Document zzMvnx4y290r6OM6KjYnKKmgR
TO
COI n. n. uayior D. J. Dickson P. D. Franson P. R. Kavasmaneck J. G. Keeler W. G. Lilly, Jr. B.G. Perry J. E. Sanders S. W. Turlcchl
FROM:
L C.. C. Neely
SUBJECT: Minutes of Task Group Meeting of March 17, 1987 Phaseout Use of Asbestos-Containing Materials In Work Place Chemicals and Plastics Group.
Following Is an Executive Summary of the action/agreements resulting from the subject meeting. The detailed minutes prepared by the responsible Task Group member-are attached for those who desire additional Information.
Executive Summary
Vhe "heart" of the C&P Group asbestos-usage phaseout program is the requirement that no asbestos-containing products be purchased after January 1, 1989. Consistent with this date, the Task Group agreed last fall when preparing the proposed program that the affected valve, piping, and process vessel Standard Practice documents must be revised to show substitute materials by July 1, 1988, and manpower estimates were made accordingly. However, because of the rapid (and very likely, continuing) reduction of suppliers of asbestos-containing materials due to liability Insurance coverage problems, In combination with the desire of key plant personnel to cease using these materials at an early date, the Task Group
UCC 015765
Meeting Minutes
2- -
April 6, 1987
recommends that the responsible CEO skill areas complete the required revisions to the affected Standard Practice documents by September 30, 1987.
Action
H. N. Baylor R. R. Allen
This accelerated schedule will require additional technical assistance In the Piping Technology skill area. Prelimlnar
eM's
discussions with R. R. Allen and R. W. Engle regarding the
Wx-
possibility of an accelerated schedule were held on March ^facJLut)
23, 1987. Arrangements to obtain the needed technical
.
assistance should now be made.
Action J. E. Sanders
The total CED cost of the accelerated program In 1987 over and above planned and budgeted T&S programs is estimated to be $34,000, much less than our earlier $93,000 estimate which was developed last September on the basis that much more work would be required. Funding for this activity Is needed.
Action
P. D. Franson D. J. Dickson
The Task Group requests the assistance of the Machinery Technology Group in Identifying *hat actions, if any, are needed to assure that the broadly advertised aramid fiber nonasbestos asbestos gasket substitutes are not used In machinery Items (e.g., pumps, compressors) for our process units. One of the major reasons these materials are
generally considered unsuitable for gaskets Is because they will not pass fire tests. The perception Is that machinery manufacturers are using these materials without our know ledge and consent. Any costs associated with this request will be In addition to the $34,000 mentioned above.
Action J. E. Sanders
A
The Task Group requests advice as to where the now-approved asbestos-usage phaseout program documents will reside. It needs a permanent "home" within the TMS manuals system. S. W. Clark suggested It be Included In Section 8 of the Safety Health jnanual - this Is the Operation and Maintenance Section.
The meeting agenda was based on the duties listed In our recom mended program that are delegated to the Central Engineering Department. These duties are listed below along wl a brief summary of the action/ agreements reached:
Agenda Number
Responslbl11 tv
Duty and Actlon/Aqreement
4.1
S. H. Clark/C&P Industrial
Ident1f1 cat1on_of Asbestos
Hygiene Department
Conta 1 n 1 ngjnaterU
C&P
(Terry Hanning)
Industrial Hygiene Department
estimates completion of Criteria
Document 4Q87. No cost to CED.
UCC 015766
Meeting Minutes
-3-
April 6, 1987
Agenda Number
Responsibility
Duty and Actlon/Aqreement
4.2 G. B. Elder
Regl acement of_Asbestos-Conta1 n 1 ng Insulat1on_as Regu1_red_to Maintain StructuralIand_Functionai Integ rity. Responsibility of each location; CED-prepared criteria not required.
4.3
S. W. Clark/C&P Industrial
Removai,_Modification,_and/or
Hygiene Department
Disposal_of Asbestos-Containing
(Terry Hanning)
.
Materials.- Procedures~already In
place at all locations; no further
action required.
4.4.1
G. B. Elder (Materials)
Use of_Asbestos-Substitute Gas kets./Packing. Extended use of GRAFOIL", spiral-wound with GRAFOIL" or TEFLON" fillers or reinforced TEFLON" will cover our needs for now. Internal program of testing other non asbestos substitute gasket materials not needed; will rely on test data developed by Materials Technology Institute (we are member) at no additional cost to CED. A concern was raised regard ing the control of the use of the aramid-relnforced "nonasbestos" asbestos-substitute materials for gaskets in machinery Items (e.g., pumps, compressors, etc.). These materials will not only not pass fire tests but will also perform poorly_as gaskets because of their propensity to cold flow. The perception Is that the vendors are making these substitutes without our knowledge and consent.
4.4.2
R. W. Engle (V&P Specs) 530 W
b daMuk
' j/^ 3 JUnL
Two-to-three man-months of work Is required to revise and Issue valve manual and V&P Specifications. Can accomplish this with In-house staff by original July, 1988, target date; however, will prob ably need technical assistance to meet required September 30, 1987, completion date. Approximate additional cost to CED $20,000.
UCC 015767
Meeting Minutes
4 - April 6. 1987
Agenda Number
Responsibility
Duty and Actlon/Aqreement
4.4.3
C. C. Neely <COP Specs)
Modest additional manpower requlred to revise specs; however, printing/distribution cost of unplanned revision of COP Specs in 1987 not Included in T&S budget. Estimated additional cost to CED:
$8,000.
5 C. C. Neely
Conduct 1 ng_on-s^1 te_seminars at ma^or filants_not_requlred; Key plant personnel do not need to be "sold" on need to quit using asbestos-containing materials in favor of more costly substitutes. They are fed up to here with even more costly monitoring, record keeping, .disposal requirements for asbestos-containing materials, etc.; and hence, are desirous of having Standard Practice documents available to allow them to cease using these materials prior to the mandated January 1, 1989, cutoff date.
6
G. B. Elder <H. G. Clem)
Iden11f1 cat1on_of Asbestos-Free
In?ul.at1onT Will prepare Location
Practices for Inclusion in Insula
tion Manual as appropriate by end
of third quarter. Estimated cost
to CED: $6,000.
6.1 C. C. Neely
Nex^Meeting^ Unless the need for an earlier meeting is identified, the next meeting of the Task Group will -fee -held -on August A4 1987, at the South Charleston Technical Center In Room 3505. All members are requested to mark their calendars accordingly.
'The detailed minutes are attached for those Interested In more complete information.
Respectfully submitted.
CCN:at Attachments 43141
C. C. Neely for the Task Group UCC 015768
/ION CARBIDE CORPORATION ENGINEERING, MANUFACTURING AND TECHNOLOGY SERVICES DEPARTMENT
HEALTH, SAFETY AND ENVIRONMENTAL TECHNOLOGY South Charleston, West Virginia
BUSINESS CONFIDENTIAL MEMORANDUM March 23, 1987
TO: C. C. Neely
COPY: FROM:
L. E. Calvert S. W. Clark G. B. Elder R. W. Engle P. R. Kavasmaneck S. S. Murphree J. E. Neff
T. E. Hanning
.
>-
RECEIVED
MAR 2 4198?
CCN
4#^>
SUBJECT:
Asbestos Implementation Task Group March 17 Meeting Minutes
Clyde,
The following information is being forwarded for issue as part of the subject minutes and represents those items tagged for responsibility by the Industrial Hygiene contact on the Asbestos Implementation Task Group.
Also please find attached SH-256, Removal and Handling Asbestos-Containing Materials, which is a Standard Practice of the C&P Safety/Health Technology Manual. Section 2.6 of this standard deals with the EPA regulations for removal and handling of asbestos materials and has not been updated with respect to recent EPA asbestos proposals. The sections dealing with OSHA regulations have been updated. SH-256 has been volatile and will be revised when needed as part of my responsibility as a member of the Safety/Health Standards Team.
Identification .of .Asbestos Tltoirtaining Materials
A goal of the asbestos task group is to establish a program so that asbestos will not be purchased after January 1, 1989. A C&P criteria ( guideline document ) for the identification of asbestos-containing materials is needed as part of the overall program. A consensus of C&P Industrial Hygiene Departments will be sought as a basis for the criteria. The criteria will provide recommended techniques and when to use them, pricing) timing and accuracy of results, and other'Subjective information. Polarized light or scanning electron microscopy are two identification techniques that can provide fast and accurate confirmation for the presence of asbestos.
This assignment will have the following estimated schedule and cost.
Schedule: 4Q 1987. Cost: None, cost will be part of normal Safety/Health Standards Team Work.
UCC 015769
KPSC**0"**
2- -
Removal. Modification, and/or Disposal of Asbestos-Containing Materials The need for a protocol to sample asbestos at the new 0.2 fibers per cubic centimeter of air exposure level was discussed. The protocol would be used to establish asbestos exposure data from the storage ( binders may deteriorate and release asbestos ), cutting and changing out of asbestos gaskets and packing. After discussion with Industrial Hygiene representatives, the need to develop a generic test protocol for asbestos exposure is not warranted since the OSHA Asbestos Standard clearly defines the sample taking method that must be used. The Plant Industrial Hygienist is familiar with this method and can quickly outline a technician's job duties in taking air samples during storage, cutting and changing out of asbestos gaskets and packing. Additionally, the Plant Industrial Hygienist will be able to supply other recent asbestos exposure data from the plant monitoring strategy program, if available and applicable. This action will have the following estimated schedule and cost. Schedule: Sample taking can proceed immediately with the
support of the location Industrial Hygiene area. Cost: None, resources are outside this task group.
Sincerely,
jLj
Terry R. Hanning 2000/3628 Unicom 8-721-5903
UCC 015770
o
I
I
I.
I
STANDARD PRACTICE
MUTER DIVISION
REMOVAL AMO HANDLING ASBESTOS-CONTAINING INSULATION MATERIAL
SH-2S6
PAGE 1 OF 7 DECEMBER 1986
1 GENERAL
,
1.1 TMs Practice provides e procedure for the sefe removal and handling of asbestos-containing Insuletlon Material and coopllance with USHA regulation 29 CFR 1910.1001 and 1926.S8 and EPA regulation 40 CFR 61 Subpart N. The purpose of the Practice Is to ensure the safety and health of employees directly Involved with performing the work and of others, either In the Immediate area or downwind, who may be exposed to residual dust/fibers. Insulationatatertal containing asbestos Is no longer Installed by IK.C; therefore, the concern of this Practice Is to control renovation and demolition operations Involving the removal of old. asbestos-containing Insulation; In these activities OSHA Standard 29 CFR 1926.SB Is applicable. For additional details, review the OSHA Standards.
All Insulation materials approved through the use of UCC Insulation Standards have been specified asbestos-free since 1970.
2 STANDARDS
*
2.1 Permissible Exposure Limits
2.1.1
Employee 8-hour time-weighted average exposure to airborne concentrations of asbestos fibers shall not exceed
0.2 fibers, longer than 6 micrometers, per cubic centimeter of air.
_
2.1.2
An action level of 0.1 fibers, longer than 6 micrometers, per cubic centimeter of air has been set which
triggers the monitoring, medical, and employee Information and training requirements.
2.2 Wort Practices
2.2.1
Insofar as practicable, demolition, removal or handling of asbestos-containing Insulation shall be performed
while the material Is In a sufficiently wet state to prevent emission of airborne fibers exceeding exposure limits prescribed In
2.1.1 and 2.1.2. See Section 2.7.8 for the specific EPA regulations that control work practices. Wherever feasible, the
'
employer shall establish negative-pressure enclosures before coaaenclng removal, demolition, and rennovatlon operations.
2.2.2
Caution signs shall be posted at all approaches to areas which may contain excessive concentrations of airborne
asbestos fibers so that an employee may read the signs and take necessary protective steps before entering the area. The signs
shall state:
DANGER-ASBESTOS; CANCER AND LONG DISEASE HAZARD - AUTHORIZED PERSONNEL ONLY; RESPIRATORS ANU PROTECTIVE CLOTHING ARE REQUIRED IN THIS AREA
In addition to these signs, legible signs warning of the health hazards of asbestos shall be provided and displayed at each location where airborne concentrations of asbestos fibers may exceed the exposure limits listed In Section 2.1.1. See Section 2.0.4.4 for additional requirements for posting signs. Whenever feasible, a negative pressure enclosure must be established before coauencing removal, demolition or rennovatlon operation. Air exhausted from the enclosure must pass through a HEP filter (See 29 CFR 1926.S8).
2.2.2.1
An appropriate barricade, using caution or barrier tape for exaaple, shall be erected around the
perimeter of outdoor areas as a supplementary, protective measure to discourage unauthorized entry.
L. .
i 22.6.1.2 C
A UCC 015771
TANOARD PRACTICE
SH-260 PACE2 OF 7 DECEMBER 1*86
INTER DIVISION
2.2.3
Insofar as practicable, moved Insulation shall bo netted and placed directly Into labeled plastic bags (or
other suitable containers) for disposal at an approved landfill. Otherwise, place plastic sheeting beneath the Job site, alst spray the reaoved Insulation with water.(Wnded water^) or netting agent and then place In plastic lags. Mien net Methods of
reMoval/cleanup are Inpractlcal, e.g., when teaperatures are belon freezing, vacwaring or sweeping any serve as an effective alternate cleanup Method. Sweeping conpouna shall be applied to the wort area to prevent dust generation when sweeping. See Sections 2.7.3.7 and 2.7.4 for specific wort practice requfrenents. -
2.2.4
label Specifications - Container caution labels shall be printed la letters'Of sufficient size and contrast as
to be readily visible and legible. Miere feasible. Installed asbestos-containing products shall also contain a visible label.
The label shall state:
HANGER - CONTAINS ASBESTOS FIBERS; AVOID CREATING DUST;
CANCER AND LUNG DISEASE HAZARO
Where feasible. Installed asbestos containing prodiets should be labeled In accordance with 2.2.4.
2.2.S
Regulated Areas - Eaployers oust Identify as regulated areas any locations In their workplaces where there nay
be occupational exposures to airborne concentrations of asbestos above the PEL. Only authorized persons, with proper
respiratory protection, any enter regulated areas which Must be clearly posted. Eating, drinking, and saoklng are prohibited In regulated areas.
2.2.0
Housekeeping - All external surfaces In any place of enploynent shall be Maintained free of accuaulatlon of
asbestos fibers. Special attention should be given to cleaning scaffolds used In denolltlon work. Clean-up of asbestos dust Is
prohibited with coppressed air, diy-sweeplng or any diy clean-up process.
2.2.7
Baste Disposal - Asbestos waste, scrap, debris, bags, containers, equIpMent, and asbestos-contawlnated
disposable clothing, that Is consigned for disposal and which nay produce airborne concentrations of asbestos fibers In excess
of perwlsslble exposure Units, shall be collected and disposed of In sealed leak-tight containers to an approved landfill. See
Section 2.6.4 for specific disposal requlresents.
-
'
2.i Personal Protective Equipment
2.3.1
Respiratory Protection - Eaplgyees engaged In the spraying [wetting-downj of asbestos, the renoval; In the
denolltlon of pipes, structures, or equipment covered or Insulated with asbestos; and In the renoval or denolltlon of asbestos
Insulation or coverings shall be provided with respiratory equlpaent based on the air concentration In Table 1 and selected from
anong those approved by the Mine Safety and Health Adnlnlstratlon, Oepartaent of the Interior, or the National Institute of
Occupational Safety and Health, Oepartawnt'of health and Hunan^Senrlces describee in 30 CFR Part II. Compliance with exposure
llailts prescribed In 2.1, Perwlsslble Exposure Units, shall not be achieved by the use of respirators, except:^
1. Ourlng the Interval necessary to Install or leplenent feasible engineering and work practice controls,
2. In work operations such as Maintenance and repair activities or other activities which the ewployer establishes that engineering and work practice control procedures are not feasible,
3. In work situations where feasible engineering and work practice controls are not yet sufficient to reduce exposure to or below the PEL,
4. In eawrgencles.
Where respirators are pemltteo the ewployer shall provide a powered, air purifying respirator In lieu of any negative pressure respirator specified In Table 1 whenever:
22.S.1.2
a. An enployee chooses to use this type of respirator; and b. This respirator trill provide adequate protection to the eMpIqyee.
UCC 015772
TANOARO PRACTICE
'O
INTER DIVISION
SN-256
PAGE 3 OF 7 OECENBER 1966 -..I.
TABLE 1
RESPIRATORY PROTECTION FOB ASBESTOS. TREM0L1TE. AMTHOPHYLLITE. AND ACTINOLITE FIBERS
Airborne Concentration of Subject Materials or Conblnation of These Materials
Required Respirator
1. Not In excess of 2 f/cc (10 x PEL)
1. Half-ask air-purifying respirator equipped with Mgh-efflclency filters.
Z. Hot In excess of 10 f/cc (SO X PEL)
1. Full facepiece air purifying respirator Mgh-efflclency filters.
X Hot In excess of 20 f/cc
(loo x pa)
1. Any powered air-purifying respirator equipped with high efficiency filters.
2. Any supplled-alr respirator operated In continuous flow node.
4. Not In excess of 200 f/cc (1000 x PEL)
1. Full facepiece supplied air respirator operated In pressure deaand node.
6. Greater than 200 f/cc
(greater than 1,000 x PEL) or
unknown concentration)
'
1. Full facepiece supplied air respirator operated In pressure denand node equipped with an auxiliary positive pressure self-contained breathing apparatus.
2.3.2
Special Clothing - The enployer shall provide and require use of special clothing, such as coveralls or slnllar
whole body clothing, head coverings, gloves, and foot coverings for any employee exposed. Contaminated clothing nust be stored
In closed containers sucn as sealed lockers. It should be changed dally.
2.3.3
Hygiene Facilities and Practices - At any fixed place of employment exposed to concentrations of asbestos
fibers In excess of permissible exposure Units, the enployer shall provide change roons for employees working regularly at the
place. Two separate lockers or containers shall be provided each enployee, so separated or Isolated as to prevent contanlnation
of the enployee's street clothes from Ms wort clothes. Employees exposed to asbestos during their work shift must shower
before leaving the plant and must not leave wearing contanlnated wort clothing. Employees working In asbestos areas must have
ready access to filtered air lunchrooms and Mutt wash thelrface mod bands prior to tatlng or smoking. .Protective clothlna must
not be worn In the lunchroom.
2.3.4
Laundering - Laundering of asbestos-contaminated clothing shall be done so as to prevent the release of
airborne asbestos fibers In excess of prescribed exposure limits. Those performing laundering of asbestos-contamlnated clothing
must be Informed of all requirements listed In Section 2.3, Personal Protective Equipment. Contaminated clothing shall be
transported In sealed Impermeable containers and labeled In accordance with Section 2.2.6, Label Specifications. If disposable
coveralls are used, they should be placed Into containers with asbestos for disposal.
"
L
I 22.6.1.2
l
UCC 015773
PAIGE 4 OF 7 DECEMBER 1966
- INTER DIVISION
2.4 Industrial Hygiene Responsibility
2.4.1
Monitoring - Employee exposure monitoring shell be conducted to determine compliance status with regard to
permissible exposure Units and respiratory protection requirements. Envlronnental/Area Monitoring shall be conducted along the
periphery of the restricted area to assure that fugitive emissions exceeding permissible exposure Units do not extend past the
denerested area. Samples shall be collected using 25 me diameter nixed cellulose filters and a SO an extension cowl. Samples
shall be of such frequency and pattern as to represent with reasonable accuracy the levels of exposure of the employees.
Monitoring Is required at least every 6 months for employees whose exposures to asbestos Is at or above the action level. Where
construction standard 1926.66 Is applicable, dally monitoring Is required unless employees use supplied air respirators In a
positive pressure node. Samples must be analyzed using a phase contrast microscope calibrated using a phase shift test slide
and equipped with a Walton-Beckett graticule. The filter samples must be prepared using acetone-trlacetln clearing solution and
be counted In accordance with the "A" rules contained In the NIOSH 7400 method. *
2.5 Training
2.5.1
All employees who are exposed to airborne asbestos concentrations In excess of the exposure limit listed In
Section 2.1.2 with or without the use of respirators shall participate In a training program at the tine of or prior to Initial
assignment and at least annually afterwards that Includes these Information topics:
1. Health affects associated with asbestos exposure.
2. Relationship between exposure to asbestos and smoking In producing lung cancer.
3. Mature of operations which could result In exposure to asbestos and necessary protective steps to minimize
exposure Including, as applicable, engineering controls, wort practices, respirators, housekeeping and protective
clothing.
. ...
.
.
4. Purpose, proper use, fitting Instructions, and limitations of the respirators used to protect against asbestos fibers.
5. Review of all provisions contained In 29 CFk 1910.1001, Asbestos.
6. Purpose for and description of the asbestos medical surveillance program.
7. Instructions for handling spills as well as emergency and clean-up procedures.
2.5.2
Training records shall'be maintained by the location and shall be readily available to all affected employees
and to OSHA personnel upon their request.
2.6 Medical Surveillance
2.6.1
Medical surveillance still be provided to all employees where exposure, without regard to the use of respirator.
Is at or above the action level for 30 or more days per year.
2.7 Federal EFA Regulation, 40 CFR 61, Hazardous Air Pollutants; Subpart H - National Emission Standard for Asbestos
2.7.1 Applicability - These requirements apply to the demolition of structures or renovation of equipment and piping that Involves removal of Insulation that contains friable asbestos materials. Friable asbestos material means any material containing more than 1 percent asbestos by weight that hand pressure can cruable, pulverize, or reduce to powder when dry. Demolition means the wrecking or taking out of any load-supporting structural member of a facility together with any related handling operations; on the other hand, renovation means to alter one or more facility components In any way without taking out load-supporting structural members. Planned renovation operations Include scheduled and unscheduled operations In which the
22.6.1.2
UCC 015774
STANDARD PRACTICE
INTER DIVISION
SH-256 PAGE b OF 7 DECEMBER ,1966
Mount of friable asbestos Baterial that trill be removed or stripped within a given tlae period can be ostlaated or predicted
based on operating experience. Adequately wetted Beans sufficiently nixed or coated with water or an aqueous solution to
prevent dust ealsslons.
*
2.7.2
Key Notification Requlreaents
. 1. Tlalng - The ERA aust be notified with a written notice of Intention to deaollsh or renovate according to these tlalng requlreaents:
a. As early as possible before renovation begins If planned, but not necessarily scheduled, renovation
operations are predicted to Involve the stripping or reaovlng of at least 260 linear feet on piping or 160
square feet on other facility coaponents of friable asbestos aaterlals within a year.
'
'
b. At least lo'days before a deaolltlon operation that Involves at least 260 linear feet on piping or 160
square feet on other facility coaponents of friable asbestos aaterlals.
c. At least 20 days before a deaolltlon operation that Involves less than 260 linear feet on piping or 160 square feet on other facility coaponents of friable asbestos aaterlals (EPA requires further advance notice for these deaolltlons that are shorter In duration).
. d. As early as possible before a structurally unsound facility In danger of laalnent collapse Is deaollshed under an order of a state or local governaent agency.
2. Text of notification letter - A suggested notification letter for the deaolltlon and/or renovation of facilities containing friable asbestos aeterial per requlreaents of 40 CFR 61, Subpart M, Section 146 (c). Is:
Fora of notification
HOT ICE OF INTENT TO DEMOLISH OR RENOVATE STRUCTURES. EQUIPMENT OR
PIPING INVOLVING FRIABLE ASBESTOS INSULATION
1. Naae of Owner
Union Carbide Corporation
2. Address of Owner
(Location Street Address of facility being deaollshed or renovated).
3. Description of Facility
Various buildings, equipment and piping used In manufacture and
distribution of chemicals and plastics and also age, site and prior
use of these facilities.
4. Estimate of Quality of Asbestos
Approximate amount of friable asbestos material present In the
facility and-explanation of techniques of estimation If estimate for
demolition operation Is less than 160 square feet or 260 linear feet.
6. Scheduled Start and Completion Dates
6. Nethod(s) of Demolltlon/Renovatlon
7. Compliance Procedures
How EPA reflations will be followed________________________________
U. 01sposal SI te
Name and location of site where asbestos waste material will be
deposited
Only parts 1 through 4 are necessary for demolition operations Involving less than 2oO linear feet or 160 square feet of friable asbestos material. The name, title, and authority of the State or local government representative who oroers the demolition should be added to the notification for demolition of structurally unsound facilities. Some states. Including Georgia, New York, North Carolina, and California, also require notification of demolition and/or renovation operations Involving friable asbestos materials.
UCC 015775
22.6.1.2
TANOARO PRACTICE
SH-256, PAGE 6 OF 7 DtLPffiER 18>BD
INTER DIVISION
2.7.3
Key Removal Requirements - For planned demolition operation or for the total of scheduled renovation
operations In which at least 260 linear feet or 160 square feet of asbestos Material Is rnsoved: .
' .4
1. Friable asbestos Materials shall be rtMoved before a deMolltlon or renovation operation If the operation
would likely break up or preclude access to the asbestos Materials for subsequent reMoval unless the asbestos Materials
are on a facility component encased In a Material such as concrete or are adequately wetted whenever exposed.
2. If a facility coaponent Is covered or coated with asbestos Materials-and Is renoved In sections or units.
It shall be carefully lowered, not dropped or thrown, to the ground level and shall have any exposed asbestos Materials
adequately wetted while cutting or disconnecting.
:
3. Netting Is not required during renovations If the EPA Is requested to confirm that wetting would
unavoidably daaage equipment. If the EPA confirms this, then a local exhaust ventilation and collection system must be
used to collect asbestos particulates. The exhaust systen exist exhibit no visible emissions to the outside air or be
designed and operated according to 40 CFR 61.164.
;
4. After sections or units of piping or equipment with asbestos Materials have been taken out of the facility, the asbestos Materials during stripping shall be adequately wetted or shall be collected by a ventilation and collection system as specified In 2.7.3.3.
6. Dust-tight chutes or containers shall be used to lower asbestos suterlal removed or stripped amre than 6b feet above ground level and not removed In units or sections.
6. All friable asbestos Materials that have been removed or stripped shall remain adequately wet until
collected for disposal.
.. ., .
.
.
7. and 2.7.3.6. possible.
If the ambient temperature Is below 0*t, then the only wetting requirements are those specified In 2.7.3.4 Equipment or piping coated or covered with asbestos Materials shall be removed to the auxlawa extent
8. For demolition of a structurally unsound facility under the order of a State or local government agency, the portion of the facility that contains friable asbestos Materials shall be adequately wetted during the wrecking operation. The wetting requirements specified In 2.7.3.4, 2.7.3.5, 2.7.3.6, and 2.7.3.7 shall also apply to aqy emergency demolitions.
2.7.4
Key Disposal Requirements
1. Visible Missions shall not occur during the collecting, -transporting,,or disposal of any asbestos-containing waste tutorial unless the air-cleaning methods specified In-40 CFR Part 61.164 are used to collect asbestos fibers before they escape to the outside air.
2. The disposal method for collecting and transporting asbestos-containing waste Materials shall be approved prior to use by the EFA, unless either of these two CPA-approved methods are used:,
a. Form all asbestos-containing waste material Into nonfrlable pellets or other shapes, or
b. Adequately wet end seal while tret In leak-tight containers all asbestos-containing waste Material. The waste containers shall be labeled according to Section 2.2.4.
i I
22.6.1.2
UCC 015776
8TAN0AR0 PRACTICE
INTER DIVISION
SH-2S6 PAGE 7 OF 7
DECEMBER*7966
3. The disposal site for asbestos-containing waste material shall have no visible esilsslons. or the disposed material shall be covered within E4 hours with at least six Inches of nonasbestos-containing material or with an effective resinous or petroleum-based dust suppression agent (waste crankcase oil Is not acceptable.) Alternative ethods for controlling asbestos emissions must have EPA approval before being laplewented.
4. Either a natural barrier or a fence shall adequately deter (as determined by the EPA upon request and supply of appropriate Information) public access to the waste disposal site. If fenced, then warning signs (kb* x 1a*) shall be posted at all entrances and at Intervals no greater than 330 feet along the perimeter of the sections of the site where asbestos-containing material Is deposited. The signs shall state:
ASBESTOS WASTE DISPOSAL SITE DO HOT CREATE DUST
BREATHING ASBESTOS IS HAZARDOUS TO YOUR HEALTH
k.b AUDITS
2.6.1
Each location shall periodically audit this procedure to ensure understanding and compliance.
UCC 015777
22.6.1.2
UNION CARBIDE CORPORATION
ENGINEERING, MANUFACTURING, AND TECHNOLOGY SERVICES.
CENTRAL ENGINEERING P. 0. BOX 8361
AWh/n'Mkft 4.1
SOUTH CHARLESTON, WEST VIRGINIA 25303
Ay***
46*
MEMORANDUM
BUSINESS CONFIDENTIAL
March 23, 1987
TO:
Mr. C. C. Neely
.
FROM:
G. B. Elder
SUBJECT:
Input to Minutes, March 17 Meeting on Phase-Out of Asbestos-Containing Materials
RECEIVED
MAR 2 5 1987 CCN
Item 4.2, Replacement of Asbestos-Containing Insulation as Required to Maintain Structural and Functional Integrity.
Abestos-contalnlng Insulation becomes a hazard when the weather barrier becomes damaged or other conditions such as powdering of the Insulation allows asbestos particles to become airborne. Corrective action would be removal of the Insulation or sealing the barrier to prevent airborne dust.
The Task Group agreed that each location Is responsible for and aware of the problem and that a criteria from the Task Group Is not desirable.
Item 4.4, Use of Asbestos-Substitute Materials
1. Insulation
a. Insulation materials that do not contain asbestos are the only materials currently specified and used, so no action Is required.
2. Gaskets
a. Suitable substitutes are available .and already accepted In the specifications (Grafoll, Spiral-wound with Teflon or Grafoll, reinforced Teflon).
b. Aramld-relnforced "nonasbestos" materials do not pass fire tests and have limited ability to maintain preload. A crash program to test these materials Is not justified and a program currently sponsored by the Materials Technology Institute has promise of providing an Inexpensive way to test such materials In the future.
UCC 015778
2- -
c. New materials that may be Introduced as asbestos substitutes will be tested as a normal technology activity.
3. Packing a. Grafoll and graphite-fiber packing will be adequate, so no action Is required.
4. Machine Gaskets a. These gaskets are bought as sets for the machines and substitutes are selected by the machine manufacturer.
Item 6, Identification of Asbestos-Free Insulation. a. Harold Clem's memorandum (attached) lists Identifiers currently being used In Insulation to show that It does not contain asbestos. b. Harold Clem Is polling the C&P locations to determine If they are currently using Identification tapes, embossed or color-coded metal weather barriers or other methods to Identify Insulation containing asbestos and/or Insulation free of asbestos. Location Practices documenting the Identification codes will be Issued In the Insulation Manual as appropriate.
Schedule: Complete poll of Identification codes - May 15. Issue Location Practices - September 30. Budget: $6000.
GBE/ds 2006H
UCC 015779
BUSINESS CONFIDENTIAL
UNION CARBIDE CORPORATION ENGINEERING AND HYDROCARBONS DIVISION
CENTRAL ENGINEERING
SOUTH CHARLESTON. WEST VIRGINIA
MEMORANDUM
February 13, 1987 TO: G. B. Elder, 511^
RECEIVED
.FEa!9 1987.
CC:
FROM: SUBJECT:
D. D. Barnette, 512 R. L. Boggess, 514 J. E. Boley, 380 D. L. Carrick, 519 A. W. Keene, 510 G. H. Reinhart, 312
L. E. Calvert, 511 S. W. Clark, 511 R. W. Engle, 511 T. E. Hanning, 511 D. J. Hymel, 515 R. W. Maddox, 511 D. D. Miller, 512 C. C. Neely, 511 M. Patel, 511 MOC .
H. G. Clem
IDENTIFICATION CODE FOR ASBESTOS-FREE INSULATION
This report is in response to your letter on asbestos identifica tion concerns with insulation in our plants. Three primary issues, integral asbestos-free visual coding for insulation materials, weather barrier coding, and asbestos identification tests are discussed under separate headings:
1. Integral Non-Asbestos Identification of Calcium Silicate Pipe and Block Insulation
All of our approved vendors for calcium silicate pipe and block insulation have visual identification dispersed throughout the white product fn the form of either gold colored mica flakes or black fibrous material to indicate that the insulation is asbestos-free as shown below:
0037J
UCC 015780
0037J
2- -
Calcium Silicate Insulation
Manufacturer
Asbestos-Free Identification
Kaylo 10-AF
Owens-Corning Fiberg!as Corp
Mica Flakes
Thermo-12
Manville Corp.
Mica Flakes
Super Cal temp NA
PABCO
Black Fibers
Manufactuers of expanded perlite. Material Spec. 4, also have asbestos-free visual identification. The current approved material, Goodtemp 1500 from the Howred Corporation, has a uniform pink color throughout the material. Celotemp 1500, a formerly approved insulation that is no longer being manufactured, contained mica flakes like the current calcium silicates.
Since apparently only solid white compositions like the early calcium silicates, 85% magnesia, and insulating cements for steam piping and boilers contained significant percentages of asbestos fibers, manufacturers of most other insulation materials have not adopted an asbestos-free coding system. Insulations with distinc tive characteristics or appearance like cellular glass (UCC Spec. 1), polyurethane foam (UCC Spec. 3 and 7), performed fiber glass (UCC Spec. 6), flexible plastic foam (UCC Spec. 12), and mineral wool (UCC Spec. 14 and 40) never contained asbestos.
Of course, since the use of mica flakes and other visual coding was not widespread until the mid 1970's, most insulation in older units may require laboratory testing for possible asbestos content before replacement or modification.
2. Asbestos-Free Visual Indicator for Metallic and Mastic Weather Barriers
You asked for a durable visual indicator for metallic and mastic weather barriers to indicate that the insulation underneath did not contain asbestos. I have found that several methods are being used in the petrochemical industry, but there is no universal standard on this important subject. A'summary of asbestos-free identification methods related to weather barriers is listed below:
Surface Texture Variations:
Reportedly, Tennessee Eastman, Eastman Kodak, and Amoco have adopted the use of a "stucco embossed" texture finish in either flat or 3/16" corrugated configuration for aluminum or stain less steel weather barriers on all Insulation replacement projects. This method provides a distinctive visual coding that contrasts with the older smooth finish metal weather barrier sheet material.
UCC 015781
-3-
0037J
Surface Texture Variations - Cont.
Only minor changes are required in installation procedures with this approach, and planned or-inadvertent painting of the weather barrier will not affect the visual identifica tion characteristics. The method is not applicable to mastics or plastic weather barriers, however.
Color Coding:
This procedure involves the use of factory finished weather barrier in a specific color to indicate that the insulation is asbestos-free. The colors most used for this purpose are white, green and blue. To be effective, this method would require coordination with existing UCC safety color coding in the plants.
Identification Tapes:
This method utilizes making tapes applied over standard weather barrier materials to indicate that the insula tion either contains asbestos or is asbestos-free. E.I. DuPont de Nemours & Co. (Inc.) uses this method. A copy of the DuPont specification entitled "Identifi cation for Installed Asbestos-Bearing Insulation" is attached for reference.
This type of identification tape is available from several suppliers. The DuPont tape features fade proof ink lettering and background with a clear polypropylene coating for chemical resistance and durability. The asbestos rode lettering is combined with arrows to show the direction in which the indi cated insulation runs.
The primary advantage of identification tapes is that any type of weather barrier may be marked whether new or exist ing. Entire sections of plant units can be defined as asbestos-free with this technique. The main disadvantage of tapes is that they may be inadvertently painted over or removed during routine maintenance activities.
Various versions of asbestos-free identification tapes are available from graphics label suppliers. In most cases, pressure sensitive vinyl is used for the tape material. Unlike the DuPont specification tape, the "ASBESTOS FREE INSULATION" labels and direction arrow tape are usually separate items, not combined. The blue background/white lettering is the same in most instances.
UCC 015782
-4-
3. Asbestos Identification Methods
The identification and monitoring of asbestos fibers from insulation or other sources is the responsibility of UCC Industrial Hygiene Groups at our various locations. According to Mr. Manhel Patel at the Tech Center, several test methods are available to identify asbestos including colorametric test kits, microscopic examination with polarized light, scanning electron microscopy and trans mission electron microscopy.
However, the colorametric technique is not as reliable as the microscopic methods because it only detects iron and magnesium from bulk samples; interference from related compounds can affect test results. The microscopic methods are approved by OSHA, EPA and NIOSH and represent the best current procedures available.
It is apparent that devising a better way to identify asbestos that meets government approval will be difficult. If quicker results are needed at our plants on insulation replacement jobs, consideration should be given to pre sampling the existing insulation well ahead of any planned work.
Conclusions and Recommendations
The visual asbestos-free coding methods of our calcium silicate and expanded perlite suppliers, ie mica flakes, black fibers, etc., will be included in our UCC Material Specifications 2 and 4 as suggested by Don Miller of the Institute Plant. This may provide some valuable assist ance in the field identification of insulation materials.
Concerning the visual asbestos-free coding of weather barriers, it appears that no single identification procedure may be suitable for all conditions in our plants and other facilities such as laboratory buildings. One of the main problems is the diverse types of weather barriers encountered; aluminum, stainless steel, PVC, fiberglass laminate sheet, and mastics. Some differences are also evident in our options when we are replacing asbestos containing insulation versus simply labeling or marking a "good" existing asbestos-free system.
Current asbestos and asbestos-free insulation coding procedures at UCC locations range from no identification marking to marking all asbestos containing insulation with labeling tape and entering a code for asbestos replacement jobs in the computerized work orders for storage and retrieval. Before we introduce a UCC recommended practice or standard on weather barrier
0037J
UCC 015783
-5 -
identification coding, a poll or request for comments should be solicited from plant insulation representatives and other responsible parties. To assist in the proposed poll, actual samples of identification tapes and embossed metal weather barrier would also be sent to each respondent.
If there are further questions or comments, please call me.
HGCres ATTACHMENT
18495
INDEX:
6, 7, 10, 23, 28, 30, 32 42, 43, 44, 44A, 62, 71, 81 112, 120, 121, 122, 127, 138 142, 180, 307, 318, 351
0037J
H. G. Clem
UCC 015784
225
IDENTIFICATION FOR INSTALLED ASBESTOS-BEARING INSULATION
THERMAL INSULATION STANDARD ENGINEERING SPECIFICATION
ISSUED
THIS PAGE REVISED STANDARO REAFFIRMED
JULY 1975 APRIL 1984 APRIL 1984
Page 1 of 2
1. SCOPE
>- . .
1.1 This specification provides information for a stan dardized method of placing identification on installed insulation which contains free asbestos fibers or insu lation oFunknown asbestos content.
1.2 This specification is applicable only for identi fying installed insulation which has a questionable free asbestos fiber content. Obviously, materials such as cel lular glass, glass fiber, mineral wool, polyurethane foam, and polystyrene foam do not contain asbestos fibers and, therefore, do not need to be marked for identification.
1.3 Follow this specification only at locations where
such identification is required by the operating de partment and the plant does not have a conflicting estab lished identification procedure.
2. CONDITIONS
installed, do not require identification. At turnover, the local construction organization is to notify the plant that the facility is free of materials containing free asbestos fibers.
4.2 , Condition II. Individual insulated lines or equip
ment pieces in clearly defined additions in which no
insulation containing free asbestos fibers was installed,
do not require identification. In lieu of marking individ
ual lines or equipment pieces, place strips of tape strate
gically along the plane that defines the building
addition. Locate the tape on selected columns, beams,
wails, or ceilings, to clearly identify the plane at which
the asbestos-free insulation starts. Apply two parallel
strips of tape. Position one piece of tape with the arrows
orientated to indicate that, from that point on, all insu
lation is nonasbestos. Position a second piece of tape
with the arrows orientated to indicate that, from that
point back, the insulation may contain free asbestos
fibers.
-
2.1 From an installed insulation viewpoint, specific areas on a site are classified as follows:
2.1.1 Condition I. New facilities on which no in
sulation containing free asbestos fibers was installed. This could be an entire site or a segregated building on a site.
2.1.2 Condition II. New additions to existing
buildings which can be clearly defined by designated column lines or a defined plane through the building. The addition does not contain any insulation containing free asbestos fibers.
2.1.3 Condition III. Existing areas which are
modified by the addition of insulated lines or equipment.
4.3 Condition III. Individually mark all new insulated
lines and equipment pieces installed as additions or modifications in existing areas to indicate insulation as bestos content. Where asbestos-free insulation is in-/ stalled on a pipeline, place a strip of tape around the circumference of the finish at the points where the pipe goes through a wall or partition. Orient the arrows to indicate that the line inside the room has asbestos-free insulation. Where a tie-in is made to a line insulated with a material of unknown asbestos content, identify the junction of the insulation by parallel pieces of tape around the circumference of the finish. Position one piece, of tape to indicate that, from that point on, the insulation is asbest06-free. Place a second piece of tape with the arrows orientated to indicate that, from that point on, the insulation may contain free asbestos fibers.
2.1.4 Condition IV. Existing areas in which exist
ing insulation is being'replaced.
3. TYPE OF IDENTIFICATION
For identification, place strategically located strips of appropriately marked tape around the circumference of the pipe finish or on the equipment finish. Position the tape so as to indicate the type of insulation used with the arrows pointing down the line in the direction in which the indicated insulation runs (see Figure 1).
4. PLACEMENT OF IDENTIFICATION WHEN REQUIRED
4.1 Condition I. Individual insulated lines or equip
ment pieces in new facilities or segregated buildings in which no insulation containing free asbestos was
4.4 Condition IV. Where insulation is being replaced
in an area of unknown asbestos content, by asbestos-free insulation, identify the replacement insulation by a strip of tape placed around the circumference, of the pipe finish or at strategic locations on equipment pieces. Where a line running from wall-to-wall is reinsulated, place a piece of tape at the points where the pipe goes through a wall or partition. Orient the arrows to indicate that the line inside the room has asbestos-free insulation. Where a portion of the insulation is replaced, identify the junction of the existing and replacement insulation by parallel pieces of tape around the circumference of the finish. Place one piece of tape to indicate that, from that point on, the insulation is asbestos-free. Place a second piece of tape with the arrows orientated to indi cate that, from that point on, the insulation may contain free asbestos fibers.
nmuUITTFP MO K
UCC 015785
.
f; SN 218 P
Pag* 2
.. --
IDENTIFICATION FOR INSTALLED ASBESTOS-BEARING INSULATION
This Pag* Rv April 1984
-- 5. HANDLING INSULATION
" When handling, fabricating, or removing insu lation in the absence of positive knowledge that it is . asbestos-free, assume that it contains free asbestos fibers, and follow S4T.
6. TAPE
__ '* ' 6.1 Specifications (see Figure 1)
a. Supplied in rolls.
b. Pressure-sensitive contact cement backing --
developed for aircraft use.
C. M-90 tape material -- developed for aircraft use.
d. Provide slit in release paper for easy removal.
e. ASB letters and arrow red, repeated on 3-inch
intervals, on while background. NA letters and arrow blue, repeated on 3-inch intervals, on white background. Letters are approximately 1-inch high.
7. TAPE SUPPLIERS (PARTIAL LIST)
Davis Printing Co P. O. Box 6% Camden, SC 29029 (803)432-1901
Top Flight Corp 165 East 9th Avenue York,PA 17404 (717)843 -9901
-
T & B Westline Division of Thomas & Betts Corp 220 South Rose Street Los Angeles, CA 90012 (800)421-8618
Sheriden Safety Supply 7029 Huntley Road Suite E Columbus, OH 43229 (614)888 - 8040
York Tape and Label Corp P. O. Box 6805 * Columbia, SC 29260 (803) 788 - 2635
226
Legend: ASB " Asbestos Bearing - NA = Nonasbestos Bearing
FIGURE 1 - TAPE FOR IDENTIFICATION
. --UCC 015786 .
...
,
PIPING TECHNOLOGY
MINUTES FOR INCLUSION IN ASBESTOS TASK FORCE GENERAL MEETING MINUTES
Addressing Section 4.4.2 of the agenda listed in C. C. Neely letter dated 3/2/87 ...
R. N. Engle presented proposed plans far modifying the Valve and Piping Specifications using strictly GRAFOIL n products as the only
replacement for asbestos. First step would entail developing new UCC "V-numbers" for those valves which are currently listed with asbestos packing and/or bonnet gaskets and no GRAFOIL n alternate. Piping
Technology will maintain the did numbers unique to aid in identification of existing valves. Once the new numbers are developed, they will be transferred to the affected piping specification sheets.
Secondly, as with the valves, the existing specification names will be maintained unique by cancelling the existing suffix letters and starting with the next available letter e.g., 1C2 though 1C2E will be listed as "cancelled" and the new listing will be started at "1C2F". The acceptable linejaasket alternate for the asbestos ring will be the 1/16" thick GRAFOIL r GHE and the acceptable replacement filler for spiralwound gaskets will be GRAFOIL n Grade GTB.
The proposed schedule would target July 1988 for completion of issues
to the manual; the proposed asbestos program would not be reviewed
through normal Technology Manuals Standards (TMS) channels due to the
.nature of the changes. Piping Technology believes there to be 2-3 man-
months ( $5000.00/man-month) of work involved in the transition.
Approximate printing/distribution cost would run in the $5000.00 range.
An accelerated schedule may become necessary if vendors confirm earlier
reports of supply problems and would definitely extend the estimated
time into 3 man-months because additional technical manpower would be
required. Sherry Murphree will continue to feedback on market
conditions.
'
R. W. Engle/pae March 24, 1987 AJ4:RHE
UCC 015787
WANG TO:
C. C. NEELY - Location 511
From:
S. S. Murphree - Loc. 515
Secretary - Anita Thaxton - 721-4802
Purchase of Asbestos - Substitute Material
The Chemicals and Plastics Division agreements for gasket and packing materials are due for renegotiation in second quarter 1987. The procurement plan and request -for cfuotes have been issued. -Bids are now being received and new agreements are expected by June 1, 1987.
The traditional method of predicting quantities, material types, and dollars for price agreements is past history and anticipated future activity. Our past history of gasket and packing usage shows a heavy dependance on asbestos at very low prices. We are already seeing a changeover to the Grafoil and teflon based material. The new agreements will be based on anticipated increased usage of these materials and dramatic decreases in asbestos use. Our expenditures will increase due to higher priced asbestos replacements, higher .pri.cad asbestos, and increased activity of a wide variety of materials.
Many of our traditional gasket and packing manufacturers are no longer in the asbestos business (Johns-Manville, John Crane, All pax, etc.). The manufacturers who currently handle asbestos do not have assurance from their liability carriers that coverage will continue beyond the next twelve months. Parker Seals has announced July, 1987 as their cutoff date for asbestos manufacture. We have no certainty that asbestos will be available thru January, 1989. From the purchasing viewpoint new standards for gasket and packing should be expedited to the nearest feasible deadline.
After new gasket and packing standards are determined a tremendous effort will be required in the plant storerooms, purchasing groups, and maintenance departments. The effort will be three-fold:
1. Alternates to stocked and purchased material will be determined for each application.
2. New descriptions and usages will be determined and changes made. Major C & P locations have 2000 to 3000 separate line Items. A plan for changeover from old to new material will be required.
3. Training and communications will be needed for every end user.
It is estimated that the effort for maintenance and materials management will require four to six months of work at each location.
Sherry S. Murphree 3/30/87
RECEIVED
MftR 3 01987
CCN
UCC 015788
9
(Ljg^ '^e
<La-C
9><^fj4 (Saylor iE CORPORATION JRING, AND TECHNOLOGY SERVICES kl Engineering kston, West Virginia
NESS CONFIDENTIAL
jri 1 6, 1987
S. W. Clark G. B. Elder R. W. Engle S. S. Murphree
; $,y/ j^-eo ia>,y/
fiieuJ- &// o/ kf&yL f
c<mh>*s(oq
t/ndr* c/z^z/ion Uk
COPY TO:
R. R. Allen H- N. Baylor D. J. Dickson P. D. Franson P. R. Kavasmaneck 0. G. Keeler W. G. Lilly, Jr. B. G. Perry J. E. Sanders S. W. Turlcchl
/o^sjc/ v4
b*p /o///P7.
^ (t9u9~>i<3 c^hr^pUA^
j03f
FROM:
C. C. Neely
SUBJECT: Minutes of Task Group Meeting of March 17, 1987 Phaseout Use of Asbestos-Containing Materials In Work Place Chemicals and Plastics Group
Following Is an Executive Summary of the action/agreements resulting from the subject meeting. The detailed minutes prepared by the responsible Task Group member are attached for those who desire additional Information.
Executive Summary
The "heart" of the C&P Group asbestos-usage phaseout program Is the requirement that no asbestos-containing products be purchased after January 1, 1989. Consistent with this date, the Task Group agreed last fall when preparing the proposed program that the affected valve, piping, and process vessel Standard Practice documents must be revised to show substitute materials by July 1, 1988, and manpower estimates were made accordingly. However, because of the rapid (and very likely, continuing) reduction of suppliers of asbestos-containing materials due to liability Insurance coverage problems. In combination with the desire of key plant personnel to cease using these materials at an early date, the Task Group
UCC 015789
/B
T? B OVb 7
/ r/yto jbJn^
c2mOJ* /a^U>h/c&t
T]
------------------------- UCC015790 --
Tfljl Cy
17
o .. 4^//
OX kkMze^
C/sm,
' 6&m>___ _
__ rcD
/i^ dowL
S 5^ ......
Pxrl
~ OL^P
l<P /h*UM*y.' --
(z&0~ Cfyfi Js nrrusrM&. -
nmuL
\i
. \ izi'.........
fwtAJt. UtoU, yWT|W>' (lOTi^e^ J*^ typ/-
*/ Scjdtp^ 3
S^ctwyi ............................
^t^K. {z> ^ma XJz jfa/JL.................... . _ ___
lP>P?t
/ofe XJ{ms
fippwrtl
Ue*~ db$M)i4*cfc
C&vwdC Ci^$ct^bju( ---------------S_______ ______________
jfjfUTAJl /LtWWN^^
_____ ^______
_
<-
UCC 015791
2-
4- 5 ^A7y\aMWLL
*VU} l /4> A
kbw fa 'Pula/ frs>^ * Atfagfcf sjuUptnicf-
fCefiitUct - S/fckmi. 'sfatuy
/M\{W<dltl
................... _ ________ /VWftAAjXz oCtf* ^ "iucJ^pui &mJLfijUe>
(jQldUto, \
-b Chs&L ( *
vrtcb^
/rruvustyg' &CCWlMMr^...ilicfay^; ?^6C4SSCQ2&
....CtnrfaiwMtf J,/9f9........................................
-3^SS*. -- ^
&pyyt/o
jewifiActins, ? net
k-&aj%i sfai ; /&/re ',____Tims. ^ c^ zs%r*r\c&-
(ql/vt &*> /ty izclvstpic
SuMrfrfts-
jbnj^nr^m^ bwt wfc bu*
as ye/-.
^of d' t^/nipOs AdATCuM4U
-....._...6?^^
/k.faurfjOS.
........... ................
.7 $uu<x-
^ y&V dT'ttJjLSls ^
-7^
0tTvL\^
............. /A/*> /^cA.
jV/f 4^^ /v*yf'/A/\fi* UCC 015792
%SC&A^.
h&UrUl /Q!m Aiftlfel
Cr&L (jrv dsitsfr* ToufJL ( Cj@ir& ^rv f
h-
Aj
J kvt /yurt
/f/W.
W'YfAti TjcZr^UtS farClitidbllt
..cAjirg (THSL ~7UufiiU
kJ(fiMA MksL,
kwwh/ i*^u4 cfr\JL -^hc^cof.
J& ii j&senjtid
a s^jl mwwvwnhd ..^wz^h'.
<D(I ....cn*f W&rfb jo put tlkt UP ct^ ^ "- ^/ide H/fitf t%id)
wit [WruLt dlyfa&dtsh hsf TO fy*>E Jcb*r-.
UCC 015793
WlrfUi kAMV Urtfad- - OhL.
cmmtc dicncm ?
..........
Jisfut ikhAmatu/v^... .....
'qpDSUAii^ jwM\ r +
ihtf /U^oatk
.
5ltL WW
sfi WK)..Mru/fa*
yio (Xcbu/VK
UCC 015794
4" 3....... att-gfa Hec osm 4 ppa
[Km
S&'ZFb fa- $/,^tA4rr(_Aj jfaj!
- - 7%e I k>ki(ks - Qrti/wMrf /)^tjMul<,...... vs... bsidd^ML
AWmt jx> ^
(Vv^4^/..;{. C^L wki. it)
fa_____
wt.... (j^
' nu> CMAAQ^t -&st~ cOdiu. (O'Z)
' ' $8st. zie*r*nsxJL; (Wf tostfvrty\ / ^
........... ..
------ '
So. Chitf - Ulll ovt- IMt
cyy\6\sl
gcuk&h
7WL
'htki............................
Ttsf
/Q^ve ~1W
C.__ 2~3J/V''$A-
/yr^Yrt^)'
y
rUjJvvtsf TAflwt-fp CyrniMivfc
.. T& idhrwjf,. ^
6+tflAJ^/....................
(jftt>lfj{S
cut
'1
f ilUh^ pfiekc*^
wiiL-thvK
UCC 015795
)M#fc '
% dMrui JJ$*L
$
yU/y\ dsk&J'ts - pubijiiufis
MT1 - Orr^AA.ct________
__ Tist
~b/*W
...... ^im^/fM .............
(? J/mdits -
\-iaI hk - SakMvfc /ym^MuJs tfa M)f ptwz'
MUs',., rjiUt
(A^~ 0<-
! /StAJjwnJiA.
7H
/
@AAsL JUnpjA^ ; -
fM/l /psm>
-&-
{k%k& --
S^e.
nalibrti h> ti&ktfos U'dz.tlM#,
GC 71^
A&)
__ y<s^^,e^' y M^L
............................. 7U^
UCC 015796
pvsn^
4.4,7.
7 JL(h'
lAw. vnmaaL
^ {pAdL*4f% .
1/4P $>jatcs
ttMA-
IV^iCt wC <W_
----~-- -twyldklvv'----~--;----- ---im Mt
a^ ^
*A*l h*L /buy?
AM ^ /tyec
qJtidtJL, ir
&*y(
S-t^lCc GctM' PP 4-
JlfrTJjW^&vdL
/f
$A3... C\
UCC 015797
4-^,4- S&aaki
,, ./
. ----
"-
..........
trvJc, tm^r iaML /Wh~fa> iv*&s.
~~
__ ___ _______ 6ktyPOIL - /vW /J l/z P^CL ' /rrvUwyt ^ MrwlcU/j
______
7k) wUc o/i
Ijj' mUl
* 6$llool
I
.
--
:
rn^uw - ili/mjf grf-
............... .............. j)
_ , ..... . _ _ _.
bfilL bt A.
0W/ jjh*r ( 7*},
2%&/~ fe,, M ^ /Jtoii'ltcM. &> ____ ___ __________ __ _
27/ PiKcJd^ <t TO
no^o Ukzhs
L-(Jjlmu GtTy&vT' pi/lU ''*/ <Dlkc
tvlh Atfowki/
UCC 015798
Of.S l
9VMjd
/yyu/yud^S
UCC 015799
So <Smw&f
Fotm^ cm /cJrw"h> pidt
____ _____ _______
____wtefc
-<& ryn9V* <&. **k
(ItfHillA
(/Vh^ /SU-e. /(W />m^
...djrzMwcf' ttfe&S A> tMw>io
(bhrtxh : jJLf- 'fwy&A*
jAfylLt r...,, &/ ^ bMfiOlL t
m
Jklfyypf: ....
--- X"---------------- x-------- --
ckAii^f - rr^JtK-lc
UCC .015800
10
UNION CARBIDE CORPORATION ENGINEERING, MANUFACTURING, AND TECHNOLOGY SERVICES
Central Engineering South Charleston, West Virginia
UCC BUSINESS CONFIDENTIAL
March 2, 1987
TO: L. E. Calvert S. W. Clark G. B. Elder R. W. Engle S. S. Murphree
COPY TO:
P. D. Franson P. R. Kavasmaneck W. G. Lilly, Jr. B. G. Perry D. L. Runyon J. E. Sanders S. W. Turlcchl
FROM:
S/i.- Neely
SUBJECT: Phaseout Use of Asbestos-Containing Materials In Work Place Chemicals and Plastics Group.
Confirming my telephone conversations with you, I am pleased to
report that our Vice-President, Mr. B. G. Perry, and the Manufacturing
Council have endorsed our proposed program dated 9/29/86 (copy attached for
convenient reference). Mr. Sanders has. In turn, requested that we
reactivate our Task Group and commence developing plans to implement the
program. (See J. E. Sanders' memorandum dated February 19, 1987, copy
attached.) I accordingly am pleased that those of you on the original Task
Group have expressed willingness to continue your participation. It is also
a pleasure to welcome Sharon Murphree as a new member of the Task Group
representing the purchasing function. Of course. It is recognized that we
each will probably need the assistance of others In order to accomplish our
portion of this assignment.
.
We need to have a meeting soon In order to develop an overall program, schedule, and budget for our activities. I have accordingly arranged for a meeting as follows:
DATE: Tuesday, March 17, 1987
TIME: 8:30 a.m.
PLACE: Building 2000, Room 2505
UCC 015801
Memo
-2-
March 2, 1987
A proposed agenda Is attached. You will note that, except for the important aspect of obtaining general understanding and acceptance of the program by key plant personnel, the agenda is simply based on the J listed in our recommended program that are assigned to the Centra. Engineering Department. Your comments on this proposed agenda are earnestly solicited.
I look forward to a productive first meeting. Please let me know if something comes up that will not allow you to attend.
CCN:at Attachments 47071
UCC 015802
PROPOSED AGENDA MARCH 17, 1987 MEETING IMPLEMENTATION PROGRAM TASK GROUP PHASEOUT OF ASBESTOS-CONTAINING MATERIALS IN WORK PLACE CHEMICALS AND PLASTICS GROUP
1. Call to Order
2 Adoption of Agenda /. jTd L.
3. Announcements
4. Develop and Maintain C&P Standard Practices
4.1 Identification of Asbestos-Containing Materials
Standard practices covering this activity are primarily the responsibility of the Industrial Hygiene Group. Stan Clark Is assigned lead responsibility and will report on proposed activities (see Footnote 1).
. ^
4.2 Replacement of Asbestos-Containing Insulation as Required to Maintain Structural and Functional Integrity
Perhaps CED can develop some criteria for establishing how to recognize when the structural integrity of insulation has deteriorated sufficiently to become a health hazard. George Elder Is assigned lead responsibility and will report on proposed activities (see Footnote 1).
0MvJ
4.3 Removal. Modification, and/or Disposal of Asbestos-Containing Materials
Standard Practices covering this activity are also primarily the responsibility of the Industrial Hygiene Group. Stan Clark Is assigned lead responsibility and will report on proposed activities (see Footnote 1).
4.4 Use of Asbestos-Substitute Materials
4.4.1
George Elder has lead responsibility for establishing which f^AP0lL\
asbestos-substitute materials are acceptable (health effects{ as well as functional acceptability shall be considered) and\
will report on proposed activities (see footnote 1).
UCC 015803
AGENDA (Cont'd)
2- -
COP -I p(/ cOP-H COP-ii
cip-W UwfUJSuvTi*,
4.4.2
Rex Engle has lead responsibility for modifying the Valve and Piping Specifications to Include asbestos-substitute materials and will report on proposed activities (see Footnote 1).
dthwi^Jb Spto^M---------
4.4.3 Clyde Neely has lead responsibility for revising the
Pressure Vessel and Tank Specifications and will report on
proposed activities (see Footnote 1).
4 Ec$
4.4.4 Purchase of Asbestos-Substitute Materials
} ,4
(jBYtMf
Sharon Murphree has lead responsibility for the purchase of the substitute materials and will report on planned activities (see Footnote 1).
4.5 Variance Procedure to Cover Consideration of Uncommon Circumstances
Presumably each plant will use its own variance procedure; however, ideas from the group on this subject will be solicited.
5. Conducting On-Site Seminars at Institute, Seadrift, Sistersville, South Charleston, Taft, and Texas City
As Indicated In the Task Group's September 29, 1986, memorandum entitled "Proposed Technology Program In 1987 In Support of Existing Operations" (copy attached), we recognized the importance of this activity since the cooperation of each location is essential, to the success of the program. Clyde Neely will lead a discussion regarding this subject, with a consensus agreement on the desired program being the objective.
6. Other Business Items
6.1 Next Meeting Date
7. Adjournment
------------------x------------------ xx 1) Proposed activities will Include preliminary outline of overall program
and associated schedule and budget. It may be appropriate to request that specialist directly responsible for doing the work be present.
UCC 015804
***
UNION CARBIDE ***
**
* *
*
INTERNAL
i CORRESPONDENCE
Engineering, Manufacturing, and Technology Services Post Office Box 8361
Central Engineering
Building 2000
Technical Center
South Charleston, WV 25303
Febuary 19, 1987
TO: Mr. B. G. Perry
COPY TO:
Mr. P. D. Franson Mr. W. G. Lilly,Jr.
Mr. C. C. Neely / Mr. S. W. Turlcchl
SUBJECT: Asbestos Usage
tecavsD FEB 2 3 1987
ecu
Bob:
We are proceeding to establish plans to Implement the phase-out of asbestos-containing materials from C&P facilities. I have asked Clyde Neely to lead this effort which will require resources and Input from Maintenance groups. Purchasing, Safety and Health as well as Engineering Technology skill centers. Clyde will. In the next couple of weeks, develop a plan out lining the general steps required for this program between now and January 1989. We'll keep you posted on progress.
_Very truly yours,
JES:he 4898Y(4)
J. E. Sanders
UCC 015805
UNION CARBIDE CORPORATION ENGINEERING, MANUFACTURING, AND TECHNOLOGY SERVICES
Central Engineering South Charleston, West Virginia
UCC BUSINESS CONFIDENTIAL
September 29, 1986
TO: Mr. J. E. Sanders
COPY TO:
Mr. L. E. Calvert Mr. S. W. Clark Mr. G. B. Elder Mr. R. W. Engle
FROM:
C. C. Neely
SUBJECT: Proposed Technology Program In 1987 In Support of Existing Operations
In am submitting herewith an additional program In the subject category, this one In support of the work associated with the Implementation of the proposed new Standard covering the phase-out of asbestos-containing materials In the work place.
Our estimate of costs Includes the following:
A total of approximately one man year of work relating to the selection of suitable non-asbestos gasket/packing materials as a function of service conditions, and revising the affected standards (or developing new standards) accordingly. This work will be conducted primarily In the Materials and Valve and Piping Skill areas. At this point we do not envision the wholesale use of new gasket/packing materials, but rather a broader use of currently used materials (e.g., reinforced Teflon, GRAFOIL"). Approximate cost: $64,500
Printing and distribution of the revised standards.. Approximate cost: $12,500
Conducting on-site seminars at Institute, Seadrlft, Slstersvllle, South Charleston, Taft and Texas City to explain the basis for the revised gasket/packing material selection. These seminars are recommended In view of our belief that simply reissuing the various standards with revised gasket/packing materials will not result In timely understanding and acceptance of the revised gasket/packing material specifications. Approximate cost: $16,000
UCC 015806
Hr. J. E. Sanders
-2- September 29, 1986
We would be pleased to provide additional Information If needed.
CCN:mr 00021 Attachment
Special Work Group on Phase-out of Asbestos-Containing Materials
UCC 015807
rrtOPOSED CED TECHNOLOGY PROGRAM 1-uR 1987 IN SUPPORT OF EXISTING OPERATIONS
Work Associated with Implementation of C&P Recommended Program Phase-Out Use of Asbestos-Containing Materials In the Work Place
Objectives:
(1) To obtain understanding and acceptance of the Recommended C&P Program by key plant personnel.
(2) To develop C&P Standard Practices covering: Identification of asbestos-containing materials Removal, modification and/or disposal of asbestos-cbntalnlng materials; and Use of asbestos-substitute materials
Brief Description:
The primary means of obtaining U/A of key plant personnel would be by on-site seminars and written follow-up. C&P Standard Practices development work would proceed In usual manner.
Results Expected and Schedule:
Would promote smooth transition to non-asbestos containing materials. Most of CED's work would be complete by July 1, 1988.
Best Judgment of Costs:
$93,000
43071
UCC 015808
UNION CARBIDE CORPORATIONP. 0. Box 8361
Engineering, Manufacturing, and Technology Services
So. Chas., WV 25303
Central Engineering
BUSINESS CONFIDENTIAL
September 30, 1986
TO: Mr. J. E. Sanders
COPY TO:
Mr. L. C. Calvert Mr. S. W. Clark Mr. G. B. Elder Mr. R. W. Engle
FROM:
C. C. Neely
SUBJECT:
Final Draft of Recommended C&P Program Phase-Out Use of Asbestos-Containing Materials In Work Place Chemicals and Plastic Group
Attached herewith on behalf of the Special Working Group Is a copy of the subject document dated 9/29/86. It Is a slightly fine-tuned version of the 8/28/86 version which was transmitted to you under my transmittal also dated 8/28/86. The changes that have been made are of a clarifying rather than substantive nature.
At this point, we have not made an effort to obtain broad, formal review of the subject program. However, Larry Calvert has discussed It briefly with the Maintenance APM's and Maintenance Managers. In addition, Stan Clark arranged for Its review by the Safety, Health Advisory Committee (SHAC), and your staff has reviewed It. Feedback Indicates these groups to be supportive of the concept, but some have expressed concern regarding the January 1, 1989 date specified for the discontinuance of the purchase of asbestos-containing materials, believing It to be optimistic. Some of the concern relates to the following:
1. CEO's ability to revise and reissue the V&P Specifications and the Valve Manual In time to support the deadline. The responsible CEO specialists have carefully reviewed this matter and believe that reissuance of these Manuals by July 1, 1988 Is realistic. This date has not been published, however.
UCC 015809
Mr. J. E. Sanders
-2- September 30, 1986
2. Belief that field testing of new gasket and packing materials will be required. Such testing will not be necessary since the plan at this time Is to accommodate most of the substitutions by broadening the use of materials already In use, materials such as reinforced Teflon and GRAFOIL". This plan has not been broadly disseminated, and we can fully appreciate the reluctance to agree to a purchasing cut-off date for asbestos-containing products without knowing what the substitutes are. We also appreciate that, once this material substitute plan Is known, there will be a natural resistance due to the higher first cost of these substitute materials.
3. Some belief that Installers will need special training to handle the new gasket and packing materials. For reasons cited In (2), we do not believe this requirement will be significant.
4. Perhaps lack of understanding that the January 1, 1989 date Is the cut-off date for the purchase of asbestos-containing materials except as approved by a variance.
5. "Is this really necessary" attitude. The Special Working Group believes that OSHA's recently revised exposure limit of 0.2 fibers per cubic centimeter of air (was previously 2.0 fibers per cubic centimeter) add significant Impetus to Implement the proposed Recommended Program. According to Terry Hanning's September 5, 1986 memorandum (copy attached), labor union representatives do not believe that controlling the exposure limit to this lower level provides adequate protection.
The above concerns notwithstanding, the Special Working Group decided to submit the subject Recommended Program to you with the January 1, 1989 date Included since we believe that, with proper communication with the key plant personnel responsible for Its Implementation, along with management support, this date Is realistic and achievable. We are submitting under separate cover a proposed CED Technology Program which Includes request for funds to cover the Important communications aspect of the understanding, acceptance and Implementation process.
Please let me know how we can be of further assistance regarding this matter.
CCN:mr 43191 Attachment
UCC 015810
DRAFT
RECOMMENDED C&P PROGRAM CHEMICAL AND PLASTICS BUSINESS GROUP (C&P)
9/29/86
GOAL: PHASEOUT USE OF ASBESTOS-CONTAINING MATERIALS(1>IN THE WORK PLACE
PURPOSE/BACKGROUND
The Corporate Charter (1.1) contains the following commitment to em ployees:
"To provide working conditions, programs of training and education, and persistent review and appropriate modifi cation of facilities and practices to protect the health and safety of employees."
It also contains a social commitment to conduct business "in accordance with all the applicable national and local laws and regulations."
As a result of available evidence that airborne asbestos In the occupa tional environment had proven to be carcinogenic In man, all C&P Insulation Standards were revised In 1976 to specify only asbestos-free Insulating materials; and new or replacement Installations of these materials have sub sequently been selected accordingly. Additionally, a Safety/Health Standard designated SH-256 was prepared covering the safe removal and handling (in cludes disposal) of asbestos-containing Insulating material during renova tion and demolition. The requirements of thi s'Standard equal or exceed those of current applicable government standards.
OSHA's rule-making efforts relative to asbestos usage in the work place are mired In controversy. Hearings on the latest EPA proposal which In cludes the phaseout of all asbestos over a ten-year period are now In prog ress. The proposal states: "EPA is considering banning the manufacture, importation, and processing of asbestos construction products and asbestos clothing soon after the rule's promulgation With the category of asbestos friction products banned about five years later, and other asbestos products banned at a later time." Gaskets and packing that contain asbestos are In the category of "other asbestos products" that would apparently be banned after ten years. No peer company that we are aware of has a target date for removal of existing asbestos-containing Insulation, gaskets, or packing; however, one major chemical company has recently discontinued the purchase of asbestos-containing gaskets and packing.
A cost analysis of pipe-size gaskets shows that GRAFOIL, probably the most expensive of the acceptable gasket substitute materials, Is, In fact, cost effective when the cost of mandatory work practices associated with the use of asbestos (e.g., wetting for removal or airborne fiber
(^"Asbestos-containing materials" Include but are not limited to Insulation, gaskets, packing, welding blankets, and construction products.
UCC 015811
DRAFT
2- -
9/29/86
exposure monitoring during removal, placing In labeled plastic bags after removal, landfill disposal, and record keeping) Is considered. The same conclusion Is drawn relative to valve packing when the additional considera tions of Improved service life and sealabl11ty are Included.
Consistent with the aforementioned commitments and the economic use of
materials, C&P has concluded that positive actions relative to asbestos-con taining materials^ should be taken.
RECOMMENDED C&P PROGRAM
*
Except as otherwise provided by applicable law. Chemicals and Plastics Business Group will:
Continue to phase out the use of asbestos-containing materials:
Asbestos-containing Insulation shall be replaced with asbestos-free materials as required to maintain structural and functional Integ rity.
No asbestos-containing materials shall be purchased after January 1, 1989.
C&P Standard Practices shall be employed for the Identification, removal, modification, and/or disposal of asbestos-containing mate rials; and for use of asbestos-substitute materials.
Evaluation of asbestos-substitute materials shall include considera tion of health effects as well as suitability for intended service and cost.
A variance approval procedure shall be employed to cover considera tion of uncommon circumstances. Approval must always include en dorsement of C&P HS&EA management.
SCOPE
This Recommended Program applies to all C&P operated/hosted facili ties. Other components of the Corporation will be apprised of its content.
DELEGATION
The assignment of duties and authority to carry out the Recommended C&P Program defined herein Is delegated as follows:
To Central Engineering Department
Develop and maintain C&P Standard Practices covering:
- Identification of asbestos-containing materials;
UCC 015812
DRA F T
9/29/86
-3
- Removal, modification and/or disposal of asbestos-containing mate rials; and
- Use of asbestos-substitute materials.
To Line Operations Management
Implement C&P Standard Practices for the identification, removal, modification, and disposal of asbestos-containing materials.
Implement C&P Standard Practices covering asbestos substitute mate rial applications, and communicate the service experience with these materials.
To Manufacturing Services
Monitor use of asbestos-substitute materials and communicate the service experience with these materials.
To C&PHS&EA
Audit compliance with governmental regulations and C&P Standard Practices relating to asbestos-containing materials and, where applicable, their substitutes.
UCC 015813