Refine
Estimated Years
3,839 results foundRefine Search
Aug 1, 2023 Comment on Proposed Restriction of PFAS Japan Valve Manufacturers' Association (JVMA) Japan Valve Manufacturers' Association (JVMA) appreciates the opportunity to provide comments to the PFAS restriction proposal. 1.
Document imageDocument imageDocument imageDocument image
refid# JqQQ2p23MmyjQdXzDaXeZGZa4 pages
.
Document imageDocument imageDocument imageDocument image
refid# 8R5rON239nZJ9EOemrKxBJrxm6 pages
There should be an exemption to this restriction for fluoropolymers We believe that there should be an exemption to this restriction for fluoropolymers.
Document image
refid# p2MQwO7x4z5YVe36XQovMOypk1 page
LIFE SAFETY DISTRIBUTION GmbH Z.A.
Document imageDocument imageDocument imageDocument image
refid# 5Jde6wKx3eDoo7K21VVXr5pD22 pages
Fluororesin Products for Magnetic flow meters.
Document imageDocument imageDocument imageDocument image
refid# jmmXevJ7V9YJx14zK249Lqxx523 pages
EU PFAS restriction proposal: Umicore's position Umicore supports a science-based approach to environmental concerns and risk mitigation/management.
Document imageDocument image
refid# EqV5djrma79NRwx9jo73V29OR2 pages
CERTIFICAT / CERTIFICATE N 55.22.221 dlivr pour le systme de protection incendie des armoires lectriques (SPAERI) delivered for the protection of electrical cabinets against fire system (SPECF) Marque commerciale / Brand name : EXXFIRE Rfrence commerciale / Commercial reference : EXX-750CNF / EXX-1500CNF / EXX-2250CNF Caractristiques techniques / Technical characteristics Dtection / Detection Extinction / Extinction Type de circuit de dtection / Detection path type: Type de dtection / Detection type: Classe de sensibilit / Sensibility class: Longueur max. de la totalit des rseaux de prlvement / Max. length of the totality of sampling devices: Nb max. d'lments sensibles / Max. number of sensitive elements: Agent extincteur / Extinguishing agent: Volume maximal protg / Maximal protected volume: EXX750CNF EXX1500CNF EXX2250CNF Intgr / Integrated Dtecteur de fume par aspiration Aspirating smoke detectors C uniquement / C only 2.5m 1.5m3 3 IG100 3m3 4.5m3 Unit de signalisation / Signaling unit Type d'enveloppe / Type of enclosure: Plage de T de fonctionnement / Operational T: Code IP / IP Code : Mtallique / Metallic -5C +40C / -5C to +40C IP30 Equipement d'alimentation lectrique / Power supply equipment: Fonctions optionnelles avec exigences / Optional functions with requirements: Intgr / Integrated Temporisation du signal d'mission Delay of extinguishing signal Performances certifies / Certified performances Exigences fonctionnelles (dtection, mission de l'agent extincteur, extinction d'un feu lectrique) Operational requirements (detection, extinguishing agent emission, suppression of an electrical fire) Equipement d'alimentation lectrique / Power supply equipment Domaine d'application / Scope Protection incendie des armoires lectriques / Protection of electrical cabinet against fire Commercialise par / Marketed by : ExxFire B.V.
Document image
refid# pmKNxqOJ8wLqyjGEaXZaxjwQ71 page
Regarding: ANNEX XV RESTRICTION REPORT - Per- and polyfluoroalkyl substances (PFASs) Information about the High Persistence of PFASs and a new method for Destruction of PFASs Submitted by Luke Lu from China Date: September 22, 2023 In the first paragraph under the subheading "Concerns" in the section "Summary" of page 1 of the Annex XV Restriction Report - Per- and Polyfluoroalkyl Substances (PFASs), the following is stated: "The main concern for all PFASs and/or their degradation products that are in the scope of this restriction proposal is the very high persistence, exceeding the criterion for very persistent (vP) according to Annex XIII of the REACH Regulation by far.
Document image
refid# Vno9LYYzJKL5ZKzp9O9Ea8B81 page
September 24, 2023 Non-confidential comments for Annex XV restriction report: Health-related socioeconomic costs linked to PFAS exposure Dear Madame or Sir, We welcome the opportunity to provide input on the restriction proposal regarding per- and polyfluoroalkyl substances (PFAS).
Document imageDocument imageDocument imageDocument image
refid# 5gxBBOKN479pwRjQk2jeV9p810 pages
Positionspapier PFAS-Beschrnkung Positionspapier zum Beschrnkungsvorschlag fr die Stoffgruppe PFAS: Ausnahmeregelung fr Solarindustrie Stand: 24.9.2023 Als Clean-Tech-Unternehmen setzt sich Meyer Burger fr nachhaltiges Wirtschaften und den Schutz der natrlichen Ressourcen ein.
Document imageDocument imageDocument image
refid# 77R2NgJ5MzL1r9bkJ0XVZ4O63 pages
POSITION | CHEMICAL POLICY | RESTRICTION PFAS-Restriction Evaluation of the restriction proposal 24 April 2023 Background On 13 January 2023, the competent authorities from Germany, the Netherlands, Denmark, Sweden and Norway submitted a restriction dossier to restrict all PFAS (per- and polyfluoroalkyl substances).
Document imageDocument imageDocument imageDocument image
refid# 3e1mX6OnKY4ek21MpZL4ZYgkx12 pages
Integer.net September 25, 2023 To: European Chemicals Agency Re: PFAS Restriction Commentary Dear ECHA Consultation Committee, Integer manufactures complete medical devices as well as medical device components for many of the largest medical device companies in the world.
Document imageDocument imageDocument imageDocument image
refid# 71Kmn2r3jaOZpraX14jzeGp9810 pages
From: To: PFASs ChernG Cc: Subject: Attachments: Dear Colleagues, PFAS WG 25th October Webex PFAS WG webex 25 October 21 Final Agenda.docx I am happy to share with you the final agenda (attached) and the webex details (below).
Document imageDocument image
refid# KG1Dk54M6XEy6zy59pzdedzvw2 pages
Document imageDocument imageDocument imageDocument image
refid# k9zgkxJK75zvqedNKvnDZRL0q13 pages
Name of document in folder WP0-M_1-2_WP0 meeting January 2020_File_Received_27-01-2020 WP0-M_2-2_WP0 meeting February 2020_File_Received_24-02-2020 WP0-M_3-2_WP0 meeting March 2020_File_Received_23-03-2020 WP0-M_3-4_WP0 meeting March 2020_File_Received_23-03-2020 WP0-M_3-5_WP0 meeting March 2020_File_Received_23-03-2020 WP0-M_3-8_WP0 meeting March 2020_File_Received_23-03-2020 WP0-M_4-1_WP0 meeting April 2020_File_Received_20-04-2020 WP0-M_4-2_WP0 meeting April 2020_File_Received_20-04-2020 WP0-M_4-3_WP0 meeting April 2020_File_Received_20-04-2020 WP0-M_4-4_WP0 meeting April 2020_File_Received_20-04-2020 WP0-M_4-9_WP0 meeting April 2020_File_Received_20-04-2020 WP0-M_5-1_WP0 meeting May 2020_File_Received_13-05-2020 WP0-M_5-2_WP0 meeting May 2020_File_Received_13-05-2020 WP0-M_5-3_WP0 meeting May 2020_File_Received_13-05-2020 WP0-M_5-4_WP0 meeting May 2020_File_Received_13-05-2020 WP0-M_5-5_WP0 meeting May 2020_File_Received_13-05-2020 WP0-M_6-2_WP0 meeting June 2020_File_Received_22-06-2020 WP0-M_6-3_WP0 meeting June 2020_File_Received_22-06-2020 WP0-M_6-5_WP0 meeting June 2020_File_Received_22-06-2020 WP0-M_6-6_WP0 meeting June 2020_File_Received_22-06-2020 WP0-M_7-1_WP0 meeting July 2020_File_Received_13-07-2020 WP0-M_7-2_WP0 meeting July 2020_File_Received_13-07-2020 WP0-M_7-3_WP0 meeting July 2020_File_Received_13-07-2020 WP0-M_7-4_WP0 meeting July 2020_File_Received_13-07-2020 WP0-M_8-2B_WP0 meeting August 2020_Email_Received_11-09-2020_ATT WP0-M_8-2C_WP0 meeting August 2020_Email_Received_11-09-2020_ATT WP0-M_8-2D_WP0 meeting August 2020_Email_Received_11-09-2020_ATT WP0-M_9-1B_WP0 meeting September 2020_File_Received_23-09-2020 WP0-M_9-1C_WP0 meeting September 2020_File_Received_23-09-2020 WP0-M_9-1D_WP0 meeting September 2020_File_Received_23-09-2020 WP0-M_9-2_WP0 meeting September 2020_File_Received_25-09-2020 WP0-M_9-3A_WP0 meeting September 2020_File_Received_01-10-2020 WP0-M_9-3C_WP0 meeting September 2020_File_Received_01-10-2020 WP0-M_10-1C_WP0 meeting October 2020_Email_Received_20-10-2020_ATT WP0-M_10-1D_WP0 meeting October 2020_Email_Received_20-10-2020_ATT WP0-M_10-2A_WP0 meeting October 2020_File_Received_29-10-2020 WP0-M_10-2B_WP0 meeting October 2020_File_Received_29-10-2020 WP0-M_11-1B_WP0 meeting November 2020_Email_Received_17-11-2021_ATT WP0-M_11-1C_WP0 meeting November 2020_Email_Received_17-11-2021_ATT WP0-M_11-2A_WP0 meeting November 2020_File_Received_26-11-2021 WP0-M_11-2B_WP0 meeting November 2020_File_Received_26-11-2021 WP0-M_11-2C_WP0 meeting November 2020_File_Received_26-11-2021 WP0-M_11-2D_WP0 meeting November 2020_File_Received_26-11-2021 WP0-M_12-1B_WP0 meeting December 2020_File_Received_16-12-2020 WP0-M_12-2A_WP0 meeting December 2020_File_Received_11-01-2021 WP0-M_12-2B_WP0 meeting December 2020_File_Received_11-01-2021 WP0-M_12-2E_WP0 meeting December 2020_File_Received_11-01-2021 WP0-M_12-2F_WP0 meeting December 2020_File_Received_11-01-2021 WP0-M_12-3B_WP0 meeting December 2020_File_Sent_11-01-2021 WP0-M_13-1B_WP0 meeting January 2021_File_Received_21-01-2021 WP0-M_13-1C_WP0 meeting January 2021_File_Received_21-01-2021 WP0-M_13-2B_WP0 meeting January 2021_Email_Received_26-01-2021_ATT WP0-M_13-2C_WP0 meeting January 2021_Email_Received_26-01-2021_ATT WP0-M_13-2D_WP0 meeting January 2021_Email_Received_26-01-2021_ATT WP0-M_14-1D_WP0 meeting February 2021_Email_Thread_16-02-2021_ATT WP0-M_14-1E_WP0 meeting February 2021_Email_Thread_16-02-2021_ATT WP0-M_14-1F_WP0 meeting February 2021_Email_Thread_16-02-2021_ATT WP0-M_14-2B_WP0 meeting February 2021_Email_Thread_12-03-2021_ATT WP0-M_14-2C_WP0 meeting February 2021_Email_Thread_22-02-2021_ATT WP0-M_14-3B_WP0 meeting February 2021_Email_Thread_25-02-2021_ATT WP0-M_14-3C_WP0 meeting February 2021_Email_Thread_25-02-2021_ATT WP0-M_14-3D_WP0 meeting February 2021_Email_Thread_25-02-2021_ATT WP0-M_15-1D_WP0 meeting March 2021_Email_Received_16-03-2021_ATT WP0-M_15-1E_WP0 meeting March 2021_Email_Received_16-03-2021_ATT WP0-M_15-1F_WP0 meeting March 2021_Email_Received_16-03-2021_ATT WP0-M_15-2B_WP0 meeting March 2021_Email_Received_26-03-2021_ATT WP0-M_15-2C_WP0 meeting March 2021_Email_Received_26-03-2021_ATT WP0-M_15-2D_WP0 meeting March 2021_Email_Received_26-03-2021_ATT WP0-M_15-2E_WP0 meeting March 2021_Email_Received_26-03-2021_ATT WP0-M_16-1F_WP0 meeting April 2021_Email_Thread_13-04-2021_ATT WP0-M_16-1G_WP0 meeting April 2021_Email_Thread_13-04-2021_ATT WP0-M_16-1J_WP0 meeting April 2021_Email_Thread_13-04-2021_ATT WP0-M_16-1K_WP0 meeting April 2021_Email_Thread_13-04-2021_ATT WP0-M_16-2C_WP0 meeting April 2021_Email_Thread_20-04-2021_ATT WP0-M_16-2D_WP0 meeting April 2021_Email_Thread_20-04-2021_ATT WP0-M_16-2E_WP0 meeting April 2021_Email_Thread_20-04-2021_ATT WP0-M_17-1B_WP0 meeting May 2021_Email_Thread_10-06-2021_ATT WP0-M_17-1C_WP0 meeting May 2021_Email_Thread_10-06-2021_ATT WP0-M_17-1D_WP0 meeting May 2021_Email_Thread_04-06-2021_ATT WP0-M_17-1E_WP0 meeting May 2021_Email_Thread_04-06-2021_ATT WP0-M_17-1F_WP0 meeting May 2021_Email_Thread_05-05-2021_ATT WP0-M_17-1G_WP0 meeting May 2021_Email_Thread_05-05-2021_ATT WP0-M_17-2B_WP0 meeting May 2021_Email_Received_10-05-2021_ATT WP0-M_17-2C_WP0 meeting May 2021_Email_Received_10-05-2021_ATT WP0-M_17-2F_WP0 meeting May 2021_Email_Received_10-05-2021_ATT WP0-M_17-4B_WP0 meeting May 2021_Email_Thread_03-06-2021_ATT WP0-M_17-4C_WP0 meeting May 2021_Email_Thread_03-06-2021_ATT WP0-M_17-4D_WP0 meeting May 2021_Email_Thread_20-05-2021_ATT WP0-M_17-4E_WP0 meeting May 2021_Email_Thread_20-05-2021_ATT WP0-M_17-4F_WP0 meeting May 2021_Email_Thread_20-05-2021_ATT WP0-M_17-4G_WP0 meeting May 2021_Email_Thread_20-05-2021_ATT WP0-M_18-1C_WP0 meeting June 2021_Email_Thread_15-06-2021_ATT WP0-M_18-1E_WP0 meeting June 2021_Email_Thread_15-06-2021_ATT WP0-M_18-1F_WP0 meeting June 2021_Email_Thread_15-06-2021_ATT WP0-M_18-1G_WP0 meeting June 2021_Email_Thread_15-06-2021_ATT WP0-M_18-2C_WP0 meeting June 2021_Email_Thread_15-06-2021_ATT WP0-M_18-3B_WP0 meeting June 2021_Email_Thread_18-06-2021_ATT WP0-M_18-3C_WP0 meeting June 2021_Email_Thread_18-06-2021_ATT WP0-M_18-4C_WP0 meeting June 2021_Email_Thread_08-07-2021_ATT WP0-M_18-4D_WP0 meeting June 2021_Email_Thread_22-06-2021_ATT WP0-M_18-4E_WP0 meeting June 2021_Email_Thread_22-06-2021_ATT WP0-M_18-4F_WP0 meeting June 2021_Email_Thread_22-06-2021_ATT WP0-M_18-5A_WP0 meeting June 2021_Email_Thread_24-09-2021 WP0-M_18-5B_WP0 meeting June 2021_Email_Thread_24-09-2021_ATT WP0-M_18-5C_WP0 meeting June 2021_Email_Thread_24-09-2021_ATT WP0-M_18-5D_WP0 meeting June 2021_Email_Thread_09-08-2021_ATT WP0-M_18-5E_WP0 meeting June 2021_Email_Thread_16-07-2021_ATT WP0-M_19-1B_WP0 meeting August 2021_Email_Received_23-08-2021_ATT WP0-M_19-1C_WP0 meeting August 2021_Email_Received_23-08-2021_ATT WP0-M_19-1D_WP0 meeting August 2021_Email_Received_23-08-2021_ATT WP0-M_19-2B_WP0 meeting August 2021_Email_Received_01-09-2021_ATT WP0-M_19-2C_WP0 meeting August 2021_Email_Received_01-09-2021_ATT WP0-M_19-2D_WP0 meeting August 2021_Email_Received_01-09-2021_ATT WP0-M_20-1B_WP0 meeting September 2021_Email_Received_14-09-2021_ATT WP0-M_20-2B_WP0 meeting September 2021_Email_Received_19-09-2021_ATT WP0-M_20-3B_WP0 meeting September 2021_Email_Received_21-09-2021_ATT WP0-M_20-3C_WP0 meeting September 2021_Email_Received_21-09-2021_ATT WP0-M_20-3D_WP0 meeting September 2021_Email_Received_21-09-2021_ATT WP0-M_21-1C_WP0 meeting October 2021_Email_Received_12-10-2021_ATT WP0-M_21-1D_WP0 meeting October 2021_Email_Received_12-10-2021_ATT WP0-M_21-2C_WP0 meeting October 2021_Email_Received_19-10-2021_ATT WP0-M_22-1E_WP0 meeting November 2021_Email_Thread_09-11-2021_ATT WP0-M_22-1F_WP0 meeting November 2021_Email_Thread_09-11-2021_ATT WP0-M_22-2B_WP0 meeting November 2021_Email_Received_17-11-2021_ATT WP0-M_22-2C_WP0 meeting November 2021_Email_Received_17-11-2021_ATT WP0-M_22-2D_WP0 meeting November 2021_Email_Received_17-11-2021_ATT WP0-M_23-1C_WP0 meeting December 2021_Email_Received_14-12-2021_ATT WP0-M_23-1D_WP0 meeting December 2021_Email_Received_14-12-2021_ATT WP0-M_23-2B_WP0 meeting December 2021_Email_Received_04-01-2022_ATT WP0-M_23-2C_WP0 meeting December 2021_Email_Received_04-01-2022_ATT WP0-M_23-2D_WP0 meeting December 2021_Email_Received_04-01-2022_ATT WP0-M_23-3_WP0 meeting December 2021_Email_Thread_14-01-2022 WP0-M_24-1B_Comments draft entry text_Email_Thread_19-01-2022_ATT WP0-M_24-1C_Comments draft entry text_Email_Thread_17-12-2021_ATT WP0-M_24-2A_Comments draft entry text_Email_Thread_28-01-2022 WP0-M_24-2B_Comments draft entry text_Email_Thread_28-01-2022_ATT WP0-M_24-2C_Comments draft entry text_Email_Thread_28-01-2022_ATT WP0-M_24-2D_Comments draft entry text_Email_Thread_21-01-2022_ATT WP0-M_24-2E_Comments draft entry text_Email_Thread_21-01-2022_ATT WP0-M_24-2F_Comments draft entry text_Email_Thread_20-01-2022_ATT WP0-M_24-3A_Comments draft entry text_Email_Thread_21-01-2022 WP0-M_24-3B_Comments draft entry text_Email_Thread_21-01-2022_ATT WP0-M_25-1B_WP0 meeting January 2022_Email_Received_18-01-2022_ATT WP0-M_25-1C_WP0 meeting January 2022_Email_Received_18-01-2022_ATT WP0-M_25-2B_WP0 meeting January 2022_Email_Received_26-01-2022_ATT WP0-M_25-2C_WP0 meeting January 2022_Email_Received_26-01-2022_ATT WP0-M_25-2D_WP0 meeting January 2022_Email_Received_26-01-2022_ATT WP0-M_25-2E_WP0 meeting January 2022_Email_Received_26-01-2022_ATT WP0-M_26-1B_WP0 meeting February 2022_Email_Received_22-02-2022_ATT WP0-M_26-1D_WP0 meeting February 2022_Email_Received_22-02-2022_ATT WP0-M_26-1E_WP0 meeting February 2022_Email_Received_22-02-2022_ATT WP0-M_26-1F_WP0 meeting February 2022_Email_Received_22-02-2022_ATT WP0-M_26-2B_WP0 meeting February 2022_Email_Received_02-03-2022_ATT WP0-M_26-2C_WP0 meeting February 2022_Email_Received_02-03-2022_ATT WP0-M_26-2D_WP0 meeting February 2022_Email_Received_02-03-2022_ATT WP0-M_26-2E_WP0 meeting February 2022_Email_Received_02-03-2022_ATT WP0-M_27-1B_Invitation Den Haag_Email_Thread_25-03-2022_ATT W
Document imageDocument imageDocument imageDocument image
refid# mqjvb8gpwgBg7kNGYR5EG9E8Z24 pages