R. F. Nelson W. M. Singleterry J. B. Barbee T. King T. Dunn Sid Haynes Maintenance General Foremen Operations Area Superintendents
July 17 1987
INSULATION INSPECTION
+
sees
8
~~
On Haynes asbestos July 15 Sid
and I conducted an
insulation inspection in
Facilities 26 30 and 33. Deterioration of weather coating and insulation
through the on many lines and vessels has occurred
repair or removal is evident
the years and
need for
It is also evident that our personnel are not aware of the hazards involved
handling asbestos insulation During the inspection we found line
insulation 12 line containing asbestos on top of No. 3 settler that had
been stripped In Facility 42 insulation had also been stripped off a line
Again the insulation contained asbestos Scalers are shooting holes in
the that insulation to get to
cases
pipe
is to be scaled
This was evident in many
These types of practice have to be stopped All insulation will be inspected
before it is removed for any job Proper procedures have to be followed when
working around asbestos insulation
insulation for asbestos
When in doubt we can have our lab check
Facility 26 overall needs to be worked the most Asbestos
falling from
tanks and lines and is laying on catwalks through busy access areas that
pose a problem Area superintendents will be called upon to write work orders on many insulation jobs in an attempt to correct the situation at
can
~~
es
Insulation Inspection
HesteDreLa Garza
003731
20
be
ENVIRONMENTAL CONTROL PROCEDURE 002
INSULATION REMOVAL
July 1987
Revision l
(( 9JULY 87 Technological
9JULY
TechnologicalSuperintendent
M Satel Operations Superintendent
St M Safety Director
D. Laboratory Director
Mila
Assistant Plant Manager
hi
Plant Manager
lade
H. DeLa Garza
ECP 002 Asbestos
003852
26
-
ws
' ' o6ne wane
aww
.
e
ity, evar pt .
-
iment own Mz,
.
7 .
- Pod Saat
we
.
+ 5.
pint
gg
8
e
Pose
oom
:
-
eer Sof
o
^'
.
we *% ~
A
ow)
oe
a
.
.
~
. .
I. SCOPE
II WORK ORDER
.
III RESPONSIBILITY
. .
#
vod
. :
oy
.
.
-
.
e cman
ae
.
ateee Oe
> ~
1 ee
. -
. hd
eee
.
,
wetee
+
FT me .
te suse
Et te T
oF
7
ros
Term Tee
2s
.
me .
.
7
a
mew meee ne mee Oe 8
. :
+
6
ne
te cerns
oe
we
=
om
-
ON
. .
~~ ow
*
.
we .
st nem ee anaes
.
::
a .
.
.
ry . .
+*
. -
. .
. oo
. .
oe
ge
.
.
ene
" .
we
ew
;
e .
nny
. a
. .
*
. Aan e,
-_ a *
.
.
.
oe
a
Noste
gormter ag
.
~*
ae
.
.,
new,
oe.
ne et
-
wee
-
.
.
-
. oo.
.
we
pee eo
. Me .
i
.
.
.
.
. e
ry -
.
.
.e
.
7 _
. .
.
.
.
*.
o
.
La
. .
= eee
-
was
-
a
om
ie
+
ne ee nw :ene
. . .
.
-
-
.
. .
.
.
. ,
. .
: :
.
. mano
. .
e
'
.
2
we
* ne
oe
. .
.
.
* ,
.
,
. .
.
. .
.
.
*
*
. .
.
003853
.
ad
ENVIRONMENTAL CONTROL PROCEDURE 002
.
INSULATION REMOVAL .
.
Revision 1
I. SCOPE
II
Much of the insulation in the plant contains asbestos Friable asbestos is a hazardous material and requires special handling Disposal of any type
asbestos is allowed only to facilities licensed to accept it No
insulation of any type will be disposed of on plant property nor will it be handled by anyone other than the building trades crew trained and
outfitted for removal of containing insulation environmental
and
insulation
The following procedures must be followed when removing insulation if the
insulation is deemed to contain asbestos .
SAMPLESI VISUAL INSPECTION
WORK ORDER
TO DETEAN THE OF
CONTAINS CONTAINS ASBASSES IS NOT POSSIBLE
SN ucatiev
NEED TO BE ARVINGO : SENT TO AN SRESTOS SRESTOS LAS FOR SAMIFICATION SAMIFICATION
A. The owner of the equipment involved must initiate a work order for
insulation removal He will indicate on the work order an estimate of
the surface area involved This procedure must be followed on jobs
where insulation removal is incidental other work as well as where
insulation is the primary objective Work orders will also indicate
whether insulation is needed
B. The work order will be sent to the Environmental section of the
Technological Department Rector DeLa Garza Tony Dunn for proper
identification The Environmental Quality section will then send the
Maintenance work order to proper
number
personnel to be assigned work order
-
C. The Environmental Group with the help of Maintenance building trades
Cave supervisor Sid Haynes or foreman Howard
the following action
upon request will take
. Check the records to determine if the insulation involved contains
asbestos Primary source will be the survey provided by the RMC Industrial Hygiene Group from Richmond in 1984. If not covered in
this survey the material involved will be tested by the Sherwin
Lab and outside laboratories
2. If asbestos is involved the Environmental Group will make a - friability determination for record only They will verify the quantity involved and notify the appropriate environmental agency as required At this point the determination will be made whether to use the plant staging area to place the insulation directly into the transportet's containers
3. Notification for removal of insulation containing asbestos will have to be done ten 10 days in advance of removal This applies to quantities greater than that covering 160 square feet of insulation or 260 linear feet of pipe
Notification for small quantities will be done five 5 days in
advance of removal
003854
68
.
.INSULATION REMOVAL
.
5
mee
2
re - -
:
ECP 002
.
Revision I
.
4 When notification is completed the work order will be returned to
the normal system with a listing of any special requirements over and above normal asbestos handling procedures
III
5 copy of the work order and any associated correspondence will be
sent to the Safety Department at this time for review and comment if desired
~
D. Upon receipt of the work order from the
work Environmental can be assigned and
can begin
Group a number
-
RESPONSIBILITY
A. Plant Forces ,
insulation The General Foreman having control of the crew removing the
is responsible for the following
1. Providing protective clothing include mask disposable
coveralls head and foot coverings and gloves
2. Posting warning signs around the work area
- 3. Placing insulation in the proper bags and removing to the staging
area
4. Keeping daily count of bags removed to the staging area and
coordinating with the Environmental Group to insure that the
is
mtaimteerial
removed
in a
timely manner
90
days
maximum holding
.
B. Insulation Removal and Renovation Contractors
.
The contractor is responsible for the proper handling of the containing insulation by his crew This includes Items t through 4 in A above
C. Project Engineer Plant Insulation Projects The project engineer is responsible for overseeing the contractor and
assuring that the proper procedures are followed The project engineer
will conduct a contractor asbestos removal audit as the job
progresses