Document zovKojbKwpQr0yO08kmeQ7zGz
ELECTRIC output from new tufbtao |ut meet# expected needs but loodtng vorle* enough to permit o scheduled molntenonce
STEAM LOADS ot Nekooio mill indicated o flOOO-hw turbine generator would fit into plant cycle 6ut". le'vke limited to limes when e*tiocltn loads were ovolloble. So compact, complete control letup wavvfik
Ijfi
Paper Mill Expands for In-Plant Steal
I Tieline Power
MAJOR exponslon problem# involved power services to new poper machine with soverol bonk# ol dryers. #leom turbino drive
Isolated paper mills gain greater stability for power circuits plus higher toad flexibility by tying electric-generatlng capacity together. Here's how added steam needs do double duty
By P H COLDWEU, Manager, MU! Paver, Nekeete-Edaerdt Paper Co
Br 1950, Nckoosa-Edwards Paper Co aw its electrical energy load for the Nekoosa and Port Edwards, Wit., plants
combined reach 13,000 kw.' This energy came from o blend of three hydroelec* trie power sources plus byproduct steam power within each mill. When the time came to expand, the necessary power pcogttoi Invoked two major projects'. (1) adequate steam for production need* at Nekooa* only tor the first step (2) ample additional electric energy but so supplied that W could serve both Nekoota sod the Port Edwards mills.
Elm step of the expansion program
was s boost of facilities ot Nekooaa, up 30%' in'polp, from 1S6 to 200 tons daily, and op about 90% in paper output, from 140 to 253 tons daily.
Steam needs at Nekooaa came in for detailed study. The existing source* were nowhere near enough. They were a 110,000-lb-pcr.hr 472>psi pulverisedcoal boiler, o 60,000-lb-per-hr chemical*
recovery unit of the same design char acteristics and five low-pressure boilers acting incidentally as standby for Lhe pulverhed-coal unit and mainly as a disposal unit tor waste wood.
Loading diagrams for the major steam usera, steam load for the max imum month, minimum averoge hydro generation over the past ten years, the peak expected electrical loads on the entire system, and the top copneity of the chemical recovery boiler under the new conditions went into the planning considerations.
enoineiiino and management section
Resulting loading indicated shoot IS,'' OOO-lb-per-br of added steaming ajitfr
ily would meet the veQuiremtnte. Bat when U cemo down to picking a ipc&s boiler other factors entered the pietuf For example, the existing 110,000-lbjjir* hr 475-psig unit carried a full lotdjb
mally through most of the year. A da-
ilar site and design of boiler woM permit (1) easing the loads on pre*3 facilities (2) using duplicate eqolpiKflt
with its attendant maintenance .of operating advantages (3) ichedulof.
some additional growth.
.
Further, this she boiler could'be
spotted in an area occupied by Wif the five old low-pressure boiler*. The*' maJnlng three, during s period el ohcnl 6 to 8 weeks In midsummer, oM ft pressed into full service so otto of the
475-psl units could be shut down apection, overhaul and mainteniBcev&
Because additional electric power tvw needed other pressures and temper, lures than the 475-psl 700-F boiler out
put were investigated. A lack lfPdenting faculties, though, ludlc**8
additional investment would not P*f Low-cost fuel advantages, which
earlier pulverhed-coal design gsvA to its selection again for the stCMB I*?,*
VlV WWO!?
ShilV latest refinements, in soot* ^ifVtnethodi end burner arrange^Jvcnl into the new unit to get ell ibie?opertling and performance
elTrJoem Accessorial. Coal and jjtiidling system, continuous blowyiSQoipment, combustion' control,
uijr regulation, ventilation, coat bind feedwater treatment were, in usLettentlons of existing arrangeJt^The two old stoker-fired boilers, ^ihtit tosl hunkers, induced-draft Joctwork, were pulled out, the site ffd;up for the hew boiler end the ^-l^hucket elevator relocated in tjjfthe existing stoker-fired boilers. ^Jjtotwining low-preuure units Vforniihed with a small eoal silo ^"Ixting bucket elevator adapted i*^*ith this silo. A further adoptsy.kfdlerted co&l from the old bucket ???.-* nnw bunkers supplying the *l*ttpacity pulverized-cotl boil-
introduced a definite flexibility SjiMadling since it gave two ways {!*!< cool from railroad ear to "fori1 bunkers. With it we could ^ntiintenanee on any of the coal^*57"ipment at any time and it jpjMisured continuous operation.
Water Supply. The plant deaerator and condensate-return system prbved in adequate under the existing plant. It
heid only about 3H minutes of storage feedwater so it woi Intolerable under the expanded setup. Winter-load condi tion! In the Nekooaa plant, according to our. studies, meant s supply of 300.000
Ih per hr of steam. So we selector) a new deaerating heater and storage tank. The deaerator can handle up to 400.000 lb per hr and the water-storage tank holds 75,000-lb, or about 15 minutes supply under winter-load conditions.
For much the same reason we added a new boiler feed pump, steam-turbinedriven. It supplies. In combination with trapped returns from process, a con tinuous blowdown system, and other waste steam, just about enough exhaust steam to meet feedwater heating re quirements. Any additional Heom (hat should happen la be needed comes from the 30-psi proceu-stesm system through a reducing valve. One of the older, smaller feedwater pumps can carry the plant load during moil of the summer. Two in parallel con, if need be- handle
the winter-season load. This alwoya leaves one or more pumps idle allowing time for maintenance and stand-by.
Turbine Equipment. When it came' around to picking'turbine size we fell back on our steam, loading diagrams. These diagrams showed minimum steam requirements over the calendar year, the maximum available steam from wood ' refuse (which, ol course, reduces by- product (lower supplied from turbine
extraction) minimum hydro generation for the past ten yearjt no steam flow to paper machine dryer*, but full power to keep the machines running, peak electricil loads on the full system, both Nekoose and Port Edwards mills. Then we superimposed the new expansion paper machine and pulp requirements
to determine toiaf electricaf needs. Under the worst conditions, we felt
64fl0 kw was needed for the additional expansion load. An 0.8-pf 600b-kw tur bine-generator with extraction at 30 psi would just meet this load. We recognixed this size affords no allowance for fuJure growth. Vet river-flow conditions vary enougVao we could plan mainte nance and overhaul enough ahead lo keep turbine output at rating even in
low-water periods. Our load studies further indicated .
condensing power wos needed only on nn average nf five mnniha a year. Dur-
CNOtNEHFNO AND MANAGEMENT SECTION