Document zzZ9amVN9VMbrMaVQMxg6kXn3
EPAClean Water Act Section 404: Site Visit / Case Development
United States
Environmental Protection
AgencyFor inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344)
This report includes only factual information gained by documentation, onsite observations, and / or onsite interviews.
Stephanie Tougas
Inspector Name(s)
Time In 9:00 AMStart Date September 24, 2021
Time Out 10:30 AMEnd Date September 24, 2021
Inspector's Organization USEPA
Organization Requesting Inspection (if different)
Inspection Type FocusedInspection Status Original
Site NameLawson Dairy Farm
Site Address *1179 Covered Bridge Road
City * IrasburgCounty * OrleansState * VT Zip Code * 05845
Mailing Address * 1179 Covered Bridge Road
City * IrasburgCounty OrleansState * VT Zip Code * 05845
Latitude * 44 49'25.18 " NLongitude * 72 16'16.63 " W
Estimated Size of Site (acres) 18Is there a home on the site?YesNo
InspectorDigitally signed by Tougas, Stephanie
Date
Signature Tougas, Stephanie Date: 2021.10.07 17: 08: 48-04'00 '
SSiugpneartvuirseorDaDtEeN:N 2Y0 2D1A.R1T0.D0i8g i0t6a:l40l:y3 2s i-g0n4e'd0 0b y'
DENNY DARTDate
Effective August 2020Page 1 of 3
ED_019088A_00020654-00001
EPAClean Water Act Section 404: Site Visit / Case Development
United States
Environmental Protection
AgencyFor inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344)
Site NameLawson Dairy Farm
Start Date September 24, 2021
End Date September 24, 2021
Inspection Purpose Post AO / AOC
Presentation of Inspector Credentials
Opening Conference
Name and Title (Use N / A if owner / operator not available to join the inspection)
N / A
Opening Conference
Name of person authorizing access if applicable
Douglas Lawson
Notes from Opening Conference
Called Mr. Lawson prior to site visit requesting access to observe the progress of the plantings as well as the check dams
Access Issues if Any
Describe
Inspection Observations and Sample Collection
Site Owner / Site Operator / Responsible Party (Name, title and contact information)
Douglas Lawson, owner, 802-754-6820
Additional Persons Present at Inspection
Dave Blodgett (NRCS)
General Site Characteristics (layout of property, etc.)
pasture, previously forested wetland, surrounded by forest adjacent to the Black River
Purpose and Need for Discharge of Dredged and / or Fill Material
to create pasture
Site Overview (Past inspections, site description, permits, etc.)
Scope of Inspection (Areas inspected or not inspected)
we inspected the restoration work that has begun as required by the AOC
Effective August 2020Page 2 of 3
ED_019088A_00020654-00002
EPAClean Water Act Section 404: Site Visit / Case Development
United States
Environmental Protection
AgencyFor inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344)
Site NameLawson Dairy Farm
Start Date September 24, 2021
End Date September 24, 2021
Environmental Conditions (e.g., wind, rain, smoke, dust, temperature, snow)
65 degrees, raining
Field Work Conducted
Walked the length of the tributary, observing the condition of the plantings. I documented the locations of the check dams that Mr
Lawson had installed. I also noted the Balsam fir plantings on the southern side of the tributary and the fence installation.
Closing Conference
Documents Received and / or Requested During the Inspection
N / A
Compliance Assistance Provided (If any)
N / A
Observations Relayed to Site Owner / Operator
N / A
Actions Taken by Owner / Operator During the Inspection (If any)
N / A
Potential Issues of Concern Including Regulatory Citations
The southern side of the tributary has been planted with Balsam fir, but not the northern side. Also, it appears that the southern side
has only been planted with Balsam fir and no other plantings or wetland seed mix. In the spring, please finish planting the northern
side of the tributary with some Balsam fir plantings, and finish seeding and planting the southern side. As discussed, live stakes
from nearby trees (such as Willow and dogwood species) should be planted in early spring, before bud - break, as needed, to
supplement the woody species density (as required by the performance standards).
Attachments *
Maps and Sketches
Photographs (including location) and Photo Log
Other (SSIP, Wetlands Delineation Forms, etc.)
Additional Notes
Thank you for your continued work on this restoration. If the remaining plantings can be completed in spring 2022, then the
monitoring period can begin.
Effective August 2020Page 3 of 3
ED_019088A_00020654-00003