Document zzYb03M5JVqmYGkMYJyVJONGm

X' >7 . . , . Rob.ert Taylot - Raybastos Manhattan ' . , E, L, Dickerson - G.E., Salem, Va,. R, L, Turner - G.E.,- Salem, Va.- V Tests were performed on the Crane Tower using SOWS lining material as follows: (1) Full lining - load could not be stopped at temperatures above 150.F in a satisfactory time. (2) Split linings with about 1/3 cut out of middle - still not satisfactory. Mr. Taylor' said lining was.not the correct material for our application. He said the lining pressure of 35 psi approximately was too low for 502E material. He suggested cutting the lining away to leave approximately 4,5. square, inches on each shoe. (3) Repfhted test with about 4.5 sq, inches per shoe. This gives lining pres. ".ante of about 300 psi. The-stopping tests were excellent. Ihr^-Ta^ior said lining glazed at low pressures and did not provide friction value that w?ap needed for our application. He recommended two materials: M357B (for Fai loading) and US98 (for. up-to. 50 psi loading). , i. ' * ** prpjidiBed-aampleo^ of each material for use on tbe-cr tower lir nue week; ^.-37^76^: 7 . " taatad sanples of M357H material. on-stopping times. It was tested and found to-be " IfoBs^rityby phone that we needed rush delivery of 30 pieces of 167AS474, "4'shd;:l20/piepes of 167A8474, Part'6 for Israel Job. McBrearlty promised week of May 10-14. Joe Hash furnished order to.Ray Turner for this . rf - ' . ..... ' 5 vtpS^^j5atipl'e linings to be delivered-by 3/31. These will he tested In the Lab. - Wear test results',"we.will change drawings to specify one off' these , ^ tv ^ J A y N men: ' E. L. Dickerson PLAINTIFF'S EXHIBIT PLAINTIFF'S EXHIBIT P ~^b'^Oc[.QO IGEWVOCT04-011638 WV-21607