Document zz1QqL0pED4XMqz5RymK7Zdm0

lonsanto^ W m*W 1W. H. Triplett - Tex .. City November 30, 1978 Hourly Safety Committee Meeting Tuesday, November 28, 1978 s1 FILE cc. SHAC Members A list of all old business that needs reply: V*i- U I K 11 Permit Violations - Lockout, entry, operator, chief operator, yjviSor checking prior to issuance of permit. super- Insulation Banding - Need a means to cover the sharp edges. .Vjj'V3) Ability to hear fire alarms and "all clear" around the plant. 4) The labeling of all storage tanks with contents and hazards involved with contents. New Business: 1) Is there a uniform policy on unit entry of trucks, rigs or other spark V\ generating devices: Do they need to have a fire permit or simply per- OaO'*^' ^ mission of the chief operator: xju, 2) Numerous amounts of lighting problems in storage area. Specific examples: a. 16T19-1 -"b. 45T502-1 ^c. 910. 32T1-1 ^d. 910. 33T1 (styrene tank) (methanol) (VAM) (naphthalene) f> The stated problems are the distribution supervision either can't get their own lights replaced or get unit supervision to replace the lights on their tanks. 3) A significant amount of"mud"was left from a CED sewer job in the styrene area that has turned into a hazard when riding bicycles. This condition has existed for over a year Sc needs resolution between CED Sc unit supervision. 4) Plantwide Safety Meetings - Neither Management nor the Safety Dept, is rT providing sufficient direction or leadership in seeing that individual safety * meetings get the message across. Too many foremen are left to flounder for themselves with short notice to prepare for meetings. ^ J, 1 ^ Wr-Hr-Ti iplfitt^ /ob SC 17147 LAM025399