inter-offi?e memo TENNECO CHEMICALS, INC
To J. Sandstedt
AT Piscataway
F ROM R. F. Fanter
AT Flemington
Subject EPA Process Studies - Flemington
Date February 9, 1977
Copy to
D. Coldiron E. V. Schenke J. T. Sweeney
As per our discussion, I have reviewed the status of the EPA process studies at Flemington with the Manufacturing group and have come up with a schedule for completion of the plant trials required. The schedule is attached.
Please be reminded that certain dates are dependent upon the completion of plant trials. The plant trials now scheduled could be delayed if plant conditions change (such as extension of the XL program).
If the attached schedule is not agreeable, please let me know
so that we can either try and expedite certain plant trials, or go with -
less data than desired.
--
RFFrms
R. F. Fanter
COLORITE 018142
FLEMINGTON EPA PROCESS STUDIES
1) Stripper Dump Trials
a) Effect of vent gas b) Document pumping cycles c) Pump blockage problems (this would require
re-piping during summer shutdown)
March 10 Done
September 77
2) Waste Water Stripper a) Complete corrosion study
April 6
3) Development of Vessel Entry Procedure
a) This requires evaluation during the summer shutdown.
September 77
4) Water Spray - Reactor Opening
a) Complete Installation b) Sufficient data to support equivalency
request
March 1 June 15
R. F. Fanter 2/9/77