Refine
Estimated Years 1990-1999Clear
21,210 results foundRefine Search
i f. \ FILE COPY PPG INDUSTRIES.
Document imageDocument imageDocument image
refid# oegkLdNgzn9nV37rYxRj1J2zw3 pages
09-10-1993 09:4S 3184914549 Chtmlctli TRAF P.01 pace i op i Tssnr- mm-------- 1 MWimWBTft. " ` " ` " - - |WJ|f" BIIWW~ cs 83048ft-1 D C M PC 1 OF 1 l09| 09193 9/9/93 mfJO 00-027-3359 UISTA CHEMICAL COMPANY NEW HUY 25 ABERDEEN MS 39730 l OUITO OO-028-eftSO P UISTA CHEMICAL COMPANY PURCHASING DEPARTMENT P 0 BOX 19029 HOUSTON TX 77224 iHimpwr HhWT nw.
Document image
refid# DMpYMVO391pNZQdqQ550NVnV41 page
Ethanolamines/Glycol Ethers Tier 3 Safework/Operating Procedure Section Number: Issue Number: Original Date: Revision Date: Title: References: 1709 1.3 11-11-91 Author: Micheal Viator 12-11-95 Sundyne Field Switch Test Glossary Of Equipment Identification (Text #114) 1709 Sundyne Field Switch Test 1.0 Objective: 1.1 To ensure main switch gear driver will not start in preparation for pump maintenance. 2.0 Responsibility: 2.1 It is the responsibility of the operations supervisor and the senior operations specialist to ensure the safe and efficient completion of this procedure. 2.2 It is the responsibility of the senior operations specialist and the operations specialist to ensure that this procedure is fully complied with. 3.0 Special Notations: 3.1 When testing the field switch on a sundyne pump, remember you have to have the auxiliary oil pump on and the oil pressure has to be 15 pounds or more before the main driver will start.
Document imageDocument image
refid# jBqqjRYKkXd00rL8ojdLXpQqp2 pages
Ethanolamines/Glycol Ethers Tier 3 Procedure Section Number: Issue Number: Original Date: Revision Date: Title: References: 627 1.3 07-15-91 Author: Mike Viator 12-29-95 Changing Deionized Water Cylinder Glossary Of Equipment Identification (Text #114) 627.
Document imageDocument imageDocument image
refid# jBaXmm3VyBNxRzgRoVva68m6R3 pages
Ethanolamines/Glycol Ethers Tier 3 Procedure Section Number: 651 Issue Number: 1.2 Original Date: 02-09-93 Author: Revision Date: 12/29/95 Title: Running A Boiling Range References: Glossary Of Equipment Id (Text # 14) Astm D 1078-86 651 Running A Boiling Range 1.0 Objective: 1.1 To provide a safe and accurate procedure for running boiling ranges. 2.0 Responsibility: 2.1 It is the responsibility of the operations supervisor to ensure adequate equipment, resources, and training are available to conduct this test properly. 2.2 The lab technician is responsible to the operations supervisor to ensure that the equipment involved with this test is maintained and in good working condition.
Document imageDocument imageDocument imageDocument image
refid# pmGov3r39rMVmmKMBvV9XbbD74 pages
ABERDEEN VCM STATUS REPORT FOR JULY 1 & 2, 1990 FROM: Amy Bagwell - Aberdeen CCt DCS, JDO, JMV, LDH, AEV FAX TO: Fat Hamilton - Houston, SAT (Fax No.: 713-508-3429) Bill Hunnicutt - Houston, SAT (Fax No.: 713-586-3429) *******)MAr(c*h*i*e**F*r*u*g*e*****-**L*C**V*C*M***P*l*a*n*t*********(*F*a*x**N**o*.*: **3*1*8*-4**9*4*-5**0*5*9*)* VCM TANK INVENTORY: Sphere: 2,111,332 Tanks: 156,132 2,267,464 VCM RAILCAR INVENTORY: 0 TOTAL VCM INVENTORY: 2,267,464 VCM USAGE: 2,819,876 AVG USAGE: 1,320,000 MTD USAGE: 2,819,676 DAYS OF INVENTORY PLANT - 1.0 VCM CARS OFFLOADED: Total Lbs.
Document image
refid# YrNxdZQD4y02G8mv54RwBBn5k1 page
RRT.KASB The Dow Chemical Company, Union Carbide Corporation, formerly known as Union Carbide Chemicals and Plastics Company, Conoco Inc., formerly known as Continental Oil Company and B.F.Goodrich Company, their respective heirs, successors, predecessors, subsidiaries, assigns, directors, officers, agents, servants, attorneys, employees, former directors, former officers, former employees agree to release and discharge each other and their respective insurers for and from all claims of any kind and nature which have arisen or may result from the injuries and illness suffered by John H.
Document imageDocument image
refid# 10RNK1K4DaNaJQxkEZpd5qBvX2 pages
SETTLEMENT^AGREEMENT Agreement made this day of , 1992, by and between Alice L.
Document imageDocument imageDocument imageDocument image
refid# 2vBgBw7BgkR48p9gGwKgdRL54 pages
Tier Two / Emergency and Hazardous Chemical Inventory Page___ 1 of ___ 2 Facility Identification...
Document imageDocument image
refid# wKz1ov7Rdk891Gw38rJwGE78B2 pages
PPG INDUSTRIES,INC CHEMICALS P 0.
Document imageDocument imageDocument image
refid# ykYavZv686awBDZKBY16gQVGX3 pages
Section Number: Issue Number: Original Date: Revision Date: Title: References: Ethanolamines/Glycol Ethers Tier 3 Procedure 628 1.5 08-08-91 Author: Dan Jones 01-15-98 Outfall Oil And Grease Sampling Glossary Of Equipment Identification (Text #114) 628.
Document imageDocument imageDocument image
refid# qODbNyZEmj0GqX5JqqG4qrzj3 pages
Ethanolamines/Glycol Ethers Tier 3 Procedure Section Number: Issue Number: Original Date: Revision Date: Title: References: 1706 1.5 11-11-91 Author: Michael Viator 03-19-98 Leak Checking Distillation Towers Glossary For Equipment Identification (Text #114) 1706 Leak Checking Distillation Towers 1.0 Objective: 1.1 To determine, by pulling a full vacuum, the leak rate of any given distillation tower. 1.2 To ensure that on startup no air is introduced into any tower affecting product quality. 2.0 Responsibility: 2.1 It is the responsibility of the operations personnel to ensure that this procedure is fully complied with in a safe and efficient manner. 3.0 Special Notation: 3.1 EJ-180/280 will pull all towers onto the control charts except the following: 3.1.1 T-140 = 0-50 scale 3.1.2 T-250 = 0 - 50 scale 3.1.3 T-260 = 0 - 15 scale 3.1.4 T-271 =0 - 10 scale 4.0 Procedure: 4.1 Close all lines to and from tower.
Document imageDocument image
refid# MG3aYoDR4Jyp3boEpLm6Ojara2 pages
+-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------1- Date Printed: 08-15-1996 Page 1 LA-MAR-KA MSDS for SODIUM THIOSULFATE SOLUTIONS 1 -PRODUCT IDENTIFICATION PRODUCT NAME: SODIUM THIOSULFATE SOLUTIONS COMMON SYNONYMS: SODIUM THIOSULFATE SOLUTIONS,.001N TO STANDARD , 400 ppm Sodium Thiosulfate Solution CHEMICAL FAMILY: VOLUMETRIC SOLUTIONS AND CONCENTRATES FORMULA: NA2S203 AND NA2C03 IN H20 FORMULA WT.: N/E CAS NO.: N/E NIOSH/RTECS NO. : N/E PRODUCT USE: LABORATORY REAGENT 1.0N; TITRATOR SH CHEMTREC # (800) 424-9300 LA-MAR-KA, INC. 10272 SOUTH PERDUE STREET BATON ROUGE, LA. 70814 EFFECTIVE: 12-16-94 REVISION #03 ISSUED: 12-16-94 REVIEWED 1-1-95 PRECAUTIONARY LABELING T A-MAR-KA LABELING SYSTEM HEALTH 0 NONE FLAMMABILITY - 0 NONE REACTIVITY 1 SLIGHT CONTACT 1 SLIGHT LABORATORY PROTECTIVE EQUIPMENT GOGGLES; LAB COAT U.S.
Document imageDocument imageDocument imageDocument image
refid# 2N2KRQqN3pZqVL7NjY1GaKwNr6 pages
NGB 1498157-02 PLANET INSURANCE COMPANY Home Office: Sun Prairie, Wisconsin THE DOW CHEMICAL COMPANY Comprehensive Liability Policy NKA 1498156-02 Item 1.
Document imageDocument imageDocument imageDocument image
refid# npwVoD28574wNZOV3aRrOwGgz11 pages
REACTIVE CHEMICALS 1995 INCIDENT SUMMARY SUMMARY OF REACTIVE CHEMICALS INCIDENTS Total Incidents/Learning Experiences Major Incidents ($50,000/DAWC)* Ratio Total Incidents to Major Incidents* Total Injuries* DAWC* Fatality* 1991 102 2 51 2 1 0 1992 99 3 33 11 0 0 1993 88 5 18 1 0 0 1994 74 9 8 3 1 1 1995 85 7 12 4 2 0 Total Dollar Loss (Thousands, US) $214 $680 $1,522 $5,552 $2,471 *Data from joint ventures and contract manufacturing not included even though incidents were reported and communicated.
Document image
refid# 93MNZ6J6GqZDvLq0XLpQmZYED1 page