Document zw4pp6eeLxEZrjjK8n5B5e1a

Fofl S40 20* <-S< MiNTCO <M M A. ft Z&//3 BeSiwall Gypsum Company > FOR Paoli Lab DATE Sept. 6, 195JS FROM Akron Plat ATTENTION OF Mr. . G. huttleworth SUBJECT ACOUSTICAL PIASTER ANSWERING YOURS DICTATED BY D. E. Tinney - vms OFFICE ccj Mr. 0. Grieve - Paoli Mr. M. M. Powers - Akron On August 26th, 27th and 28th, I was in Clarksburg, W. Va., to observe the application of part of an 80 bag shipment of our Acoustical Plaster, shipped to Central Supply uompany, Clarksburg^tVa. The material was for the Victory High School at Clarksburg. Mr. Claude Snyder was the plastering contractor The first coat was applied 8/25/58 on the ceiling of the 1st floor. This it a hand mixed and hand applied job. Mr. Snyder said the brown coat was still wet and he used approximately 50 quarts of water per UO# bag due to the wet brown coat. Tuesday 8/26/58 the first coat was still very wet. There were no fallouts and a few blisters. The finish coat was applied on this ceiling on 8/27/58. ^3`The first coat was still wet but theiBwere no blisters or fisures. Mr. Snyder 'ftftft' said he was not worried about this as he had used Acoustical Plaster before. The first coat of Acoustical plaster on the ceiling of the second floor was applied 8/26/58. The brown coat was very dry. In hand mixing they used 65 quarts of water per hO# bag. This applied very good. The finish coat was applied on the following day, 60 quarts of water per L0# bag was used in the finish. All the ceilings were floated using a cork float. We checked the job again on the 28th and it looked very good. No fisures, blisters or fallouts. The reason for the rush in the application of the Acoustical plaster is that the school was to be opaied on September 2nd. Mr. Snyder and his crew were very satisfied with the working of our Acoustical Plaster and did not expect to have trouble of any kind with it. We al so had a small job of Acoustical Plaster at Cold Springs Construction Co., in Akron, New York, The first coat was machine mixed using 60 quarts of water per l<0# bag. This coat was applied 8/28/58. Al Kranz was the plastering contractor on this-job. This also was a hand troweled job. I inspected the job on the 29th and 30th. No blisters or fisures. The finish coat was machine mixed, using 70 quarts of water per bag. This was applied on September 2nd. This job was 'also Cork floated and it is a very good job. The owners of Cold Spring Construction are very satisfied with the job. Al Kranz the plastering contractor is very satisfied with the way our Acoustical Plaster works and applies. Received paoli, Pennsylvania SEP 3 1958 *** BESTWALL gypsum COMPANY SGP 0018891