CHEMICAL MANUFACTURERS ASSOCIATION Record of Conference Call of the Vinylidene Chloride Panel DATE: July 24, 1991 TIME: 10:00 a.m.
refid# peBpJbBNZ31aVR2oG5rpdxZ9B1 page
Solvents / EDO 1 Industrial Hygiene Communication # 94.10 Issue Date: September 2,1994 Return Date: Author: Mike Brown Subject: 1994 Chemical Resistant Personal Protective Equipment Written Program Please review the attached training material as quickly as possible and pass on to the next person on the list.
refid# 3NR8vbj3Z17K2ewNNqqLLbQK610 pages
THE DOW CHEMICAL COMPANY ELECTRICAL TECHNOLOGY GLOBAL ADMINISTRATIVE GUIDELINE G7A-0099-01 14-JUN-1996 PAGE 1 OF 2 ELECTRICAL SAFETY AND RELIABILITY AUDIT CHECK LIST FOR INCOMING ELECTRICAL SERVICES yy INCOMING SERVICE LOCATION I.D.
refid# Y9kZ6zzgaYZnkaJ3avebgdm1N2 pages
REVIEW OF REACTIVE CHEMICALS CONCERNS This section provides a detailed format within which to conduct a self-audit of the processes) under review.
refid# 50OOYNmqkO5OkGd6O6kD336G810 pages
HOWARD DUHON, nit MW PLEASE REMOVE FROM THE VCM TRAINING LIST THE FOLLOWING EMPLOYEES OF THE SHIPPING DEPT.
refid# zzG4LvkQXaOm0mkV1qBb1dE871 page
1992 Annual Vinyl Chloride Training Quiz Name Badge # Da.t True or False: ____ 1.
refid# BDgDnLgVNmj0kog4Qokzey5E5 pages
Section Number: Issue Number: Original Date: Date: Title: References: Ethanolamines/Glycol Ethers Tier 3 Procedure 1301 1.1 08-23-94 Author: Anthony Machie 12-12-96 Ammonia Tank Car Evacuation For Maintenance Glossary of Equipment Identification (txt#114) 1301.
refid# nkqakRBo5BNEp0mQnZ1N5xaJR3 pages
Ethanolamines/Glycol Ethers Tier 3 Procedure Section Number: Issue Number: Original Date: Revision Date: Title: References: 1712 1.4 11-11-91 Author: Dwayne Leglue 01-21-98 Warming Up Reboilers Glossary For Equipment Identification (Text #114) 22 PM Series Start-up (For El 10 Specifically) 23 EB Mode Start-up (For El 10 Specifically) 1712 Warming Up Reboilers 1.0 Objective: 1.1 To prevent damage to equipment (reboilers) and personnel by pre-heating the reboiler prior to service in a safe and efficient manner. 2.0 Responsibility: 2.1 It is the responsibility of the operations personnel to ensure that this procedure is fully complied with. 3.0 Procedure: 3.1 Let the boardman know you are going to warm up the reboiler. 3.2 Call the boardman and make sure he/she has the steam control valve closed. 3.3 Slowly open the upstream block valve on the steam control loop to the reboiler you are warming up. 3.4 Open the upstream bleed valve on the control loop. 3.5 Bleed cold condensate from line until you start getting steam from bleed. 3.6 Crack the bypass valve slowly around the control loop to allow a small amount of flow to the reboiler to start warming the shell.
refid# RjmQBn9KxjyQ0KKEVz14VaxEV2 pages
Section Number: Issue Number: Original Date: Date: Title: References: Ethanolamines/Glycol Ethers Tier 3 Procedure 412 2.1 10-04-94 Author: Mike Viator 05-08-96 Storage Tank Quarantine and Isolation Glossary Of Equipment Identification (Text #114) QSP05 Product Identification And Traceability QSP09 Inspection and Test Status QSP07 Inspection and Testing 412 Storage Tank Quarantine and Isolation 1.0 Objective: 1.1 To establish a procedure for the isolation and analysis of all storage tanks.
refid# 1Q7xEmV5Gy5p5QYNeyV6D0Kg52 pages
Ethanolamines/Glycol Ethers Tier 3 Safework/Operating Procedure Section Number: Issue Number: Original Date: Revision Date: Title: References: 1709 1.3 11-11-91 Author: Micheal Viator 12-11-95 Sundyne Field Switch Test Glossary Of Equipment Identification (Text #114) 1709 Sundyne Field Switch Test 1.0 Objective: 1.1 To ensure main switch gear driver will not start in preparation for pump maintenance. 2.0 Responsibility: 2.1 It is the responsibility of the operations supervisor and the senior operations specialist to ensure the safe and efficient completion of this procedure. 2.2 It is the responsibility of the senior operations specialist and the operations specialist to ensure that this procedure is fully complied with. 3.0 Special Notations: 3.1 When testing the field switch on a sundyne pump, remember you have to have the auxiliary oil pump on and the oil pressure has to be 15 pounds or more before the main driver will start.
refid# jBqqjRYKkXd00rL8ojdLXpQqp2 pages
Ethanolamines/Glycol Ethers Tier 3 Procedure Section Number: 1805 Issue Number: 1.4 Origination Date: 08-13-93 Author: Revision Date: 06-12-97 Title: Lockout/Tagout Block Procedure Reference: U.S Area Safety Standard 1805.
refid# MMBppv64Z5Ex7NdwVmzGO9VJy3 pages
February 4, 1992 Don Denova Environmental Operations Dow U.S.A The Dow Chemical Comca,'y P 0 Box `SO Plaaoehiine Louisiana 70765-CT50 Building 8010 Asbestos Sample Attached is the laboratory report tor bulk identification sample.
refid# XR5Ko2DJdRkgQV3qKgjwL7oVB7 pages
September 29, 1992 Sam Boudreaux Caustic Building 2901 Dow U.S.A 're Dow Crerrvcal CorrD3ny PO Box `50 P'aauermre LOjis.ara 70765-0'50 Asbestos.
refid# wr0XygKdjwgnDDeGe11ZGmj4E5 pages
April 27,1992 Dow U.S.A.
refid# LJqe9BaGrmay8ROG0DrJrpLX3 pages
LOUISIANA DIVISION CONSOLIDATED AUDIT DATES: TIME: PLACE: Poly "A" Plant May 28, 29, 30, 1991 7:30 a.m. - 4:00 p.m.
refid# wgbeGnadeDrDkoaoLNEqNL6YJ4 pages