Document Y9kZ6zzgaYZnkaJ3avebgdm1N

THE DOW CHEMICAL COMPANY ELECTRICAL TECHNOLOGY GLOBAL ADMINISTRATIVE GUIDELINE G7A-0099-01 14-JUN-1996 PAGE 1 OF 2 ELECTRICAL SAFETY AND RELIABILITY AUDIT CHECK LIST FOR INCOMING ELECTRICAL SERVICES yy INCOMING SERVICE LOCATION I.D. L IV <* i INCOMING ELECTRICAL SERVICES Yes No N/A 1. Are all the oil-filled devices (oil-filled cutouts, transformers, capacitors, etc.) non~FC3? 2. Are all the insulators for the line, switch, terminator, etc., clean? 3. Is the messenger or static wire grounded at the pole base? _ 4. Are the lightning arresters properly connected and grounded? 5. Is the pole switch operating mechanism in good working order and free of corrosion? 6. Is the pole switch operator handle properly grounded? 7. Are all the equipment and cables properly supported? J~ 8. Is there physical protection (barricade fence, etc.) provided at grade for underground conduit risers? 9. Does the plant have dual feeders? V. 10. Does the plant have transfer capability. 11. Has there been a successful transfer? 12. Is the transfer automatic upon the loss of power? 13. Are the cables adequately and properly supported? 14. Are the cable support blocks constructed of NON-MAGNSTIC Materials? ^___________ THE DOW CHEMICAL COMPANY ELECTRICAL TECHNOLOGY GLOBAL ADMINISTRATIVE GUIDELINE G7A-0099-01 14-JUN-1996 PAGE 2 OF 2 Yes No M/A 15. Is the pole-line hardware adequate? 16. Are the lashing rods made of corrosion resistant material? 17. Is the wood pole in good condition? 18. Are oil fused cutouts in good condition? 19. Is the pole mounted transformer or capacitor free of leaking oil? 20. Are fences grounded? 21. Are the coordinates of underground cables known and on drawings? Incoming Electrical Services Index Score: DO A 045097 CONFIDENTIAL