CertainTeed Corporation Pipe & Plastics Group P.O. Box 253 Sulphur, LA 70663 (318) 882-1441
(CCrtrj^if . uXI ^^<-6 6
iJf-prc< 1 X V + Y ^ 7
.`Trx`,
CertainTeed El
August 24, 1988
Mr. Chris Roberie Program Manager Air Quality Division Louisiana Department of Environmental P. 0. Box 44096 Baton Rouge, LA 70804-4096
Quality
Dear Mr. Roberie:
SUBJECT: SEMI-ANNUAL LESHAP PERFORMANCE MEETING - AUGUST 2, 1988
On November 30, 1987, in a letter to Gustave VonBodungen, CertainTeed
committed to two capital improvement projects designed to reduce the
number of hours out of compliance with the 10 PPM Vinyl Chloride
emission limit from CertainTeed's incinerators. For the first project,
approximately *40,000 was spent to increase the surge capacity of the
incinerator feed system.
The objective was to reduce variations in
flow, pressure, and concentration to the i ncinerators. This project was
completed during a plant turnaround in February, 1988. A second project
costing approximately
S100,000 involved
the replacement
of the
combustion chamber on the oldest incinerator.
This was done to
incorporate the manufacturer's newest burner and fume inlet design
features and was completed during a plant turnaround in February, 1988.
In a continuing effort
at improvement, CertainTeed has budgeted
approximately *100,000 for replacement of the combustion chamber of the
1979 incinerator. This will insure that both incinerators have the
latest combustion technology, and should mean that emissions of Vinyl
Chloride are well below the 10 PPM emission limit. This project is
scheduled for completion in January, 1989.
A review of the LESHAP violation incidents discussed meeting reveals three significant areas:
in the August 2
1) Timing of the Incidents
A11 six teen (16 above mentioned occurred in the and May.
incidents occurred before completion of the
projects in February, 1988.
No incidents
second quarter report covering March, April,
01-91 *0283
CTL000598
Mr. Chris Roberie Page 2 August 24, 1988
2) Quantity of Vinyl Chloride Released
Seven of the six teen incidents involved releases of less than
1.00 pounds each. The remaining releases were between 1.03 and
4.95 pounds each, This data is presented in Table I. None of
these incidents involved the
release of any significant
quantity of Vinyl Chloride.
3) Failure of the Continuous Emission Monitor
CertainTeed's Instrument/Electrical Technicians are capable of
performing routine maintenance and troubleshooting on the Areas
gas chromatograph used as the Continuous Emission Monitor. The
failure reported on the CEM was extremely unusual in that
several printed circuit boards failed simultaneously. This was
beyond the diagnostic capabilities of CertainTeed personnel so
a factory-trained serviceman was flown to Lake Charles to
perform the diagnostic and repair work. The unusual nature of
this falure could not be anticipated, and therefore; would not
be covered
during the preventative maintenance
that is
performed yearly on the CEM.
CertainTeed has responded positively to environmental challenges and in recognition of its environmental performance, has received Environmental Achievement Awards from the Vinyl Institute for 1986 and 1987.
In considering
proposed penalties relating to
LESHAP
discussed in our August 2, 1988, meeting, CertainTeed would
Department of Environmental Quality personnel considering
mentioned facts in our favor to assess the minimum applicable
violations appreciate the above penal ties.
Sincerely,
(V--^
Bruce J. Brocka
Technical Supervisor
-
cma
Attachment
CTL000599
TABLE 1 CERTAINTEED CORPORATION SUMMARY OF LESHAP INCIDENTS
DATE 09/30/87 10/22/87 11Z06/87
12/16/87 01/06/88 01/22/88 02/13/88
02/14/88 02/15/88 TOTAL HOURS 16
AVERAGE
16 12 30 17 29 28 24 12 38 61 33 87 37 106 102 41
VINYL CHLORIDE IN EXCESS OF ALLOWABLE EMISSION LIMITS
0.31 POUNDS 0. 10 1.03 0.36 0.98 0.93 0. 72 0. 10 1.45 2.63 1. 19 3.97 1.39 4.95 4. 75 1.60
26.48 POUNDS TOTAL
CTL000600
EXPRESS MAIL next day
[B 6 i' ' 8
Service Guarantee: Oomestic mailings under this service made at designated USPS facilities on or before a specified deposit time will be accepted for express shipment to a designated USPS delivery area having Express Marl service for next day delivery to an addressee or agent on or before the time specified by the USPS at mailing. USPS will refund upon application to originating office the postage for any shipments mailed under this service and not meeting the service standard except for those delayed by strike or work stoppage See chapter 2 of the Domestic Mail Manual for details.
Customer: Please tear off this stub and keep it for reference when depositing prepaid Express Mail Next Day Service shipments in Express Mail collection boxes or when giving prepaid Express Mail Next Day Serviceshipmentsto Postal Servicedelivery personnel. Affix the remaining label set to your shipment. For reference, write on this stub the date that the shipment was mailed (if deposited in an Express
Insurance Coverage: See section 294 of the Oomestic Mail Manual for exclusions of
Date Mailed:
Initials: Orno^
coverage. (1} Merchandise insurance. Merchandise is insured against loss, damage or rifling up to a maximum of $500. Indemnity will not be
Mail Collection Box, also initial the stub). Deadlines for deposit for next day delivery differ according to
paid for spoilage of perishable items.
the destination. To ensure nextday delivery consult
(2) Document Reconstruction Insurance. Non-negotiable
your local Express Mail Directory
documents are insured against loss, damage or rifling up to
i
$50,000 per piece subject to a limit of $500,000 per occurrence.
Postal Acceptance Employee:
Signature is required upon delivery. Claims for delay, loss,damage or rifling must be made within
90 days. Claim forms may be obtained at the post office of mailing. The Customer Receipt must be presented when a claim is filed.
After completing the "Origin" and "Acceptance" blocks on the mailing label, give this stub to the mailer along with the Customer Receipt copy.
Label fl-B (8-64)
CTL000601