WHAT IS BEST WAY TO MOVE AN 85-FT SMOKE STACK?
--O''"*
FovfldetUn -- 30 ton*
A fown kncinikd run* lulo oil kinds neiir the t<>|i of the flock to netrbjr bdildm
of Job* Ihoi are eft ih beoien po'h. For log*. We then plan to fatten thetberMta . Instance, something we never mel Bp with of guy line* from obout mtdwty otMijjfl
before.I* moving a tmake.ttaek distance tack to adjoining building*. We thmVg
of iis feet. Here ore the detoilt:
next lieil step it to undermine fouedttitSM
We plan lo ineinlt a new boiler, mid in end* ond place II besmt under each eujn|
do to we hove lo move an 85-fl Heel From beuttt.endt we plan on ththt tlinjM
moke (lack loierolty o diitanee of lit to another parallel aet of H beams, plsetdl
feel. A* ihown in ihc iketch to the ait roilert above. We may bav lo ba)7dj|
left, lbe Meek bee e halt diameter of 71 a supporting concrete bete on either ibh
Iru, and weight apprnximotoly 7 tom. An of the fomuialioii for the roller crMt
octagonal brick bote, which hoi an B-fl ' From thot'klct on the top H beam'i
diagonal, surrounds the lower pari of the n system of pulleys eoald be rigged, iron
tack. W etlimuie lhat the weigbl of title lack, bate und foundation moved uisjS
bate ia SO ton*.
complete tmii. ft will be iteeesuryJlajg
The Meek ami bate are tupporled on a relocate the roilert placed under them
)0x)0x4>ft concrete foundation that weigh* beam at the unit it moved.
.'vl
approximately 30 tom. The foundation
All this, sounds good, hut tines wo htvri
arface ii level with Iho tarroonding never Itendled tueb a moving job wa trtv
ground- We are hoping lo movo the Hack, iioi tore about possible eoiuplieslltnyff
bate end foundation or a complete unit.
Perhaps tame of Powu'a reader* btleg
In thinking over various way* to handle met a timilar problem and wilt be tble iwB
the Job, we believe lhat oar first Hep help ut outline a good proctdms
should ho to aet op gay line* from a ring handling the Job.--Fd
W Tit
Readers' Answers
Which Heat Saver System la Moat economical?
JPe evaporate an average of 750,000 lb of water daily from six boilert having 2690 tq ft of heating surface and operat ing at 135 psig with a 3% blowdown. Sketch [bm Power, August, p 112] shows a continuous blowdown heatsaver system that has been proposed for installation in our plant.
Our deaerating heater operates at 2 to 4 psi. Using an average of 3 pet, we could expect to flash about 15%, or` 3375 lb of steam per day. This leaves 19,125 lb of blowdown per day for the second flash tank, which would prob ably flash about 1% from 3 psi ta atmospheric pressure.
if the second flash tank and steam to
the liquid heat exchanger were elimi There will be no saving in iddiajff!
nated, heat in the 1% (or 191 lb) of > the additional equipment shown in steam would net be lost since it would original sketch. This is /radii; Ktajj
pass through the llquid-to-liquid heat exchanger instead.
mil the slight increase in efficiency of the proposed system warrant the
since all condensate leaving flack No. 1 will be discharged to ihs icvi^g
in either cese.
-$0
Quantity of heal that la Ion to t>9
extra cost? ( believe one flash tank and. ewer i$ essentially constant as a liquid-to-Uqnid heat exchanger is the terminal temperature difference el-feSl most economical system for us to in llquid-tO'liquid exchanger is little mtcT
stall. Do Power readers think that l /ecled by the slight increase in
am ngAf?--CH
through it, caused by leaving out un
additional flash tank and exchsnger-.y
Heat available (or heating water will, therefore, be constsot *${sP
Use One Flash Tank and Larger Heat Exchanger
can be absorbed in the liquid*lo-B<fu[j!j|j
exchanger by Increasing its heating.JJgig lace by about 5%. This is obviously Wfl
ffCAT'SAvc* system, coojJst/flg 'of one flash tank and a llquicbtodiquid heat exchanger, U most economical fat.CfT* plant.
expensive than adding apparatus piping.
Milton N XttAVi Long JsUmd;b-lg
(Continued on page 116)
f O WI It November :]
The Problem's Half Solved When.
((voting coat tro flr botg* ond di> trihgllog it *enly lo bunkar.
You Find Somebody Who UNDERSTANDS
When you calk with a Stephens-Adamson engineer,you'll And he is qualified. He understands. He has worked out hundreds of material handling prob lems for others, He has at his disposal the "case histories" os well os the men who did the planning on many more S-A engineered jobs.
Of equal importance, our engineers are not restricted to one or two types
of equipment. The S-A Line includes o complete range of belt conveyors, bucket elevators, Redlers, skip hoists and other equipment. Your troubles can be overcome by the one best com bination.
Write today for data on StephensAdamson equipment for dependable, large volume, low cost bulk material handling.
Stephen
ams
Nov*inbr 1948