WORK
ROPOSAL
W3K PLANT TECHNICAL SERVICES
lUITUm tv
J. R. Kellogg !WlIIU it
'oaVi
5-27-59 dSTT"
R. C. CanfleL fillFT. wrourr
'ranr^=2=2*
,, ,-246
fife J
Aroclors
729; 2410
AROCLORS: IMPROVE CHLORINATOR OFF-GAS SYSTEM
lOAIklNAL TO T.k.O. J0 kOOK CC'AkkT. ink. kURT, MkMN
R. S. Wobus R. E. Soden T. W. Dalton J. F. Neff J. R. Kellogg
J. F. Stickler (2)
kWCMtNT or TkOlLlM ado OkJtcTivi (Via rtvtrtt tldt It mdiii,/)
Process changes, made in the chlorination step to produce a more stable Aroclor, have resulted in higher off-gas temperature with more entrained product in the off-gas stream. This causes a more rapid degradation of the light Aroclor scrubbing liquid and increases the amount of low stability product formed.
Successful demonstration of an improved off-gas system on #5 chlorinator (OVER)
IITIUlft'b UviM 6k
kfextnfk------------------------------------------------------------------------------------------------------------------------------------------
Actual savings cannot be estimated at this time; however, the following benefits will be realized:
1. Improved product quality by eliminating scrubbing liquors. 2. Lower maintenance costs will be achieved by replacing equipment which
is in a poor state of repair. 3. As a direct result of (2), fewer process interruptions and less down
time will be experienced.
lUiilim iMMKh.
------------------------------------------------------------------------------------------------------------
Eliminate present off-gas scrubbing system by installing gas coolers and entrainment separators on four chlorlnators. The equipment will be similar to that now in use at Anniston and now Installed on one chlori nator at W.G.K.
mrercsir
(VALUATION
40
eti. (. no.
M DC*.
(.1. Mi
... Ha-
INOTH.
DRAFTING TANT-UF
160
ieliminarv evaluation(7b bt comt>l*tad bv Technical Sarvlca Plot)
NO. MIN
T.t;D. COOT
ESTIMATED SAVINSS ON PROFITS
NIV FIXEO CAPITAL
$ 1450
To be determined
$11.700
Estimated new capital requirements
a. entrainment separators (4 req'd.)
$1200
b. gas coolers (4 req'd.)
2500
c. process, water and vent piping
8000
. TOTAL
2 Repairs to grating, steel supports, etc;
$11,700 1,100
3. Dismantling expense
1,000
TOTAL PROJECT $13,800
MNCRAL SUFT T. W. Dalton
PLanT UANAIfll--A-P-P--R-O--V-ALS R. E. Soden
TICMMlEALFlIflBUCTlflH MU.-------------------R. S. Wobus
HARTOLDMON0004800
STATEMENT OP PROBLEM AND OBJECTIVE (cont'd.) (W.G.K. TSD Jot #729:2136) has shown that similar Installations on the other four (4) ohlorinators Is desirable. The work,Involved will be to improve and simplify the off-gas systems from ohlorinators 1 through 4.
0137380
HARTOLDMON0004801