PROGRESS REPORT
TECHNICAL SERVICES DEPARTMENT
ANNISTON. ALABAMA PLANT
JOB HO.
^70:740
REPORT HO. 2
DATE
7/23/69
TITLE: OBJECTIVE:
Aroclor *nd HC1 Department Wa*ta Audit*
To identify the icurcei of we*c* in the Aroclor end RC1 Department* end Co quantify Cheae loe*.
PERSONNEL:
t. G. Wright (V. r. T*ffe)
REPORTED BT: E. C. Wright
SUMMARY:
Th aajor lourti* of organic (primarily Aroclor* but with amaller amount*
of Biphanyl, Santovax and HJB-40) and acid weeta in the Aroclor and HC1
department* have baen Idantlfiad and quantified. Hit?jKotfraQjS it*} f *r*aaic material from ttaw 4*f<rtma*C t* HjBWt--f ly VfOtjg The'
nev varahouaa drumming and flaking area account* for almoat Tialf of ehc
organic lo**aa with an avaraga dally lots of'llf/day. Tha ramalndar of
thaaa organic lo*aaa coeafroe tha Aroclor *till room aver (2#/day), tha
chlorlnator aavar (3#/day) and tha HC1 department (6#/d*y). Tha acid
loaaaa from thaaa department* came from tvo aourcaa. Tha chlorlnator
ttvtr and tha BC1 departmanC caver. Tha chlorlnator aavar (hovad an
avaraga loaa of l, lQ0#itCl/d*y end tha HC1 dapartaant lot*** were an avar-
aga of 15,500#/d*y.
r
To provlda facta on tha affact* of P.C.X. In plant affluant water. Snow'* Creak and Choceoloceo Creek, vara Invastlgetad, Snow'* Creek wea cheeked vlaually for two phase ayscatae (l.a. Aroclor end water). Nona we* noted more than ana block from tha plant boundarlea. Six saaplea of mud and vatar vara collected down*trasa from tha plant (*ee attached aap for location* of campling point*). Thaaa aaaplaa era now being analyred by organic raeeerch. Tha results of thaaa saaplee will be coomunicated aa soon aa they are received.
OSH 01A284
H ARTOLDMONO012129
Anniston Plane Progress Report f370:740 (2)
Company Confidant la 1 P*ge 2
PUTU7E WORK
1. Concinua Co aonitor organic loaaaa periodically on Cha total plant outflow.
2. A decision will be aada on continuing to saapla on Choccolocco and Snow's Creek as soon as the rrsulta from tha first sat of aaaplaa are rsceivad.
3. Collect ona sac of fish saaplaa frexa Choccolocco Creek and have thasa analyzed for P.C.S. lavals.
4. Continue to look for a beCtar aechod Co collect sanplaa froa two phase (t.e. Aroclor and Water) systaas.
5. Conduct a correlation study between Che organic research aethod for P.C.3. and tba Anniston aethod for CoCal organics.
Technical Services Dapartaant
QSW 014285
HARTOLDMON0012130
Anniston Plant Progress taport j/370:740 (2)
C<*sp*r.y Confidential, Pag# j
DETAILS
1. Stapling and Analvala
.g,
All aaaplaa taken during Chla audit wart 54 hour composite samples with the exception of Cha "grab" aaaplaa taken from Snow's and Choccolocco Creeks. Two very definite tvo phaaa systems were noced during chla audit. Thaae were 1 oca cad In the warahouae icwar and In Snow'a Creek about one block below the plant outfall. Sampling chla cwo phaaa gyetem baa proven to be vary difficult. We triad two aachode. The flrac nachod waa cha alow perlacaltie (Randolph type) pump. Ue chan tried a high apeed perlacaltie pump. Both of thaae ware unaatlafactory. We ara praaencly crying Co trap the Aroclor phaaa in a aump located at cha corner of Cha warahouae. Thia tunp it being staaurad everyday and ahould provide a much batter estimate of the volume of the aecond phaaa chan we now have.
The aaaplea which were collected In the plant ware analyzed for tocal organica by a method which waa developed by the Anniaton plane labora tory. The aloe aata of aaaplrj which were collected In Snov'a and Choccolocco Craeka will ba analyrad apaclfically for P.C.B. by Organic Research. There were Cwo raaeona for doing theae analyaaa differently. The flrat reaaon waa Chat the laboratory ac Anniaton did not have cbe proper facllitiaa euch aa a "clean room" and alio that they did not have cha correct type of election capture detector which waa apeclflc for P.C.B. To purchaae thia dacector and provide "clean roam" (Aroclor free) working space would have coat approximately $16,000. The aecond reaaon waa Cha time element lnwlved. The P.C.B. method In the P.P.B. range required approxi mately 2*3 houra per aampla. It waa felt that running tocal organica on cha in-plant aaaplea would be sufficient for determining exactly whara the loaaea ware originating.
2. flow Measurements
The flow from the HC1 department waa meaaurad by the Lithium chloride dilution method. Thia flow waa verlfiad by actual phyalcal measurement. The flowa from cha Aroclor still room and the warahouae ware determined by phyalcal aassurtaaat. Theta flowa were meaaured twice during the tljem which the waata audit waa being conducted.
HC1 Department Audit
The HC1 department racaivea anhydroua HC1 from the chlorinators in tha
Aroclor department. Thia gaa paaaaa through a falling film type abaorber
where it la abaorbed in water to fora Muriatic Acid. Th HC1 gaa strata
during tha peat haa contained entrained organica which have caused problems
in the production of Veter White,organic free Muriatic Acid. During 1963
approximately one-third of Che production waa aawerad in an attempt to
solve thia organica problem. This amounted to approximately
H //day of
HC1. In mld-1969 a catch tank and a membrane type coalaacar vera Installed
to trap out and remove theae organica. These two unite are operating lacla-
factorily and the plant la now producing Water White Muriatic Acid. Tha
OSH 01^286
HART OLDMONO012131
Annltton Plant Progress Report ^370:740 (2)
Company Confidential Page 4
HC1 Pepr:3tnc Audit
(Cont'd)
organic asterlel la composed of Slphenyl, Santovex and the lower chlori nated Biphenyls. This material la preaencly being drueaaed out and aanc Co Che coxic dump.
Sample Daca
Thaaa aamolaa ware collected Ear a period of 26 day*. They ware analyrad
for pH, X HC1 and organic*. Listed below era the daily high and low and
an average value for the 26 day period. A complete Hat of all of the
daca la on the attached daca aheeta. The aampllng point la noted on the
attached proem sewer map.
Da 11 v High
HC 1 i/dav 31,200 /
'
Orgalncs 2* /
Daily Low
1,200 #
1 /
Average
15,500 /
6.0 /
Average ?lcv 100 G.P.M.
Warehouse Audit
This saver collect* the waataa from the Aroclor drumming and flaking area in the new warehouse. It was found to be the largest singular contributor of orgaaica to the sever with an average daily loss of approx iaataly 11.0 //day of dissolved organic*. The 2nd (organic) phase of this sever la presently being trapped in a sump located at the north-east corner of the warehouse. During a one week period we collected approximately 2.5 gallons of organics or 27/ for the 7 day parlod. This average 3.8 //day plus the 11 //day of dissolved material brings Che total frw* this source to 14.3 //day. We will continue to monitor this sump to gather long tare data. These organics cae from two major aourcaa. These arc the wet scrubber which was installed to scrub the vents from the Biphenyl and Aroclor fltkara. The organic material and water la drainad from the scrubber once per day. It la drained by drop ping the material into a drum and allowing the-aqueous layer to overflow to the
sewer. The other major source* are leaks and apllla which are washed directly to the sever when Che floor ta steam cleaned in the warehouse. . '
Sample Daca
These sample* were collected for a period of 28 days. Thty were analyzed for pH, X HC 1, and organics. When it was found that the sample* were neutral, pH and X HC1 was discontinued. Listed below era tha dally high and low values and an avaraga dally value for Che sampling period. A complete list of Che daca la on tha attached daca shaecs. Tha sample point is noCad on the attached process fewer map.
OSM
HARTOLDMONO012132
Annlaton Plant Progree* Report *J70:740 (2)
Sample Data (Cont' d)
Organic* l/d*v
High Low
65# 2.2#
Company Confidential Page 5
Organic Pnd Phase i/dav
Average Average Flow , 90 G.P.M.
11.0#
3.a#
Chlorlnator Sewer
This ewer catches the cooling water from the chlorlnator and alio the utter from the drowning Jed on the vents of the crude Aroclor blowing tanks. The major source of organics In this sewer era pump leaks from the circulating pumps on the chlorlnators. The primary sources of HC1 are the drown^g Jets on the blowing tanks.
Sample Data
These samples were collected for only 13' days because repairs were being made on this sever when the sudlts were begun in Che ocher parts of Che Aroclor department. They ware analysed for pH, I HC1 end organic*. Dally highs and lows snd a dally average are listed below. A complete list of ell data la shown on the attached data sheet. Th* sampling point la noted on the attached proceaa sever nap.
Organics //day
High
32.8 #
Low 33 #
Average Daily
8#
Average Plow 250 G.P.M.
HCl it day
3,000 #
300 f 1,100 f
.
Aroclor Still Room Sewer
.*
This sewer receives sll of the weter used on the Jets on the Aroclor stills. These samples were also analyzed for pH, X HCl and organics. Th* pH snd HCl were discontinued when there was no HCl detected In e number of saaplea.
Sample Data
.
These sample* ware collected for e period of 14 days. The average dally organics lose from this sewer uta only 2 //day. Listed below are the dally highs and Iowa aa well as the average dally loaa for th* templing period. A complete list of the data La located on the attached data sheet. The sampling point la noted on th* attached process sewer map.
OS* 014283
HARTOLDMON0012133
Anniston Plane Progrea* Reporty}?0:7L0 (2)
Simple Data (Cont'd)
Organic H dav
Company Confidential Pge 6
High
8.9 *
Low
1.6
Average Daily
2#
Avenge Flow = 65 G.P.M.
Choccolocco and Snow1* Creek
Due to the recent development* concerning P.C.B. In water nd It* effect* upon wildlife, we decided Co begin sampling Che (Cream* which receive our uuce wacer from Che Aroclor Manufacturing Proceaa. W* began aaapling by fine checking Snow'*Creek for definite globule* of Aroclor lying in the boccorn of che creek.- We were only able Co deCect chi* a distance of about l block fron Che plane boundariea. Ocher point* further downstream were checked buc no Aroclor layer wa* found. Semple* were collected at alx polnc* downacreaa froa che Annlacon plane. One (ample waa caugbc upacreaa from che confluence of^ioWs and Choccolocco Creek*. Thi* aaapla 1* to be uecd a* * blank. Soch oud and wacer (maples were caught at each of these location*. Tba nice locations where theme aeaplee were collected
are ihovn on Che attached map of Che Choccolocco Creak waCerahad. The decs from thee* samples will be published as toon aa it ia received.
During September of 1964 two secs of sample* (mud and watar) were collected from Snow1* Creek. Theme temples were analysed for P.C.B. by organic research. Listed below arc th* results froa these sample*.
Sample Location
Sediment
Water
Plant Outfall
0.20 + 0.02J
58+2 P.P.B.
1 Block Below Plant Outfall 1.64 + 0.04X
Sample Broken
Calculation of the above data into #/day yielda a value of approximately 1 d/day of P.C.B. which la actually lost to Snow's Creek. The probablereason for the difference between 27#/4ay which we lose in tha'pUnt and Che If/day which shows up in Snow's Creek la that Che analytical method used to neesure losses In the plant oeaeures tocal organics losses. The losses In Snow's Creek were measured using the Organic Research method which is specific for P.C.B.
OSH 014289
HARTOLDMON0012134
| PH Date
BZHC1 ganic
6/3 6.5 NDA 2.0
6/4 6.7 NDA 11.3
WASTE AUDIT DATA SHEET
rfOcgatTji.cs /day
1.6
Sampling Point Aroclor Still Roon Sever
Prod J FI ou Rate |
Commencs
65 C?>
8.9 -
6/5 6.7 NDA 2.5
2.0
-
6/6 7.2 NDA 5.5 6/7 6.3 NDA '6.0 6/8 6.2 NDA NDA
4.2 *
4.7
-
-' -'
6/9 6.3 NDA NDA
-
-
6/10 6.2
NDA NDA
-
-
6/11 6.3
NDA NDA
-
-
6/12 7.1
NDA NDA
-
-
6/13 7.1
NDA NDA .
-
-
6/14 7.1
NDA NDA
6/15 7.4
NDA NDA
-'
i
-
6/16 7.5
NDA 7.5
5.8
-
-
AVER/ CE Hi AY -
2
DSW 014290 ) ------------------
-
HARTOLDMON0012135
WASTE AUDIT DATA SHEET
Dppartmenc D.C.I
Aroclor Dcpartaenc
7.HC1
P?M 0 ianlc s
6/4
3.2
.10 2.4
6/5 6.2 NDA NDA
Sampling Poinc Chlorinacor Sever
. ?HC1 fOrga rv. ex /day /day
Prod.I Flow Race (
Cornirencs
3,00<) 7.2 --
T250 G -
6/6
10.3 NDA 1.1
6/7 3.6 .09 1.3
- 3.3 2,800 5.3
-
6/8 4.1 .10 10.9
3,000 32.8
-
' 6/9
6/10
2.7 3.7
.01 8.0 NDA 2.0
300 24.0 - 6.0
-
6/11 5.7
NDA 8.5
- 25.5
-
6/12 3.5
.04 NDA
1, 200 -
-
6/13 3.5
.04 NDA
1, 200 -
-
6/14 3.5
.04 NDA
1,200 -
-
6/15 4.1
NDA NDA
6/16 2.7
.05 NDA
--
-
t
1,500 -
-
AVER/ ;z #/ciLY - 1,100 8.0
DSW 014291 _L i----------------------------------1
HARTOLDMON0012136
WASTE AUDIT DATA SHEET
Department Date f pH
HC1 Dep*^t'gle-C__________
fT HUPCTl aga*niircv.5"
I
tfOrganiea
Sampling Point HC1 Sewer
1//./DD*ayy rffHtHCCl l | 7dav
I | |PProroddJJ Plow | Race 1
Cotatcencs
5/20
.9
1.1 NDA
- 13,20 C
L00 Cl
5/21
.7
1.7 .5
.6 20, 40<;
-
5/22 .9
5/23
.3
1.2 NDA
.
1.4 .5
5/26 .8
2.6 2'
5/25 .8
2.6 2
- 14, 40C .6 16, 80C 2.5 31,20C 2.5 31,20C
- -
5/26 2.0
.1 4.0
4.^ 1, 20C
-
5/27 2.4
.1 5.9
7.1 1, 20C
-
5/23 1.5 5/29 1.0
.3 2.5 .6 12
3.0 3, 60C '
14.4 7, 2QC
-
5/30 .1.2
.6 7-3.
8.8 7, 20C
-
6/2
.4 . 2.3 .1
6/3 .8 1.9 3.3
.10 27, 60C 4.0 22, 80C
-
*
6/4 1.1
.7 20
6/5 .8 1.3 4*6
6/6 .8 2.2 8.6 6/7 .7 2.1 5.7 6/8 .9 1.3 5.7
24.0 8, 40C
-
5.5 15,60C
-
10.3 26,40C 6.9 25, 20C 6.9 5,600
-
-1
'|
OSW 014292 _L-
HARTOLDMON0012137
Department
7. HC1 ganica
6/9 .3 1.4 NDA
6/10 1.1
.5 5.0
6/11 .8
1.2 6.0
6/12 .7
1.2 4.5
6/13 .7
1.2 4.5
6/14 .7 6/15 .8
1.2 4.5 .8 5.0
6/16
.2
2.1 1.5
WASTE AUDIT DATASHEE'
QQrgan lcs /Day MCI /dav 16,80C
6.0 6, 00C
7.2 14, 400
!Prod. Flow Rate
IOOCPM
Comments
-
-
5.4 14,40C 5.4 14,400 5.4 L4,400 6.0 9,600 1.8 >5,200
-
AVERA ZZ #/C
6.0 L5, 000
ns U O L4293
__J________ l----------- 1-
--------------
HARTOLDMONO012138
VASTS AUDIT DATASHEET
Depar'.mcnc__Aoclor De^rtmenc
Date pH
rptTcJr ZHC1 panics
5/20
32
pOrgan ca /<iy
35.0
Sampling Point Warehouse $
Prod FI ov Rate
Comtrencs
90 C?H
5/21
11
12.0
5/22
NDA
5/23 5/24 5/23 5/26 5/27 5/28 5/29 5/30 5/31
6/1 6/2
7.2 NDA NDA 25 7.5 3.0 2.7 4.0 4.0 4.0
2.0
7.3
27.0 8.1 3.7
29.2 4.3 4.3 4.3
2.2
6/3 5.3 NDA NDA
6/4 6.4 NDA 15 6/5 6.7 NDA 10
6/6 7.2 NDA 13.3
16.2 11.0 14.4
0SW 014294
HARTOLDMON0012139
-------O----- 1
j 1
CO
VO
Depart sene *VCOCIWI PPM Oi
pH XHC1 ganlca 6/7 NBA 32.6
6/3 6.2 NDA 12.0
6/9
5.0
6/10 -
-
6/11 6.2 HDA
5.0
6/12 5.6 NDA KOA
6/13 -
- HDA
6/14 -
- NDA
6/15 4.5 HDA 60
6/16 6.1 HDA 2.5
WASTZ AUDIT DATA. SHEET
l#0rgan Lcs /day 35.2
13.0
5.4
8.7
5.4
-
-
65.0
2.7
Prod. Flov Race
90-CPI
Coramencs
-
-
-'
-
-
-
-
/ AVER/ QZ 4/1 ATf - LI.4
05M 0142^5 1 A t . _i__________________ ___ _
HARTOLDMON0012140