Document zovvpZY2m8GVBBrvJV6q6OYL3
FRAZER PAINT COMPANY
2475 Hubbard Avenue Detroit, Michigan
*'
SCHEDULE I
TRADE NAME; CATSGOHY; COLOR: QUALITY:
Snocap Enamel Interior Trim Enamel White First
Pigment : k5% Zinc Sulphide Titanox A
Vehicle: 55% Heat Treated Linseed Oil Varnish DrierMineral Spirits Turpentine
Lbs. 207 360
450 69: 28
135 31
Yield in Gallons
Unit Cost
Total Cost
Weight per
gallon finished product, Laboratory
record 12. lbs.
.085
17.60
.15 IL-OP.
Storage & handling cost
through loss - 1%
'* - .18
81.00
.12 8.28
.07 1.96
.02 2.70
.10
Storage & handling cost
through loss - 3%
74.60 .75
97.04 2.81
Calculated Yield Manufacturing Loss - 2\% Actual Yield
1300
108.3
2.7 105.6
Cost Analysis: Material cost per gallon Direct labor cost per gallon Ihctory overhead per gallon Bulk cost per gallon Complete package cast per gallon. including fil ling charge Factory coat in package rer gallon
TRICES
(a) To a company owned or controlled outlet (b) To an independent wholesaler (c) Ey company owned or controlled cutletto retail customer (a) To an independent retailer (Dealer) (e) To other (Industrial)
(Contractor)
175.20
1.66 .24 .05
1.95 a9
2.14
None Ifone 4.00 3.15 3.20 3.25
"iPROOUCEO AT THE NAI iu~-
- ES
OPA 16232