Document qaDw9wGZkOYZL7Dy19yREpEaj
U.S. Environmental Protection Agency, Region 4 61 Forsyth Street SW, Atlanta, GA 30303 Water Compliance Inspection Report
FACILITY DATA
NPDES ID: MSR000950
Effective Date: 12/10/2020
Expiration Date: 11/30/2025
Facility Name: Gloster Chips
SIC Code: 2499
Address: 600 E Carney St / Gloster, MS 39638 On-Site Representatives:
Responsible Official:
Steven Farr, Mill Manager
Scott Montablano, Procurement Manager Hood Container of Louisiana Scott.montablano@hoodcontainer.com
Steven Farr, Mill Manager Gloster Chips, Inc. steven@thepricecompanies.com (601) 225-4120
INSPECTION ENTRY DATES/TIMES
Entry Date/Time: 1:45pm 03/06/2024
Exit Date/Time: 3:30pm 03/06/2024
NAMES OF STATE INSPECTORS
MDEQ: Yang Li, Thomas Schaub EPA LSASD: Chris McHugh, Asher Sampong
AREAS EVALUATED DURING INSPECTION (Check those areas evaluated)
X Permit X Records X Facility Site Review X Effluent/ Receiving Waters
Flow Measurement
Self-Compliance Program Compliance Schedule Laboratory X Operations & Maintenance Sludge Handling/ Disposal
INSPECTION SUMMARY
Pretreatment X Pollution Prevention X Storm Water
Combined Sewer Overflow Sanitary Sewer Overflow
Facility has two NPDES permits: the Wet Deck GP (MSG170023) and the Industrial Stormwater GP (MSR000950). Since the Facility has coverage under both, its stormwater discharges are covered by the IGP, and the Wet Deck GP covers only the wastewater discharge.
INSPECTOR SIGNATURE
CELINA RUSSO
Digitally signed by CELINA RUSSO Date: 2024.04.24 15:52:15 -04'00'
Celina Russo, Environmental Engineer
JEREMY JUDD
Digitally signed by JEREMY JUDD Date: 2024.04.24 17:05:42 -04'00'
Jeremy Judd, Environmental Engineer
AHMAD
Digitally signed by AHMAD DROMGOOLE
DROMGOOLE 09:40:03 -04'00' Date: 2024.05.02
Ahmad Dromgoole, Section Chief Waterways and Wetlands Enforcement Section
Page 1 of 5
OFFICE/PHONE NUMBER
USEPA Region 4/ECAD-WEB-WWES 404-562-9804
USEPA Region 4/ECAD-WEB-WWES 404-562-9505
USEPA Region 4/ECAD-WEB-WWES 404-562-9212
NPDES Industrial Stormwater Worksheet (Mississippi IGP)
GPS Coordinates Receiving Water(s) or MS4
Site Acreage
1. FACILITY LOCATION INFORMATION
Latitude
31 11' 3.9" N
UT of Little Beaver Creek
~40 acres
SIC Code
Longitude
Discharge to 303(d) or TMDL waters
2499
91 01 '49.8" W
No
Weather Condition
Sunny, warm
2. STORMWATER POLLUTION PREVENTION PLAN (SWPPP) BASIC INFORMATION
PLAN TOPICS SWPPP available on-site SWPPP was dated 06/07/2022. SWPPP Certification Signature/Date Signature/certification page was left blank. SWPPP modified and updated to current conditions
Pollution Prevention Manager/Committee Team consists of the Mill Manager.
Employee training schedule (annual) Employee training is to be completed upon hire and annually thereafter.
YES NO N/E ACT9.S-1(1)
X
ACT5 T-9 X
ACT9.S-1(4) X
ACT5.T-6(1) X
ACT5.T-6(7) & 14 X
Site Description Facility produces wood chips for the paper production industry. X
Site Map A copy of the site map, dated 2018, is shown in photo DSCN2958.
ACT5-1.T-3 X
Summary of potential pollutant sources and particular pollutants
ACT5.T-1
Potential pollutant sources are also identified on the site map (photo DSCN2958). The pollutant
X
assessment in the SWPPP was dated 2011, but operations have not changed substantially.
Risk Identification and Material Inventory
ACT5.T-6(2) X
Sediment and Erosion Prevention
ACT5.T-6(3)
SWPPP calls for gravel roads, ground cover on bare areas, and bark around the rotary crane.
X
Schedule and Procedures for Good Housekeeping Includes the usage of secondary containment for fuel storage.
ACT5.T-6(5) X
Preventative Maintenance Program SWPPP calls for regular maintenance and periodic inspections of equipment.
ACT5.T-6(4) X
Description of Control Measures
Identified control measures include gravel roads; tarping down trucks; hard/soft wood storage piles;
X
rotary crane by the log storage piles covered with bark.
Page 2 of 5
Spill Prevention and Response Procedures
Schedule & Procedures for Routine Visual Inspections Inspections are to be done at least once per month. Stormwater Management Ponds retain water onsite. Water from the WDLS pond is reused. Non-Stormwater Discharge Management
ACT5.T-6(6) X ACT5.T-8(9)
X
ACT5.T-8(10) X
ACT5.T-8(11) X
3. SITE DESCRIPTION AND SWPPP
Facility is a chipper of yellow pine for clients, which includes the paper products industry. Logs are delivered via truck and stored onsite while awaiting processing. The western portion of the site is dedicated to wet decking.
The site has two permitted outfalls and coverage under two NPDES permits: the MS Industrial Stormwater General Permit and the MS Wet Deck Log Spray (WDLS) General Permit. The WDLS permit covers discharge from the facility's WDLS recirculation pond shown in photo DSCN2961. Both the recirculation pond and stormwater runoff discharge through Outfall #2. An additional retention pond near the southern end of the site discharges through Outfall #1.
4. RECORD REVIEW
RECORD REVIEW Representative on-site
NOI Submitted to DEQ
YES NO N/E X
ACT4 S-1&T-3 X
Records of incidents with spills, leaks, pollutant releases
Including: dates and description of incident and the corrective actions
ACT5.T-3(4)
Facility maintains monthly spills sheets/logs. Forms were completed monthly for January 2018
X
through January 30, 2024.
Records of maintenance and repairs of control measures
Corrective actions are incorporated into the monthly inspection checklist.
X
Records of employee training
ACT14 S-1
Records for annual employee training with rosters completed on 11/23/2018, 11/22/2019,
X
12/31/2020, 12/31/2021, 12/28/2022. Training for 2023 was not completed.
Records of monthly site inspections
ACT10.R-1
Self-inspections are completed monthly using the standard form from MDEQ.
The earliest recorded inspection was done on 01/28/2021 and the most recent inspection was
X
completed on 01/31/2024. Inspections for 2023 were completed on the following dates: 01/31,
02/28, 03/31, 04/30, 05/31, 06/30, 07/31, 08/31, 09/30, 10/31, 11/30, and 12/30.
Records of monthly visual jar test
For inspections conducted during storm event
ACT10.R-1
Records were available for 01/28/2021 through 01/31/2024, with the form being completed on a
X
monthly basis. "No discharge" was always reported.
Records of ANNUAL Comprehensive SWPPP Evaluation
ACT10.R-2
X
Page 3 of 5
Not available onsite. Facility personnel believe that the regional managers complete the annual evaluation and corresponding form.
SPCC
Not required. Facility reports not meeting storage capacity requirements for SPCC. A regular
X
inventory log is completed.
Illicit Connects Evaluation Certification
ACT5.T-7(8)
X
Pollutant Sources
5. FIELD EVALUATION & PLAN IMPLEMENTATION
Note location, quantitative description, design issue, O&M deficiencies, and pollutants offsite
Loading/Unloading Area
Both incoming logs and finished products are shipped via truck.
Outdoor Storage Stormwater Management
Logs are stored in the northern end of the site (see photo DSCN2973) and around the radial crane. Logs in wet storage are kept on the western end of the site, which is dedicated to wet decking (see for example photo DSCN2961). Chips awaiting shipment are stockpiled outdoors, as shown in photo DSCN2963 and DSCN2974. Front end loaders then move chips into trucks.
The western end of the site is dedicated to wet decking and wet storage. Runoff from this area drains back into the WDLS recirculation pond for reuse. When the recirculation pond needs to be lowered, the low level drain discharges into the mid-site swale as shown in photo DSCN2962 before discharges via Outfall #2 (see photo DSCN2959). Discharge from the recirculation pond is permitted as a wastewater discharge under the WDLS General Permit.
The mid-site drainage feature, shown in photos DSCN2960 and DSCN2975, discharges stormwater through Outfall #2, as permitted under MDEQ's IGP. This conveyance receives runoff from the processing area (see photo DSCN2976-2977).
The retention pond, located near the main office and shown in photo DSCN2966 discharges to Outfall #1 via the conveyance shown in photos DSCN2964-2965 and DSCN2967. The drainage system around the rotary crane, which begins at the location shown in photo DSCN2972, flows into one of two concrete detention basin (photos DSCN2969-2971) before discharging into the retention pond as shown in photo DSCN2968.
Outdoor Manufacturing/ Processing Operations
Outdoor processes include wet decking, debarking, and chipping. The area around the chipper drains into the mid-site swale, as shown in photos DSCN2976-2977.
Treatment/Storage/Disposal Areas
By-product is sold as a final product. For example, tree bark is used in mulch products.
Sediment & Erosion Controls (BMPs)
The control measures identified in the SWPPP were in use in the field. As shown in photo DSCN2972, roads were gravel.
Page 4 of 5
Spills / Leaks Handling / Good Housekeeping
Sawdust around the chipper is cleaned on a weekly basis. According to facility personnel, the concrete basin shown in photo DSCN2969 was recently cleaned (c. November 2023) and the basin shown in photo DSCN2971 is scheduled to be cleaned out later that week.
Fuel/diesel, oils (hydraulic/motor), and DEF tanks are stored indoors in the shed shown in photo DSCN2978. This is consistent with the SWPPP. Total storage capacity of oil products does not trigger SPCC requirements.
6. OUTFALL, STORMWATER DISCHARGE & RECEIVING WATER OBSERVATIONS
YES NO DESCRIPTION
Number & location of stormwater discharge(s)/outfall(s) consistent with SWP3
There are two permitted outfalls, consistent with those shown in the site map (see photo DSCN2958). Outfall #1 (photo DSCN2964) X discharges overflow from the southern retention pond and Outfall #2 discharges runoff from the drainage feature shown in photo DSCN2960 and also occasionally from the WDLS recirculation pond, which is permitted separately under the WDLS GP.
Evidence of off-site accumulation of pollutants in receiving water
Other discharges or potential discharges off-site (not through permitted outfalls)
X None observed. X None observed.
Non-stormwater discharge
X None observed.
Exit interview conducted with: Mr. Farr and Mr. Montalbano
Preliminary findings discussed during the exit interview included: - All records of the monthly visual jar tests report "no discharge." However, Outfall #1 appeared to be discharging at the time of the inspection. Even if water only discharges during or following a rain event, this still qualifies as a discharge.
Photo Log is attached.
Page 5 of 5