Document zz0qMRB1zdYodr2YM3dgXyvVn
To: T. H. Huffman
Interoffice Communication
From: Date:
Subject:
D. C. Skokna June 15, 1989
ABERDEEN MONTHLY PROGRESS REPORT - MAY, 1989
There were two first aid and three OSHA recordable inj
reported in May.
The first aid injuries were to a Compound
Operator who bruised her foot when she dropped a wooden pallet, and
a Mechanic who bruised his knee when a part was dropped from a work
table. The OSHA recordable injuries were a Mechanic who pulled a
groin muscle when he stepped down from a reactor head to the
platform and two Mechanics who were burned on the backs of their
legs when splashed with chem wash.
As of May 31, 1989, the plant's employees have worked 3,618 days or 4,763,491 manhours since the last lost time injury.
Key Statistical Information
Mav
Y.T.D.
PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M
Costs
37.0 85.8 96.1 1.0121
4.2 93.7
4.2 100.0
1.5 86.1 < 4.0>
9.8 102.2
305.8 90.9 96.3
1.0080 51.3 95.3 41.1 99.7 13.9 91.6
< 4.0> <137.8>
967.1
Fixed costs were essentially at budget.
The primary causes of the favorable efficiency variance were better than budgeted VCM usage and product mix effects.
QMP
Fifty percent of the plant's natural teams met during the month.
The first class of SPC expert training was completed in May with twelve successful graduates.
VAB.0001190467
fl-r
"V
v, . . r-r.,
-I f?ni'
t
- > s J`-i
J ,** r n. * y -r-11.-MI
T. H. Huffman 06/15/89 Aberdeen Monthly Progress Report
Pace 2
- May,
1989
OMP - continued
An action plan was developed in
to the recent
Wire audit. The plan addresses items and
uViara the audit showed we should improve.
jpC
D. C. Skokna Plant Superintendent
rah
VAB.0001190468
DISTRIBUTION Houston
J. D. Burns R. T. Ferrell
COVER LETTER X X
ENTIRE REPORT
T. H. Huffman
X
C. J. Matson
X
D. F. Harman
X
H. R. Flammer
X
R. R. Smith
X
K. J. Eggers
X
R. H. Gerlach
X
R. D. Gamblin
X
Ponca Cltv
S. E. McGuire
X
R. L . Poe
X
H. J. Hall
X
Oklahoma Citv
H. G. Garrison
X
LCVCM Plant LCCP Plant
R. A. Conrad J. Friend
X X
LCLAB Plant
J. W. Ware
X
Baltimore
L R. Bauer
X
Hammond
J. B. Maher
X
Blane Premiere Aberdeen
C. R. Miller
P. L. Foote
RWS/DCS (File Copy), PJK, JEN, MRK, DAM, RBN SCH
X X
A
ri'^trLtt ir-i 'PfP= V1 'JF'j.'jJi.ie'i
VAB.0001190469
-- I O-l-iis.|-: fl-iiSl-IJSVitli.: JJ.i r^:. : U . .
f. bl .
H Jj '"|-f:-- :?
SAFETY - B. L. Trego, J. V. Uptain
Mav
Fiscal Y-T.D. 1989
Fiscal Y.T.D. 1988
First Aid OSHA Recordable
Total Injuries
Number of Restricted Workday Cases Number of Lost Workday Cases
0 0
2
0
0 0
Injuries bv Department
Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office
Totals
0 1 4 0 0 0 5
Injuries bv Type
Cuts and Abrasions Eye Injuries Burns Bruises Strains/Sprains Stings Other
Totals
0 0 2 2 1 0 0 5
4 0 3
2
0 0 _l
10
Non-Occupational Injuries
Lost Workday Cases Days Lost
0 0
Safety Record
Last lost time injury - 7/5/79
Days since -
3618
Employee hours since - 4,763,491
During the month of May, there were two first aid cases and three OSHA recordable cases. The first aid cases occurred when a Compound Operator bruised her foot as she dropped a wooden pallet, and a Mechanic received a bruise on his knee when a part was dropped from a work table.
The medical treat lent injuries
a Mechanic who pulled a groin muscle
while stepping down from a reactor head to the platform, and two Mechanics
who received caustic bums to the backs of their legs when splashed with
chem wash.
VAB.0001190470
SAFETY - Continued
A
On May 31, 1989, the employees of the Aberdeen Plant completed 3618 days with no lost time injury.
Topics for the plant safety meetings during the month included Review of Recent Injuries, Material Safety Data Sheets, Hazardous Materials Handling, and Review of Safe Work Sampling Results.
Routine dosimetry results for the month were
Chemical
VCM Lead Total Particulates
<- PEL Number
77 100.0 13 100.0
1 100.0
> PEL Number
0 0.0 0 0.0
0 0.0
Monthlv Iniurv Suramarv
Iniurv Class
DeDartment
FA Compound
FA Maintenance
MT Maintenance
MT Maintenance
MT Maintenance
Description
Contusion of left foot.
Contusion of right knee.
Strain of left side of groin.
Caustic burns of both legs below knees.
Caustic burns of both legs and right hip.
'r
!:rntTfi.,pnr..`jt
" 'T -
**f' - 5"^ : ?i--nf
.................
VAB.0001190471
:--e* M!' #*!
:mins-
'-ri
1 : h: IV v.-p:n -V
ii-y r-. ; . ,{
'
d :
't .Li i- j -**+-'1. I:x*
S' |-!
c-i i
QUALITY DEVELOPMENT
General
The first class of SPC expert training was completed in May. Twelve employees committed their time and effort toward improving their knowledge of SPC techniques. The second class of SPC expert training is scheduled to begin in mid-July.
A corrective action plan was developed in response to the recent Prestolite Wire audit. The plan addresses items and areas where the audit showed we were deficient. The plan is in final review and will be sent to Prestolite in mid-June.
A meeting was held with those who had been trained as team facilitators (eleven total) to determine what resources were needed in order to provide consistent facilitation to teams. An action plan is being developed.
M. R. Kane attended the annual American Society of Quality Control Congress.
Six natural teams made progress toward developing mission statements this month.
Vinvl Department
The Vinyl Superintendent's Natural Team met once during the month. The meeting agenda included a review of each of the active employee activities during the month, progress on customer visit, exchange plans, brainstorming ideas for a mission statement, and continued work on key performance area identification and updated capability calculation.
There are three active employee teams in the department. Each team met at least once during May, 1989.
Process Engineering Department
The Chief Process Engineer's Natural Team met in May to discuss status and timing of projects. Both Senior Process Engineers' Natural Teams met in May to work on projects.
Several process engineers participated in a team facilitator follow-up meeting to discuss the progress on facilitation of plant natural and project teams.
Shoo Utilization Team
The Shop Utilization Team met in May to review the two plans the separate groups came up with. The team is requesting preliminary cost estimates for each plan so they can decide which plan is more attractive with respect to space availability and costs. The team will schedule another meeting as soon as the estimates are available.
VAB.0001190472
QUALITY - Continued
Plant Manager
The Plant Manager's Natural Tea met once this month. The purpose of this was to review the progress on the major feedback items from the
first series of QMP Managers Meetings.
A
r fa: li .. iiirr.-
ij...............................................!$*[**.
I "** TMTT
n.|
tfia
I IP*
ttlirj iMtj-Xf tfitt <&=*
T'-
VAB.0001190473
,T. . .....................-ithS'-'l* Kit'- .1 1 A- -
.
il-T-1" I
r--- - y -fr
-h -* ' ."Hr
COST VARIANCES - D. C. Skokna
Variable Costs
Product
PVC Flexible Compound Rigid Compound Plasticizer
Mav. 1989 Variance. $M
Efficiency
Pyice
Total
$ 56.1
(10.0)
49.8
6.3
$102.2
$ 726.4 152.0 195.1 30.6
$1104.1
$ 782.5 142.0 244.9 36.9
$1206.3
PVC - VCM use was below budget and the variance attributed to product mix was favorable.
Flexible Compound - The variance was essentially at budget.
Ripid Compound - The month's favorable variance is primarily due to product mix.
Plasticizer - The variance was essentially at budget.
Price Variances
VCM Resin to Compound Alfol* 610 610P to Flexible Compound Pthallic Anhydride Other Price Variances
Total
Fixed Cost Variances
- Payrolland Benefits - MM&C - Miscellaneous - TI&D - Clearances
Total
$749.4 299.2 40.6 16.7 (22.7) 20.9
$1104.1
$M
($63.9) 59.7 27.3
( 11.6) ( 1.7) $ 9.8
VAB.0001190474
COST VARIANCES - Continued
Payroll and Benefits - was above budget due to the holiday and benefits being above budget.
M. M. & C. - was below budget due to low contractor activity.
Miscellaneous:
- Outside Professional services - T&E - Moving/Home Assistance
$16.OM ($12.8M)
$20.4M
A
-t>r 1 -.1-
h!?i
ft;^gha5milWilil>pmUMHrT1
i^.-H
wu-pi^am-d-bait 1 - i- - r
VAB.0001190475
't
j.'Mia
tj{.
.1
JiJ'-iI
tUnL . . M-lriL^L
______________ AND MECHANICAL DEPARTMENTS - P. J. Kober, D. A. Miller J. E. Nickerson
Mechanical Safet
There were three medical treatment cases and two first aid cases in the Operations/Mechanical Departments this month. The first aid injuries involved a Mechanic who received a bruise on his knee when a part was dropped from a work table, and a Compound Operator who bruised her foot handling a wooden skid.
One medical treatment case occurred when a mechanic stepped off a reactor head down into the platform (about a two foot step) and strained a groin muscle. The other two medical treatment cases involved a Mechanic and an Instrument Tech who were sprayed with chem wash rinse water solution and received minor first and second degree chemical and thermal burns to the legs. The investigation of this accident is in progress and will be complete in June.
The monthly safety meeting covered safe handling of hazardous chemicals. The meetings included a film covering general topics and discussion on specific hazardous chemical concerns for the various departments and areas in the plant.
VINYL - P. J. Kober, C. J. McDonald
General
Production was limited due to inventory control measures and VCM availability. When possible, downtime was used for maintenance
2. A new 5415 dryer cleaning program was instituted in response to a customer problem. 5415 dryers are now cleaned every three days.
The resin raw materials in the 744 account were valued at $374.9M.
Mav
YTD
- Production, MM Lbs. - Daily Rate, M Lbs./C.D. - Total Reactor Charges - Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor(#4-#8), % - Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime
37.0 1194
875 28.2 85.8 59.7 97.8 96.1
305.8 1258 7217
29.7 90.9 74.6 96.3 96.3
Reactor Downtime
Hours
Operational downtime (recovery scheduling conflicts, rinsing chem wash tanks, new module rinse/charge water conflicts, waiting on QC data before charging, no place to dump, and inclement weather).
198.3
Maintenance downtime (hydroblast D744 and D745 reactor shells and condensers, repair D400 agitator seal, repair D741 and D742 agitator gearboxes, repair new unit reactor evacuation steam jets, replace D743 condenser gasket, change screens in old unit dump screener, D744 agitator motor repairs, and miscellaneous instrument and valve repairs).
279.0
Other downtime (reactors were idled to reduce finished product inventories and because of VCM availability).
581.1
A
r -:l
r - If- IiVI-M
irifft * i H rpl1 --
. J"-t ll!
-i it
in n.: .s.e.r- -Trf-F-f-"i hhk i:*k
!. * -s-
VAB.0001190477
T
'i;: : .--1" '
. : 'll-
:.-i -I >!.
11..! +
1-1-J.n-h
t
VINYL - continued
Reactor Downtime - continued
Dryer Downtime
Reactor limited production
Operational downtime (centrifuge plugs, clean dryers, activator transfer problems, checking dust collector socks, pulsing socks, check screener rings, and flameouts.
Maintenance downtime (change #8 dust collector socks, #6 tumbler switch, #6 feed valve, and various activator and centrifuge repairs).
$ Of Total Downtime 84.1 9.5
6.4
Kev Maintenance Work - J. B. Autrey, J. B. Hegwood
Reactor Area
Reactor 400 was shut down for a seal change during the month. This seal was changed due to an excessive oil leak which was caused by a throttle bushing that had worn out. This seal had been in service for twenty-six months.
Number 7 Bird centrifuge was shut down dt developed during normal operation. While down, the seals, thrust bearings and bush
The old reactor unit chem wash pump was shut down for a complete overhaul during the month. The bearings, shaft, seals and the pump fluid end were replaced.
Reactor 300 was shut down for repairs to its gearbox during the month. The gearbox input shaft seal had failed because of a problem with the fluid coupling. The seal was replaced and a spare fluid coupling was installed. The old fluid coupling will be rebuilt and used as a spare.
Reactor 744 was shut down for hydroblasting during the month. The reactor shell was hydrobias ted and the condenser drilled.
Number 6 Bird centrifuge was shut down because of a bushing failure. The bushings were replaced and the centrifuge was put back in service.
VAB.0001190478
I I .1
VINYL - continued
Kev Maintenance Work - continued
Reactor 742 was shut down and the gearbox was removed because of an oil leak that had developed in the case. The leak was repaired and the gearbox was reinstalled.
Reactor 741 was shut down and the gearbox was removed because of two seal failures. The oil seal and the input shaft seal had failed. The seals were replaced and the gearbox was reinstalled.
Reactor 743 was shut down because of a gasket failure on the bottom of the reactor condenser. The condenser was lifted and the gasket was changed from a Monel jacketed gasket to a Flexitallic spiral wound gasket. The Flexitallic spiral wound gasket has proven to be very reliable.
Training on the new maintenance hydraulic torque wrench was completed during the month. This torque wrench is being used as part of the reactor bolted joint program to help improve reactor bolted joint integrity.
Reactor 744 agitator breaker was replaced during the month. The breaker would not reset after being shut off. There was no apparent reason for this failure.
There were six major valves changed out in the reactor area during the month.
A
............-n inr ic' i i v| w? -*i- - I1
ivi:!hu........flf-wmfcttttr:';'
i MKi'ikj+irlsn i p+. -m-
VAB.0001190479
! -
<i. if?"-I -:P. . .
i:
> l- H-
-J--M. r - r*il-H-t>
COMPOUND - J. E. Nickerson, J. B. Autrey
General
The three compound lines, dry blend, and plasticizer experienced scheduled downtime in May due to the demolition of the old compound cooling water tower. During this outage, the new condenser for plasticizer reactor R-2 was installed.
Contamination was encountered on several products using altu inum
trihydrate (Aluchem AC-712K).
The lab confirmed that the
contamination was due to this raw material, Approximately 250M
pounds of flexible compound were off-graded due to this
contamination.
Operating
Comoound Production
Days
Month Avz./Dav Fiscal Y.T.D
Line I Line III Line V
Total
27.5 19
5
1830 2057
265 4152
67 108
53
16423 27282
7616 51321
Downtime
Uns-X
- Product Changes - Dicer Problems & Maintenance - Transfer Problems & Limitations - Miscellaneous Maintenance - Quality Problems & Control
Line III
- FCM Gearbox Maintenance - Product Changes - Dicer Problems & Maintenance - Hydro therm Maintenance - Quality Problems & Control - Miscellaneous Maintenance
Line V
- Product Changes
Hours
93 25 16
12
11
36 34 12 12
7 6
14
4-
VAB.0001190480
M i- =
COMPOUND - continued
Operating Davs
Month
Production (M Lbs.)
Avg./Dav
Fiscal Y.T.D.
Rigid Compound
23
4245
185
41129
Downtime
Hours
- Product Changes - Welex Problems & Maintenance - Screener Problems & Maintenance - Quality Problems & Control - Transfer Problems & Limitations - Miscellaneous Maintenance
42 29 28 12 12
9
Operating Davs
Month
Production (M Lbs.)
Avg./Dav
Fiscal Y.T.D.
Plasticizer
27 1475
55
13850
A
Kev Maintenance Work - J. B. Autrey, J. B. Hegwood
The Line III FCM was shut down due to a gear failure during the month. The gearbox and the adjoining rotors were replaced with a spare. The gears were removed from the old rotor shafts and were sent to Houston for analysis. The cause of the failure has not yet been determined.
The Line III mill was shut down for repairs to its rotary joints, which supply steam into the mill, on two different occasions during the month. The rotary joints were changed out and the mill was put back in
The number one dry blend Welex was shut down during the month due to a seal failure during which time the seal and the bearings were replaced.
The Compound and Plasticizer units were shut down for four days so that the north compound cooling tower could be demolished. The tower had been condemned and was scheduled for demolition. Also during this time, several maintenance items were taken care of in each unit.
The south dry blend "Gump" screener was shut down and
the
moved for repairs. A spare gearbox
was installed and the screener was put back in service
The old gearbox will be rebuilt and kept for a spare
II- : I K 1.- 1. :v:. I I 1 i : n i <i
Ip
-i . - J
i. $]- |. fj|:-1_
H-'ir ri *
. -I
--I' - *i<l ' I - ''.I
........................
it 'FfcfllWirrt*!' i ' i"1
r'Trlit'T'iiTssr =
:icw n:n:/? n i 'i
VAB.0001190481
--'V i
r,
i
... |
Utilities - J. B. Autrey, J. B. Hegwood The plant was switched from number one boiler to number two boiler for three days so that several steam leaks could be repaired on number two boiler. The number three water well was shut down during the month because of debris that was surfacing in the water system. The well and casing were cleaned and the pump was returned to service.
VAB.0001190482
ENGINEERING - R. E. Polk, S. C. Hillman, V. L. Thornhill
PROJECTS IN DEVELOPMENT - GENERAL
Vinvl Control System Modernization
Taylor Instruments has been selected to supply the control system for the project. Information is being gathered to prepare project economics and the final cost estimate.
Plant Water System Revisions
Visits were made to municipal sites using each of the water treating systems under evaluation. Work on class nAn design is underway. The initial draft will be issued early in July.
IPSM Classes at Aberdeen
Several process engineers attended IPSM training held at the Best Western in Aberdeen.
Business Area Information Meeting
Lucted an informational i eeting on 5/25/89 about the Business Area for the plant engineers. The meeting focused on Business Area job functions and opportunities.
A
u-1:. M n hump i
. r. >-T' I
.... -.nv^jr ..*
VAB.0001190483
H
11 : J EjI$t:
IS` >T' "
Ah v1.p---rf
F!r-!' !i :V wn.wv ' rrva. .; n
H+l * ................
* pto ha *
3
a
S3 a
s
a 3
53
a&
3
a
3 3
S3 . aa|s
s5
aa
aa
nets
ss w
as^322 #--
S3 53 ~
~a
EB
a
SS8
a
S
3 88S
B*5
a CS3
ssl 2i
S 9
a 5
B
a
*
5s
s
oa co
a 3
3 a a
2
aasia* * * *
33222
a M MS
aSli!e aa
a
A CK3
a as
o o a g 2S
s & as S> 5g pij
!uHM-Mi-mitanwwmomaHui-aiii-oiib-io><-a<a SBB
a
ss
33 3
MNE8 IRNG R.g. POL ,E S.C. IHLLHA ,R V.l. THORN IHLL
VAB.0001190484
' It ilfr=r.i' rrii
1: 1
3 era
*
r-- '! I :i5 - h1: : :!" :v: 1
|: -
TiL : v 'In -+fl--hL i >:H > i ;
4I-+P1-*`I'1*--
Nifs 1
vs ! .-jfc-1-s-r.-r:! f-jrnr.'y:<-r-dr-H!*^*1jjf
VAB.0001190485
4 -1kMShU Hiw^|tep*Misqv^--i ' l-h--r-- *- 1- i r .1<
- .1- T !+;
.'Jlr .; =sr.:. !. tv.n u Ii^lruv:.| :|.. <
J I*. k>,
<-::*- -i
ENVIRONMENTAL - F. G. Jeanson
Water
All wastewater discharge parameters were within NPDES limits for the month of May. Second quarter sampling of the pond #6 Outfall for priority pollutants indicated no VCM detected and 38 ppb di-n-octyl phthalate.
Superfund
Results from samples taken by EPA in February have still not been received. Vendors have been contacted about resampling the three groundwater monitoring wells at the plant. Two quotes have been received. Work is expected to be done in July.
Air
A letter discussing our centrate water recycle project and the resulting VCM emissions from the cooling towers was sent to the State. Verbal approval from the State was received. Written approval was requested and should be received in June.
Waste/Offgrade Manaeeme
May waste shipments included One bulk load of separator oil to Stauffer Chemical
One bulk load of lead bags to Chemical Waste Management.
Stauffer Chemical notified the plant that effective July 1 all separator oil
shipments will have a fee of $2.52/100-pounds. Previously, we only paid for
shipping.
I evaluated alternatives to Stauffer and found Systech in
Demopolis, Alabama. I am working to get separator oil approved at Systech.
May offgrade shipments included: One load of reactor culls in super-sacs to Sun Polymers.
Core samples were taken off pond #2 and submitted to Mississippi State University's labs for priority pollutant analysis.
A list of all plant wastes was compiled for plant management.
VAB.0001190486
.......
ENERGY CONSERVATION - D. A. Moore
Mav. 1989
I. Energy Conservation Data
A. Unadjusted EUI B. Adjusted EUI C. BTU/Lb. Product D. Total Energy Consumption MMM BTU
-4.05% -5.23% 2603.00% 122.12
This corresponds to an adjusted CMA of and an unadjusted CMA of
50.73% 39.00%
Fiscal Y-T.D-
-4.03% -4.87% 2542.94 1047.53
51.26% 39.78%
II. Plant Energy Conservation Program
A. Maintenance
There were fifty-seven energy related items completed in May, 1989. Fifty-two of these items were steam leak repairs. The remaining five were steam trap repairs.
Ill. Boiler Operation
Boiler
Combustion Efficiency % May. 89 Fiscal Y.T.D.
No. 1 No. 2 No. 3
82.97%<n 83.34% 83.14%
83.59% 83.46% 83.16%
(1) Boiler #1 operated two days during the month.
'r' ^
. ait*, -- ! I? \ . . Jt= sf*1! i-'i:
l; " lif*- f
ild*"
1
1 .ill . %'lvg ii-Lfrj
lfc>,
If- S' V.-rrY-m/'l*
VAB.0001190487
1lK-s,i,:! ^ !<*
; .-j.-!-.j .-d.. vi -
rtiTr-TSTi-'it-ri .:e vq.
HOMAN RESOURCE REPORT
MAY, 1989
Personnel - J. E. Beall Empl nvment Brian Aftergut, Rehire, Co-Op Engineer Matthew Smith, New Hire, Summer Engineer
None Retirements None
Thomas E. Bales, Yard "A" Operator, Deceased To/From Leave of Absence None
VAB.0001190488
A
ABERDEEN. MISSISSIPPI
Salaried Employees Hourly Employees Total Employees
MAY, 1989 MONTHLY PERSONNEL REPORT
78* Minority Employees #, %
111
Salaried
7
9%
253
Hourly
67 38%
Total
74 29%
New Employees
0
Hourly Min. Hired
0
Terminations
0
% Min. Hired
0
Hourly Min. Term. % Min. Term.
Q.
0
DEPARTMENTS PAR #EMPLOYEES MIN. EMP. %MIN. NEW HIRES YTD TERM. YTD. TURNOVER YTD.
Warehouse
16
Gen. Plant -11
Maintenance 41
Laboratory 24
Compound
40
Vinyl
33
Plasticizer 5
15 17 39 24 42 33
5
7 42 a 0 0 0 0 n
6 0. 7 0 0 0
10
oo
o
5a
o. afl
27
00
00
10 a (2 o 0 0 a
2
Q. 0 0
0n
Number of Applicants:
Month
0
Year To Date 21
APPLICANT BREAKDOWN:
# Minority
0
% Minority 0
# Female
0
% Female
0
Hires (Hourly):
Month 0
Year To Date
7
Terminations (Hourly):
Month 1
Year To Date
1
Overall Turnover . 6%
Projected Annual Turnover
1.4%
* Includes 1 Co-op Engineer and 1 Summer Engineer.
VAB.0001190489
-- ,*T.'
V" !
y - 1
" IMFf:'*-
- m -r
euttrtht
- 1 i^W***V*\*$WVW+*"im*W'*r~***'*'TM'-
^ C----!r -
-sT -
.
It-.:.-- .. I -S
I i - r '..t* '!> I tW-' :
f-f dl * t/'->'!*
s1 H
>
vO <r
m
o o
on
CM
m o
m CM
-*
lO t
pH
o
GO
<T CO
CM
to o
CM
oa Cl
GO cn CM
mO
ON
U*
41
(A o
H
CM
4
rH
o o
o
rH
m CM i-M
<r
*
oo
*
o m
r**
ON *
O
43L*
H
m*
o o
ON \0
mO m GO
>T
mo ON o
r''-
<r m
41
to o
H
a)
u c a* c
o
o o
O'! cn
oo
CM <r
oO
o w
oo
O O
m
x* u
< cn
pH
CO H CM
QQ
U 3
O
4 41 QQ CO V
CM
O
CM
nO m
vO
m ao
cn
CM
ao
sO
*
w c *o 3Q e 41 o to *H u 4*1 41 to a MQ
CL C o
c> to *o
>*
to 41
4* '0 M
Ac
o>
ji
00
eu
3 0 u
o
3 Li <0
c
a
oo
u
Li
at
nB
C
mH
L
to x0Gt
CM O
*
CM m
ON
o NO VO
a
CM *
CM o CM
*
CM
*
CM -M
* u
CM M0 ao GO CM 3 CM G*HO cn 00
41
l> co
o *
c oC
a
Li 3
t>o
O
r
CO
$
Li
*3 CO
bJ
H3 2 00 LaJ 0) c CO Li o
00
a CM
u
3
O
tt Li
O
hJ * Li
X
HOfi
Ul
pH <"M *43J Mo 41
t
i
i oOooo
i
o
a
o
*
oa
o
a
o
a
i
io lo i
io io i i
CO
O
41 3
00
41 3
U4>
Li e oo
i QO o CM CM GO
i <r CM vO
O
i i CM
i i
cn
HO 00
2u CO ci Li o
t i i
CM i \ i
i i \
4) c E 41 u
3X
Uo
O X 0 H
4)
.
> O 4o1
aX 41 pH M
lO r^.
Om
o o
o in
om
o O
om
m
CM
o m
Om
00 c 4J
3 13
V co
3
> pH oH
u0
GO
CM
ON
CM
CM
o 00 <T
d cn cn
d o
CM
<n m nC
m m vH
ON OrH
cn cn
ON
CM CM
CM
V
U X V
*aH 41
41
e 4>
o u
a> *4 o
Va m H^
u
41 O
3a 00 ^ CO
aw Li 3 41 O CO X
o m
O o
m |V
oo mo
m CM
oo oo
mm CM CM
aa aa a a
rH O CM ON fS ON vO CM
CM
CM GO o m (S
CM m cn X
<r NO
m cn r-* o o
r-H xO 00 r-*
CM
cn
W
4>
>
o
*3
E l
41
a Li V > 41 O Li 4 J0J > o o
3
4>
CD
Wu
CO
c U4 hO
EU 2
<0 00 >- < <*4 u
ad jj
ofi < {Jj O
CM =o CL
o
t-M
HCO
3
H O
U1
<% 2 %
3
o <Q L
c O0 uo
1 c o u
-- n
w o
t .*,
VAB.0001190490
A
There were no safety instances this month. Concluded review of dock area portable safety barriers will be used to alert employees during truck loadings.
Cost Savings
Savings due to competitive bidding were $9775 for the month, and $82,784 for FY1989.
Savings due to prompt payment discounts were $2347 for the $15,494 for FY1989.
onth, and
Warehouse - Finished Goods Inventory
Concerns with overcrowding in the finished in May with a 1,108M inventory reduction. However, slow moving and offgrade inventories are still excessive. May inventories were as follows:
Total
Slow Moving
Offgrade
Flexible Compound
4,780,727
970,624
474,637
Rigid Compound
601,189
230,406
99,377
Resin
852.764
N/A
211.764
Total
6,234,680
1,201,030
785,778
Training
Jack Little attended "IPSM" May 17-18, 1989, at the Aberdeen Best Western.
Meetings
Jack Little was in Boston May 22-23, 1989, to review computer software in conjunction with "Oasis". (Marcam and Software 2000).
i
............. :
!< i1 . :
7h . - a,
VAB.0001190491
W -S :^ --h F=-!,+J-4-i - :i-=.i-1
;.`T .. . t
,J"'C V iKf'-J-il::
n ; r 4- rr>^p! ij Tt i * i < T1W
ABERDEEN CHEMICAL PLANT SHIPPING ANALYSIS NAY 1909
-SHIPHENTS BY PRODUCTS-
PUBLIC
MONTH IPT/ITC
EXCHANGE
RESIN-BULK RESIN-PACKAGED
20,359,880 10,873,609
417,500
47,450
YTD
PUBLIC
IPT/ITC
EXCHAN6E
140,490,150 92,761,929
4,012,100
366,450
. k"4A4i.j,-
FLEXIBLE COMPOUND-BULK
1,688,130
FLEXIBLE CQNP0UND-PACKA6ED 3,177,835
1,033,250 32,193
12,218,560 10,076,390
30,878,209
841,146
RIGID COMPOUND-BULK RIGID COMPOUND-PACKAGED
3,815,250 420,867
0 985,871
30,705,450 4,518,648
3,867,950 995,171
PLASTICIZER
169,600
0 555,150
1,483,520
864,850 2,563,900
TOTAL
30,049,062 12,972,373 555,150
224,306,637 109,773,886 2,563,900
-SHIPHENTS BY MODE-
BULK:
IMAYI RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER
TOTAL MAY
RAILCAR
141 15 19 3
178
VISTA
CUSTOMER COMMON PICKUP CARRIER
41 90 4 2 00 12 1 0 0 04
55 91 8
TOTAL
276 17 32 7
332
IYTDI RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER
1,049 119 182 19
352 671 17 25 0 3 54 27 4 15 0 20
2,089 147 267 54
TOTAL YTD
PACKA6E0:
IMAYI RESIN FLEXIBLE COMPOUND RIGID COMPOUND PLASTICIZER
1,369
VISTA
4 36 19
446 698
CUSTOMER PICKUP
COMMON CARRIER
40 29 26
1 15
44 TQFC CONTAINER
1
AIR/UPS
11 3
2,557
TOTAL
27 94 36 0
TOTAL MAY
59 34 49 0
1 14 157
IYTDI RESIN FLEXIBLE COMPOUND ru*u**ii/i uAunnurnunuiunmu PLASTICIZER
TOTAL YTD
35 37 77 297 237 336
371 /
00 7
0 03
398
281 509
0
22 171 2 8 880
i
i 167 3
3 30
1190492
LABORATORY - H. G. Coleman
A. Safety - There were no
incidents in the Lab this month. The
monthly safety meeting, conducted by Richard Williams, was an
excellent program taped from the Disney Channel on home
including fire s
emergencies, safety inspections and
safeguarding your home.
B. Customer Relations
Customer Contacts
There were no customer contacts this month by Laboratory personnel
C. Product Waivers Customer
Product
Reason
No.
Avg. particle size (158 y) 1 HT
D. RVCM Summary
RVCM of In-Process Samples
The following is a summary of residual VCM results on process samples. None of the reactor daily averages exceeded 400 ppm RVCM during the month of May, 1989.
Number of Samples Average RVCM, ppm
RVCM of Shipment Samples
Reactor Slurries
872 162
Drier
5265
5305
23 0.705
57 0.494
The following is a summary of the residual VCM analysis of shipment samples for the month of May, 1989.
Product
5265 5305 5385 5395 5415 5465 Dry Blend Debox Pond
Number of Sanmles
60 87 42
8 61
0 24 20
6
Averaee RVCM. oom
0.192 0.189 0.185 0.059 0.031
--
*
0.053 0.225 0.326
*
.r .'.r!.-!> -Liifr-,'-Lj -j-h h
VAB.0001190493
|< Jlj K
: *rhi rrTlITf
-IJ li
|
^-1--F''r FL^TlM-tv
-rr+iM mti r i
01 .M-rfrfii; .
LABORATORY - Continued
Resin Process Capabilities (based on dryer "regulars")
5265
5305
5385
5395
Bulk Density Inherent Viscosity
(vs. 0.715 - 0.744)
L Color A Color B Color % on Pan
(vs. 2%, max.) % thru 140 Mesh Drytime Mets I.R.
(vs. 95% of control) Hard Particles, (% > 10)
0.48 0.70
--
7.33 1.11 4.67 1.43
--
0.79
--
---------- ----
--------------
--
0.62 0.88 0.46 4.33 7.33 1.67 3.00 ----
1.64 - -----------------
2.36 0.63
--
12.33
--
2.33 2.75 ----- -2.47 1.00
--
--
12.3
0.95 1.67
--
13.33
--
6.00 0.56
--
0.30 1.33 3.71
--
0.0
5415
0.58 0.96
--
6.33
--
2.83 3.89 0.56 2.79 2.67 4.25 2.48 1.0
Average particle size, microns
138
149 164 152 170
F. Compound Quality Summary
Adjustments M Lbs. XU
Rejections M Lbs. XU
Color/Clarity Hard Particles Contamination Dicing
-- -- --
Total
-- -- -- -----
25.3 82.7 52.9
5.3 166.2
(0.60) (1.97) (1.26) (0.13) (3.96)
G. Drv Blend Quality Summary
Rejections M Lbs. (%)
40 Mesh Retention
3_JL Total 3.9
(0,09) (0.09)
H. Compound SPC Test Results
nX 3
38401 - Hardness - Specific Gravity - Hard Particles
41 41 48
83.80 1.373
21.10
1.04 0.014 3.93
35031 - Hardness - Specific Gravity - Hard Particles
44 44 46
49.80 1.378 5.48
0.85
--
3.53
Mill Temperature, F Oven Temperature, C
44 324.9 All Readings
1.04 204C.
VAB.0001190494
LABORATORY - Continued
I. 5415 Control Resin Test Results
n
Moisture Dry time Particle Size - 60 mesh
- 80 mesh - 100 mesh - 120 mesh - 140 mesh - 200 mesh Pan Bulk Density Color - L A B Flow Time, sec. Hard Particles, 7 min. Inherent Viscosity
61 30 62 62 62 62 62 62 58 30 62 61 59 31 62 30
0.172 4.89 1.54 32.64 33.56 18.08 7.58 5.16 1.40 0.500 100.36 -0.01 1.84 7.70 6.18
1.0127
3a
0.33 0.33 0.52 2.81 1.11 1.57 0.97 1.17 0.50 0.006 0.45 0.22 0.38 0.46 3.00
0.078
J. Miscellaneous
1. Anne Chepolis (TSR) was given some training in the Lab about methods and procedures on May 26.
2. H. G. Coleman attended IPSM on May 17-18.
A tape drive was installed in the compound/dry blend Q.C. computer for backup data storage.
4. The Lab ordered a new Brabender torque rheometer to replace our old Haake unit.
A
. -h-.. .
. ^ ... . . ,
J r *'
irf'l tl'HrW.ti'J iA*":
|
J|
,l.r I-U-p.-
h h. ^p!
L' piHvi
fftj-n
>: iMSlf.jir
Ijf
VAB.0001190495
; i : m ..fc r .. i
|- id I:. | -
' :--'rta- . 7r'i:s -i' ir:v:p-"h:.
r. .j
RESIN Ship Date
SAMPLE SHIPMENTS
MAY 1989
Product
Amount
Customer
5/01/89 5/03/89 5/03/89 5/03/89 5/05/89 5/12/89
5/18/89 5/18/89 5/19/89 5/23/89 5/25/89
COMPOUND Ship Date
5265 5385 5305 5305 5305 5265 5305 5415 5385 5415 5415 5385 5395
Product
50 lbs. 50 lbs. 100 lbs. 50 lbs. 50 lbs. 50 lbs. 50 lbs. 100 lbs. 150 lbs. 250 lbs. 50 lbs. 250 lbs. 250 lbs.
Huls American, Inc. AL-KASWA ASSOCIATES DUPONT OF CANADA Hoechst Celanese Klockner-Pentaplast Morton Thiokol
C. ITOH AND CO. CARGILE SONATRACH CABEL CORP. OF INDIA LTD. Applied Plastics
Amount
Customer
5/01/89 5/05/89 5/07/89
5/18/89 5/24/89 5/31/89 5/31/89 DRY BLEND Ship Date
MSP Pellets 38525 BLK 38841 NAT 419-33D BLK 376FR NAT 18961 NAT 38931 WHT MSP-90 MSP-90
Product
5 lbs.
1500 lbs
300 lbs. 300 lbs. 300 lbs.
50 lbs.
5 lbs.
50 lbs.
100 lbs.
Ron Walker Times Fiber Northern Electric
Florida Central Extrusion Tie Down Engineering Tackett Plastics Inc. Flex-Rite
Amount
Customer
5/16/89 5/24/89
80273G WHT 110
25 lbs.
378-143 BLUE 170 Purge
30 lbs.
Finance Int'l Trade & Service Ltd.
Silverline Building Products
VAB.0001190496
A
ABERDEEN CHEMICAL PLANT INJURIES
(Twelve Month Running Totals) 40
30
20
IS
TO
0
J'87 FMAMJJASOND J'BB FMAMJJASOND J*89 F M A M
TOTAL INJURIES
O OSHA RECORDABLE
NUMBER OF INJURIES
' ,Ji
.........| I "r.t llr'".:S !-'M 'S.
- ^
. i-- -u'
r
T -
VAB.0001190497
A*J*
I^
43 n;
i-rf-*-A. ' i
W'l'Mtf | 1 '* J
tf-W |- If*
[jJM F'. 7 - ?!'
li-i . la:.-'
*
jj .p . i.^.. . . : s . I i : i
!! |iarT .
r
'! *1 * r '
'
ABERDEEN ENERGY CONSUMPTION
BTU/LB
an/ms
MONTH
....-- 12 MONTH AVERAGE-
4 j
Ol 00 o:
<cl
oo oo
on
<CL
oo
oo
roo
aa<.:
VAB.0001190498
.V..K i I