PPG INDUSTRIES, INC..JAKE CHARLES, LA. PERMIT NO. NPDES - LA-00007(NON-COMPLIANCE REPORT) Reporting Period: 12/16-22/84 December 28, 1984 Effluent Stream No. 001 Effluent Characteristic pH Lbs./Day Discharge Limitation 6-9 Lbs./Day Effluent Deviation -2.9 Date of Deviation 12/17 Time of Deviation 10:52 a.m. Reason or Explanation 1 (9 min.) The violation was due to a faulty alarm circuit within the pH control system. As a result, no alarm sounded warning the pH control system operator of an upset conditio? The alarm circuit has been repaired. Additional maintenance check procedures have been i implemented into the instrument maintenance program in an effort to prevent such occurrences ij . r .... in--4 i r r (/ A -vn S ~S ^* J W I'. .. certify ....... ............ . under .. ........ penalty m. of law that I have ^ ^ .... ...... , personally examined and am familiar with the information submitted in this document and all attachments and that, based on my inquiry of those individuals immediately responsible for obtaining the Information, I believe that Information Is true, accurate, and complet^, and I am aware that there are significant a. penalties for submitting false information^ includinq the possibility of fine and imprisonment. Report 109 Period: PPG INDUSTRIES, INTAKE CHARLES, LA. PERMIT NO. NPDES - U-00007"NON-COMfLIANCE REPORT) 12/9-15/84. December 21 ( 1984 I'' fluent ream fo. 001 . 018/118 Lbi./Cay li'flucnl Discharge Chcrocterlilic Unii tallon dH *6-9 ,,. * . TSS `* . 8700 1 Lbs,/Day Effluent Deviallon + 1.6 * - 2.2 + 0.9 * + 2517 Date of Time of Deviation Deviation f[tleaion or Explanation * *j "tO| 12-9-84 *1 12-10-84 * 12-12-84 * 11:30 D.m * * 4:20 a.m 7:26 a.m * fl hr; 2 min.) Failure of a level control valve compounded by a faulty tank overflow alarm resulted in the overflow of alkaline material exceeding capacity of the pH control system. The level control valve and overt alarm were both repaired on 12/10/84. 1 (7 min.) The pH'-control system became* overloaded when several operatibnal events occurred simultaneously. In addition, adequate neutralization was hindered by weak caustic reagent. - (1 hr. 11 min.) The SOP involving the sampling/analysis of cooling wash water before draining to the Drocess sewer was not'followed; the coolino wash water was hiaher in alkalinity than expected causinq neutralization capacity to be exceeded. The SOP was reaffirmed. * ; , 12-11-84 * The Silica's solids treatment svstem was unahlp'to adequately remove suspended solids due toan inadvertent overloading of the system with settling aids. The SOP was revised to include runninq a settlinq aid demand .! test before making any adjustment in settl.ina aid flow rates. ,n --fer.. SW'* Cj 1'--K ' ---------- I certify under penalty of law that I have personally examined and am familiar with the information submitted PPG INDUSTRIES, INC.^KE CHARLES, U. PERMIT NO. NPDES - IA-000076^ION-CQMPUANCE REPORT)