Refine
Estimated Years
1900-1909 (114)1910-1919 (30)1920-1929 (11)1930-1939 (38)1940-1949 (23)1950-1959 (69)1960-1969 (95)1970-1979 (802)1980-1989 (1183)1990-1999 (2027)2000-2009 (4585)2010-2019 (630)2020-2029 (5451)Undated (6022)
21,080 results foundRefine Search
2nd submission - Comment on Proposed Restriction of PFAS Conference of Fluoro-Chemical Product Japan (FCJ) On behalf of chemical manufacturers, we, Conference of Fluoro-Chemical Product Japan (FCJ), have been working tirelessly to comply with national chemical regulations.
Document imageDocument imageDocument imageDocument image
refid# jgRGjVj5DmBv77nb7EjD4086O4 pages
3M 3M Corporate Toxicology and 3M Center, Building 0220-06-E-03 Regulatory Ser0ces St .
Document image
refid# BXz8XEO2nDM87q7xRpVZZbm1 page
JON S .
Document imageDocument image
refid# evv7g0Z0jEdNwLZRBLq7rRa0q2 pages
"McCrea, Deborah" <rnccrea@taftlaw.com> 08121/2009 10 :52 AM To NCIC OPPT@EPA cc "gilott, Robert A."
Document imageDocument imageDocument imageDocument image
refid# NEo2DdQq8591Yo2aydjxg7g1g32 pages
- AR R26~ 3756 Dyno Nobel Americas 3 (.
Document imageDocument imageDocument image
refid# RJ5ndnZ6LGwKXXaDBjGd55Dw73 pages
Adelhelm Kunststoffbeschichtungen GmbH Arbachtalstr. 34-36 | 72800 Eningen u.
Document imageDocument imageDocument imageDocument image
refid# XzJB048Eja1b5O1NzEjk4jgOJ27 pages
Document image
refid# kmQd3z0LK6D7D8jGL9mxqaNJO1 page
Project number Project Name Client Spreadsheet name 41288 PP-CH PFAs in fire fighting fo European Commission, DG E Task 3 - Emission estimation Log Date Version User 25.06.2019 V1.01 11.07.2019 12.07.2019 V2.01 V2.02 06.09.2019 06.09.2019 06.09.2019 12.11.2019 13.11.2019 14.11.2019 20.11.2019 21.11.2019 v3.01 v3.02 v3.03 v3.04 V4.01 V4.02 V4.03 V4.04 21.02.2020 13.01.2021 v4.05 v4.06 Key Input cells - requires manual update of valu Calculated cells - automatically populates Linked cells - draws data from elsewhere in Methodology for Kd (see description from ECETOC techni http://www.ecetoc.org/report/measured-partitioning-pr Overvall Flow of material from production - to - e UK - Manufacturing and Production Manufacture of surfactants for fire-fighting foam (Possibly emissions to air and wastewater) Import of surfactants for use in fire fighting foams (No EU emissions) _ _}---- Import of foams already containing surfactants Emissions AIR oams ENV tables Third Party Disclaimer Any disclosure of this data tool to a third party is su European Commission) (Contract Ref No 07.0203/2 who is able to access it by any means.
Document imageDocument imageDocument imageDocument image
refid# 2jzL9aO5MYzeqyoj1oqJbD6yN8 pages
CECHA EUROPEAN CHEMICALS AGENCY Eurofeu Secretariat General KoellikerstraBe 13 97070 Wurzburg GERMANY MPeurofeu.org 1 (6) Helsinki, 12 February 2021 ECHA's firefighting foams restriction proposal: questions related to the use of firefighting foams Dear Sir/Madam, The European Chemicals Agency (ECHA) is currently investigating the use of per- and polyfluoroalkyl substances (PFAS) in fire-fighting foams1,2.
Document imageDocument imageDocument imageDocument image
refid# 6bN4n0XORkq2Z9evkkD16vYZR6 pages
Document imageDocument image
refid# MJD8EmxxQ7Kg7n0v9aRX71K6j2 pages
Considering the concern raised by substituting fire-fighting foams containing PFOA with other fluorine-based ones, the increasing availability of fluorine-free alternatives and the conclusions of ECHA's and Commission's study, the Commission would like to ask ECHA to develop an Annex XV dossier in accordance with Article 69(1) of REACH for a potential restriction of PFAS in fire-fighting foams.
Document imageDocument image
refid# JN3V5MVk8K2kKw9KwbvqNkw8K2 pages
Draft agenda for PFAS-RESTRICTION WEBEX Meeting between DE, DK, NL, NO, SE CA and ECHA 23 November 2020, 9:00 - 13:00 (CET) Login details: See below Point 1 - Opening and adoption of the agenda (9:00-9:10 am) Point 2 - Minutes and action points (9:10 - 9:20 am) 2020-11-08_PFAS RESTR-10 Minutes and APs_Draft of FINAL.docx 2020-11-17_Continued list of APs and their status.docx Point 3 - Status of COM/ECHA restriction on firefighting foams (9:20- 9:30 am) Point 4 - Status update WP7 and Essential Use (9:30 - 10:00 am) Update from NL CA on progress on concept of "essential use" CARACAL discussions and COM concept of "essential use" Point 5 - Status update WP1 (10:00 - 10:30 am) RMOA Discussion of draft RMOA template (Timing finalization till 1st half of 2021) Discussion of possible restriction options (examples from previous restrictions) Call for evidence follow-up Information on Webinar 29 October - Finalisation Q&As Point 6 - Status update WP4 (10:30 - 11:00 am) All Member States to give an update on their/consultants work on the different sub-uses Timing finalization of the WP4 studies Outstanding issues Break 11:00 - 11:30 am Point 7 - Status update WP2 (11:00 - 11:15 am) Point 8 - Status update WP3 (11:15 - 11:30 am) Point 10 - Action points, next steps & meetings (11:30-12:00 am) Feedback from RiME Meeting (deadline for written comments 20 November) Request from PlasticsEurope for a meeting Next WebEx meeting: December 21 WebEx Details ECHA Risk Management invites you to join this Webex meeting.
Document imageDocument imageDocument image
refid# QgyEbGvmeYQ68NgX77rqzeMz53 pages
Content project plan work packages Next meeting: WP leader to provide draft project plan 1.
Document image
refid# yryQ37de5yZLEgyqnMopX9vGX1 page
Berichts-Nr.: Kunden-Nr.: B18-0412-AP 16595 Datum: 18.02.2019 Ermittlung und Beurteilung an zwei Arbeitspltzen der Firma IDT Industrie- und Dichtungstechnik GmbH Art der Ermittlung Expositionsmessung nach TRGS 402 Betreiber: Standort: IDT Industrie- und Dichtungstechnik GmbH Gewerbering 6 09456 Annaberg-Buchholz Gewerbering 6 09456 Annaberg-Buchholz Datum der Probenahme: 19.11.2018 20.11.2018 V510-1_FB03-V01 G:\Kunden\16000-16999\16595\2018\LU\B18-0412\Bericht\B18-0412-AP.docm ERGO Umweltinstitut GmbH B18-0412-AP Seite 2 von 12 Bericht ber die Ermittlung und Beurteilung von Gefahrstoffen nach TRGS 402 Name der Stelle: ERGO Umweltinstitut GmbH Dresden Aktenzeichen/Berichtsnummer: Standort: Art des Betriebes: Auftragsnummer: Auftragsdatum: B18-0412-AP Datum: 18.02.2019 Gewerbering 6 09456 Annaberg-Buchholz Anlage zur Herstellung von Dichtungen aus verschiedenen Materialien schriftl.
Document imageDocument imageDocument imageDocument image
refid# ByQD1D0jXo5QZ6YV7VG963nNX21 pages
Eidgenssisches Departement des Innern EDI Bundesamt fr Lebensmittelsicherheit und Veterinrwesen BLV Aline Troxler AG-Nutition Campus Liebefeld 15.
Document imageDocument imageDocument imageDocument image
refid# 1Q2n4RaZq98O54MyJoeXQk8MZ7 pages