Document zzmDkJRo4JEVbmdYOxdKoDN77

WORK ROPOSAL W3K PLANT TECHNICAL SERVICES lUITUm tv J. R. Kellogg !WlIIU it 'oaVi 5-27-59 dSTT" R. C. CanfleL fillFT. wrourr 'ranr^=2=2* ,, ,-246 fife J Aroclors 729; 2410 AROCLORS: IMPROVE CHLORINATOR OFF-GAS SYSTEM lOAIklNAL TO T.k.O. J0 kOOK CC'AkkT. ink. kURT, MkMN R. S. Wobus R. E. Soden T. W. Dalton J. F. Neff J. R. Kellogg J. F. Stickler (2) kWCMtNT or TkOlLlM ado OkJtcTivi (Via rtvtrtt tldt It mdiii,/) Process changes, made in the chlorination step to produce a more stable Aroclor, have resulted in higher off-gas temperature with more entrained product in the off-gas stream. This causes a more rapid degradation of the light Aroclor scrubbing liquid and increases the amount of low stability product formed. Successful demonstration of an improved off-gas system on #5 chlorinator (OVER) IITIUlft'b UviM 6k kfextnfk------------------------------------------------------------------------------------------------------------------------------------------ Actual savings cannot be estimated at this time; however, the following benefits will be realized: 1. Improved product quality by eliminating scrubbing liquors. 2. Lower maintenance costs will be achieved by replacing equipment which is in a poor state of repair. 3. As a direct result of (2), fewer process interruptions and less down time will be experienced. lUiilim iMMKh. ------------------------------------------------------------------------------------------------------------ Eliminate present off-gas scrubbing system by installing gas coolers and entrainment separators on four chlorlnators. The equipment will be similar to that now in use at Anniston and now Installed on one chlori nator at W.G.K. mrercsir (VALUATION 40 eti. (. no. M DC*. (.1. Mi ... Ha- INOTH. DRAFTING TANT-UF 160 ieliminarv evaluation(7b bt comt>l*tad bv Technical Sarvlca Plot) NO. MIN T.t;D. COOT ESTIMATED SAVINSS ON PROFITS NIV FIXEO CAPITAL $ 1450 To be determined $11.700 Estimated new capital requirements a. entrainment separators (4 req'd.) $1200 b. gas coolers (4 req'd.) 2500 c. process, water and vent piping 8000 . TOTAL 2 Repairs to grating, steel supports, etc; $11,700 1,100 3. Dismantling expense 1,000 TOTAL PROJECT $13,800 MNCRAL SUFT T. W. Dalton PLanT UANAIfll--A-P-P--R-O--V-ALS R. E. Soden TICMMlEALFlIflBUCTlflH MU.-------------------R. S. Wobus HARTOLDMON0004800 STATEMENT OP PROBLEM AND OBJECTIVE (cont'd.) (W.G.K. TSD Jot #729:2136) has shown that similar Installations on the other four (4) ohlorinators Is desirable. The work,Involved will be to improve and simplify the off-gas systems from ohlorinators 1 through 4. 0137380 HARTOLDMON0004801