenser (0C6C) Feed Tank LD-501 (0C5F) Tank LD-325 (0C5G) Tank LD-601 (0C6J) Feed Tank LD-621 (0C6K) Tank LD-651 (0C6L) Tank LD-701 (0C7D) Storage Drum LD-751 (0C7E) Tank LD-814 (0C8C) Tank LD-852 (0C8F) Drum LD-1201 (C10H) Drum LD-712 (0C7F) Tank LD-645 (0C64) Condenser (0C7A) Storage Tank LD-310 (0C5D) Storage Tank LD-314 (0C5E) Condenser (0C5B) Parameter Monitor Exit Temperature (C) Exit Temperature (C) Exit Temperature (C) Exit Temperature (C) Permit Limit <12.8C <12.8C <12.8C <12.8C Observations 1.97 2.40 2.88 1.91 Extraction Tower LT-445 (0C7G) Acid Extraction Column LT485 (T485) Acid Extraction Column II Bottoms Cleaner LH-487 (H487) Sulfone Neutralization and Wash Column II LT-495 (T495) Sulfone Neutralization and Wash Column II Bottoms Coalescer LH-497 (H497) II Condenser (0C7B) LD505 Crude Crystallizer Feed Drum (D505) LD531 Crude Crystallizer (D531) LM542 Crude Centrifuge (M542) LD551 Crude Reslurry Tank (D551) Condenser (D576) Tank LD-101 (0C1E) Scrubber (0C1A) Waste Heat Boiler LM-731 (00B8) Scrubber (0C8A) Scrubber (0C8B) Exit Temperature (C) <12.8C 0.74 Exit Temperature (C) <12.8C 3.90 Pressure Drop (in H2O) Pressure Drop (in H2O) Pressure Drop (in H2O) Flowrate pH <20 in H2O 0.2 <10 in H2O Process Down <10 in H2O >27,850 lb/hr >7 Process Down Hot Oil Heater H-601 (00P1) Xydar Process (Down During Inspection) None Visible Emissions (%) <20% Process Down Hot Oil Heater H-603 (00P2) None Visible Emissions (%) <20% Process Down Boiler H-602 (00P3) Boiler H-604 (00P4) None None Visible Emissions (%) Visible Emissions (%) <20% <20% Removed Removed Emission Unit Control Device Reactors R-201 A/B/C (RX01) None Parameter Monitor Visible Emissions (%) Permit Limit <40% Observations Process Down Mixer R-202A (0X2G) None Visible Emissions (%) <40% Process Down Mixer R-202B (0X2H) None Visible Emissions (%) <40% Process Down Mixer R-202C (0X2I) None Visible Emissions (%) <40% Process Down Reactors R-201 A/B/C (RX01) Mixer R-202A (0X2G) Mixer R-202B (0X2H) Mixer R-202C (0X2I) Scrubber (0X2T) Udel Thermal Oxidizer (00C2) None Reactor PR-401 (0U4D) None Pressure Drop (in H2O) Flowrate pH Udel Process Visible Emissions (%) Temperature (F) Visible Emissions (%) <15 in H2O >120 gpm >9 Process Down <40% >1600F Not Built <40% Not Built- Tank PD-411 (0U4A) Tank PD-412 (0U4B) Tank PD-603 (0U6A) Tank PD-604 (0U6B) Udel Thermal Oxidizer (00C2) Reactor PR-401 (0U4D) Column PT-715 (0U7I) Drum PD-425 (0U4E) Tank PD-202 (0U2A) Tank PD-503 (0U5C) Tank PD-730 (0U7G) Scrubber (00C3) Pressure Drop (in H2O) Flowrate pH Hot Oil Heater (BE-01) None KetaSpire/NovaSpire (also known as Jupiter (PEEK) Process) Visible Emissions (%) >5 in H2O >10 gpm >7 <20% Not Built- Boiler (BE-02) None Visible Emissions (%) Steam Flowrate (lb/hr) Steam Pressure (psig) <20% Emission Unit Group HE-2 Process Reactor (PR-200) Emission Unit Group HE-1 HCL Storage Tank (PF-800) Scrubber (SC1) Scrubber (SC2) Unit FD-1210: 2,5-DCBP Mix Tank (FD02) Scrubber (FT01) Unit FR-200: Digestion Tank(FD08) Scrubber (FT02) Carbon Drum Membrane (FA03) Unit FR-400 through Unit FR805 and Unit FF-705 through Unit FF-800 Scrubber (FT03) Pressure Drop (in H2O) <15 in H2O 0.1 Pressure Drop (in H2O) Push Process (Not Built) Pressure Drop (in H2O) pH Pressure Drop (in H2O) pH <15 in H2O <15 in H2O >7 <15 in H2O >7 0.8 Not Built Not Built Pressure Drop (in H2O) <90 psia Not Built Pressure Drop (in H2O) <15 in H2O Not Built
refid# YbL4pnvazqBzR6na1NLYqr804 pages
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 4 ATLANTA FEDERAL CENTER 61 FORSYTH STREET ATLANTA, GEORGIA 30303-8960 SENT VIA ELECTRONIC MAIL Ms.
refid# k9qv7G6ekLqx8Gvg5bGOdyQnb6 pages