WEST WINDSOR MILL Sampling and Testing Procedures (Current) ,
(1) Asbestos
Windsor Tests
a) Six-month composite of crude ore (ground) sent to McCrone on a monthly basis
- Windsor retains a split
J & J Tests
a) Windsor sends a composite sample of every two filled silos* to J & J (Skillman, NJ) approximately every 2.5 weeks
b) Quarterly composite of above silo samples is prepared by J & J and tested by McCrone
(2) Heavy metals, moisture, solubility by acid, magnesite, color, fineness, bulk density
a) Grab sample taken by Windsor every 2 hours (testing for color, bulk density, insolubles)
b) Composite sample of each silo* tested for all items in (2) and (3)
- Each silo must be approved by Windsor QA
(3) Arsenic
a) Composite sample prepared of crude ore from incoming trucks
- From every 3-4 trucks
b) Composite sample prepared from every 5 pro duction days (from finished product)
c) Composite sample of each silo* tested
- Each silo must be approved by Windsor QA
Method of Test TEM XRD TEM
PLAINTIFFS EXHIBIT
CAM-317
* Silo composite - compiled from in-stream auto sample*.which takes several
samples per shift. Shift composites are compiled into a silo r.-.TiDosite which is completed and tested approximately every 5 production ays.
sdw3
-1-
CAMC-Sabatelli-000548
(4) Microbial
- Grab sample from each shift (3 per day) sent to J & J (Royston Lab)
by overnight mail
- Windsor QA approves silo based on results of J & J microbe tests (phoned in daily)
- Grab sample of finished product from each railcar sent to J & J
- NOTE: Windsor is installing an auto sampler to take samples from each tanker truck used to fill each railcar (3 trucks per railcar)
- J & J samples each railcar on arrival
Various Various
Product Certification
Windsor includes with each shipment a Certificate of Analysis which references the silo number.
- Arsenic - Heavy Metals - Magnesite - Water Soluble Iron - Fineness - Color - Solubility by Acid - Moisture - Bulk Density
sdw3
-2-
CAMC-Sabatelli-000549
Cyprus Planned Testing Program (Cosmetic Products) - Using XRD (Asbestos)
Step 1 Composite sample of drill holes at mine - No ore shipped to plant until tests prove no quantifiable levels of asbestos are present
Step 2 Composite sample of crude ore going into crude ore stockpile Step 3 Composite sample of each flotation batch (about 100 tons) Step 4 Composite sample of finished product going into each railcar or
truck.
sdw3
-3 -
CAMC-Sabatelli-000550