Refine
Estimated Years 2020-2029Clear
7,598 results foundRefine Search
Under 40 C.F.R. 82.152, "disposal" means the process leading to and including: (1) the discharge, deposit, dumping or placing of any discarded appliance into or on any land or water; (2) the disassembly of any appliance for discharge, deposit, dumping or placing of its discarded component parts into or on any land or water; (3) the vandalism of any appliance such that the refrigerant is released into the environment or would be released into the environment if it had not been recovered prior to the destructive activity; (4) the disassembly of any appliance for reuse of its component parts; or (5) the recycling of any appliance for scrap. 8.
Document imageDocument imageDocument imageDocument image
refid# wrDmrZ9ZOY9qR49aqY6vnGXzB7 pages
Pearsonia Latitude: 36.813350, Longitude: -96.474391 Foraker, OK, 74652 PO BOX 599 Goddard, KS, 76052 Osage County, OK 918-798-4510 Mike Novy Owner novyoil@aol.com FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: n/a OKU002219 n/a 211111 1311 Personnel participating in inspection: Matthew Allen EPA/Region 6 ECDW Inspector EPA Lead Inspector Signature/Date Supervisor Signature/Date MATTHEW ALLEN Date: 2025.09.08 10:31:48 -05'00' Digitally signed by MATTHEW ALLEN Matthew Allen Date JEANNE ECKHART Date: 2025.09.09 06:19:28 -05'00' Digitally signed by JEANNE ECKHART Jeanne Eckhart Date 6ENFORM-019-R8.2 (02/12/2020) 1 Section I - INTRODUCTION Novy Oil and Gas Inc. / Pearsonia Lease (CWA) Inspection Date 07/21/2025 PURPOSE OF THE INSPECTION EPA Region 6 Inspector, Matthew Allen, arrived at the Novy Oil and Gas Inc. - Pearsonia Lease (EPA ID No.
Document imageDocument imageDocument imageDocument image
refid# 2J0K9k0e4EBn30Evm7Md3e6Kg22 pages
An uncontrolled import of products containing PFASs would lead to considerable competitive disadvantages.
Document imageDocument imageDocument imageDocument image
refid# MNkQE05am0Mqgn6mEEQG31e75 pages
Ref.
Document imageDocument imageDocument imageDocument image
refid# Qkw8B3Mgen9jLzzaQo13Gj4B66 pages
Position Paper VDMA Environmental Affairs and Sustainability PFAS restriction under the REACH Regulation Background: German authorities in cooperation with authorities of the Netherlands, Denmark, Norway and Sweden prepared a restriction dossier for per- and polyfluoroalkyl substances (PFAS) under the REACH Regulation.
Document imageDocument imageDocument imageDocument image
refid# dQ1jBqDQ8aR9gLoZ0yzj5bqzR5 pages
NON CONFIDENTIAL 3 DRIVING ADVANCEMENTS IN GLOBAL MOBILITY Company Background 4 DRIVING ADVANCEMENTS IN GLOBAL MOBILITY Solutions for cleaner, more efficient, comfortable and reliable performance Market leading product, technology & brand portfolio Design, engineering & lifecycle management expertise Advantaged global end-to-end supply chain capabilities NON CONFIDENTIAL 5 Tenneco Today 71,000 Global team members 38 Globally networked engineering & technical centers 196 Manufacturing sites worldwide Uniquely Strong Global Capabilities NON CONFIDENTIAL 29 Aftermarket distribution centers 6 Global Manufacturing and Distribution Facilities Manufacturing plants Distribution centers Technical centers AMER EMEA APAC Team members 29,500 27,000 14,500 Manufacturing plants 64 69 63 Distribution centers 14 12 3 Technical centers 16 14 8 NON CONFIDENTIAL 7 2021 Product Range and Geographic Coverage Product Application VA Revenue Aftermarket & OES OE LV 37% Emissions/Engine 63% 63% Agnostic to OE LV ICE 14% OE LV Suspension/NVH/Chassis 18% Commercial truck, Off-Highway, Industrial & Other Region ROW 10% 41% North America China 13% VA Revenue 36% Europe See Tenneco's press release dated February 23, 2022 for certain reconciliations of GAAP to non-GAAP results.
Document imageDocument imageDocument imageDocument image
refid# 109LGZ8OYjYo5J8XnJbzmKXpd25 pages
At the time of the inspection, three 55-gallon containers of universal waste lead acid batteries were observed to be closed, labeled with appropriate universal waste labeling, and marked with accumulation start dates of less than one year.
Document imageDocument imageDocument imageDocument image
refid# 16L7QZKMXQn3p2b2wyvQvvkE7 pages
The tank can be isolated from overpressure protection if both valves are closed at the same time, which could lead to an uncontrolled release.
Document imageDocument imageDocument imageDocument image
refid# p29692zn6jMM8RM7RYL6amzK76 pages
UNITED STATES ENVIRONMENTAL PROTECTION AGENCY REGION 5 77 WEST JACKSON BOULEVARD CHICAGO, ILLINOIS 60604 SUBJECT: FROM: THRU: TO: CLEAN AIR ACT INSPECTION REPORT Alter Trading Corporation, Milwaukee, WI Laura Steel, Environmental Engineer AECAB (MI/WI) Sarah Marshall, Section Supervisor AECAB (MI/WI) File BASIC INFORMATION Facility Name: Alter Trading Corporation - Milwaukee (Alter) Facility Location: 1640 W Bruce Street, Milwaukee, WI 53204 Date of Inspection: February 4, 2022 EPA Inspector(s): 1.
Document imageDocument imageDocument imageDocument image
refid# j5gGpvMbQLYkJa2EaxV10xqO7 pages
Sincerely, Prideaux, Digitally signed by Prideaux, LisaKay LisaKay Date: 2022.08.11 14:10:55 -06'00' Lisa-kay Prideaux NPDES and Wetlands Enforcement Section Enforcement and Compliance Assurance Division Enclosures: 1) NPDES Inspection Report 2) Photo Log cc (electronic): The Honorable Tom McDonald, Chairman, CSKT (email) Wilhelmina Keenan, Environmental Director, CSKT (email) Evan Smith, Water Quality Regulatory Specialist, CSKT (email) NPDES Inspection Report - Wastewater Lagoon National Database Information Inspection Date: June 14, 2022 Inspection Type: Compliance Evaluation Inspection Entry/Exit Time: 13:00/16:00 NPDES ID Number: MT0021474 NAICS Code: 22132 (Sewage Treatment) Inspection ID: 200206_MT0021474 Lead inspector and affiliation: Lisa-kay Prideaux / US EPA Region 8 Montana Operations Office Inspector and affiliation: Evan Smith / The Confederated Salish & Kootenai Tribes of the Flathead Reservation Facility Location Information (Name/Location/ Mailing Address) Site/Facility Name & Location: Ronan Wastewater Treatment Lagoons 36780 Mink Lane Ronan, Montana 59864 Mail Report to: Mayor Chris Adler 207 Main Street SW, Suite A Ronan, Montana 59864 Contact Information Facility Contacts: Name(s)/Title Dan Miller / Public Works Director / City of Ronan / present during inspection Person/Company meeting definition of "Operator" Authorized Official(s) Trey Sinclair / Wastewater Operator / City of Ronan / present during inspection Chris Adler / City of Ronan Mayor / not present Tribe Representative(s) Indian Health Service Representative(s) Evan Smith / The Confederated Salish & Kootenai Tribes of the Flathead Reservation / present during inspection None present Permit Information Is the permit on site and available?
Document imageDocument imageDocument imageDocument image
refid# 44XNb46O191o9rywvJm6475ep7 pages
An uncontrolled import of products containing PFASs would lead to considerable competitive disadvantages.
Document imageDocument imageDocument imageDocument image
refid# a152DEYe6Gv8BJDyy8MgDK94b5 pages
Jeff Dye, Landfill Gas Lead - King County a,b 6.
Document imageDocument imageDocument imageDocument image
refid# BR4O6Jm0m4rkoMY7omLJged6J7 pages
PARTICIPANTS Albaugh LLC Russ Epperson, EHS Manager Email: russellbe@albaughllc.com Valerie Murawski, Environmental Lead Email: valeriem@allbaughllc.com Missouri Department of Natural Resources Karla Pierce, Environmental Section Chief Olivia Jackson, Environmental Unit Chief U.
Document imageDocument imageDocument imageDocument image
refid# x58YJ4xvM6Z75nvropw32YDyg7 pages
In December 2023, the ACOE, consistent with an existing memorandum of agreement with EPA, referred this matter to EPA to proceed as the lead enforcement agency, since a CWA Section 404 permit for the discharge of dredged or fill material to waters of the United States was not obtained by the responsible parties, the property owner or the contractors.
Document imageDocument imageDocument imageDocument image
refid# ZBQgxN2kpV5qameJerj2YM66V14 pages
Region 6 - Enforcement & Compliance Assurance Division INSPECTION REPORT Inspection Date(s): Media Program: Regulatory Program(s) May 9, 2024 Water NPDES Stormwater/ CWA 402 Company Name: Facility Name: Facility Physical Location: (city, state, zip code) Mailing address: (city, state, zip code) County/Parish: Facility Phone Number Facility Contact 1: Facility Contact 2: Tri Pointe Homes DFW, LLC Painted Tree Village District South (Phase 1) Taylor Burk Dr and Painted Trail Dr McKinney, TX, 75071 6201 W Plano Pkwy STE 150 Plano, TX, 75093 Collin 817-410-1037 Bruce French Vice President (Tri Pointe Homes DFW, LLC) Bruce.French@TriPointeHomes.com Jeremy Boucher Consultant (EnviroServe) jboucher@enviroserve.co FRS Number: Identification/Permit Number: Media Identifier Number: NAICS: SIC: N/A TXR1582KY N/A 236117 1521 Personnel participating in inspection: Destinee Agwuna 6EN-WR Carol Johnson 6EN-WS Sharron Crayton 6EN-WS Inspector/Enforcement Officer Inspector/Enforcement Officer Inspector/Enforcement Officer EPA Lead Inspector Signature/Date DESTINEE AGWUNA Date: 2024.07.01 14:31:24 -05'00' Digitally signed by DESTINEE AGWUNA Destinee Agwuna 7/1/2024 Date Supervisor Signature/Date ANTHONY LOSTON Date: 2024.07.02 10:53:45 -05'00' Digitally signed by ANTHONY LOSTON Anthony Loston Date 6ENFORM-019-R8.2 (02/12/2020) 1 Section I - INTRODUCTION Tri Pointe Homes DFW, LLC / Painted Tree Permit #: TXR1582KY Inspection Date: 05/09/2024 PURPOSE OF THE INSPECTION U.S.
Document imageDocument imageDocument imageDocument image
refid# q4Jx42DYK5EN6Xx6D0OjbVqn16 pages