Document zzeOpL0B650drqdQazxLymjG6
PPG INDUSTRIES, INC..JAKE CHARLES, LA. PERMIT NO. NPDES - LA-00007(NON-COMPLIANCE REPORT)
Reporting Period: 12/16-22/84
December 28, 1984
Effluent Stream No.
001
Effluent Characteristic
pH
Lbs./Day Discharge Limitation
6-9
Lbs./Day Effluent Deviation
-2.9
Date of Deviation
12/17
Time of Deviation
10:52 a.m.
Reason or Explanation
1
(9 min.) The violation was due to a faulty
alarm circuit within the pH control system. As
a result, no alarm sounded warning the pH
control system operator of an upset conditio?
The alarm circuit has been repaired. Additional
maintenance check procedures have been i
implemented into the instrument maintenance
program in an effort to prevent such occurrences
ij
. r .... in--4 i
r
r (/
A -vn
S
~S
^*
J W
I'.
..
certify
....... ............
.
under
.. ........
penalty
m.
of
law
that
I have ^
^ .... ......
,
personally examined and am familiar with the
information submitted in this document and all
attachments and that, based on my inquiry of
those individuals immediately responsible for
obtaining the Information, I believe that
Information Is true, accurate, and complet^,
and I am aware that there are significant a. penalties for submitting false information^
includinq the possibility of fine and
imprisonment.
Report 109 Period:
PPG INDUSTRIES, INTAKE CHARLES, LA. PERMIT NO. NPDES - U-00007"NON-COMfLIANCE REPORT)
12/9-15/84. December 21 ( 1984
I''
fluent ream fo.
001
.
018/118
Lbi./Cay
li'flucnl
Discharge
Chcrocterlilic Unii tallon
dH *6-9
,,.
*
. TSS
`*
.
8700
1
Lbs,/Day Effluent Deviallon + 1.6
* - 2.2
+ 0.9 *
+ 2517
Date of Time of Deviation Deviation
f[tleaion or Explanation
*
*j
"tO|
12-9-84
*1 12-10-84
*
12-12-84
*
11:30 D.m
* *
4:20 a.m
7:26 a.m
*
fl hr; 2 min.) Failure of a level control valve compounded by a faulty tank overflow alarm resulted in the
overflow of alkaline material exceeding capacity of the pH control system. The level control valve and overt
alarm were both repaired on 12/10/84.
1
(7 min.) The pH'-control system became* overloaded when several operatibnal events occurred simultaneously. In addition, adequate neutralization was hindered by weak caustic reagent.
-
(1 hr. 11 min.) The SOP involving the sampling/analysis
of cooling wash water before draining to the Drocess
sewer was not'followed; the coolino wash water was hiaher
in alkalinity than expected causinq neutralization
capacity to be exceeded. The SOP was reaffirmed. * ;
,
12-11-84
*
The Silica's solids treatment svstem was unahlp'to
adequately remove suspended solids due toan inadvertent
overloading of the system with settling aids. The SOP
was revised to include runninq a settlinq aid demand .!
test before making any adjustment in settl.ina aid flow
rates.
,n
--fer.. SW'*
Cj 1'--K '
----------
I certify under penalty of law that I have personally examined and am familiar with the information submitted
PPG INDUSTRIES, INC.^KE CHARLES, U. PERMIT NO. NPDES - IA-000076^ION-CQMPUANCE REPORT)