Document zorMEr5bqve0gKDKjdemkkxp7
Central
;
Engineering .
EPARTM ENT
./t ..OGRESS REPORT
CEA NO. / AR NO.
143(^
1430
DATE
August
14#
1968
IPRODUCT
Aroclors
TITLE
Increase Aroclor C^appaaccj ity
DISTRIBUTION
CED SECTION MANAGER. CED PROJECT MANAGER
R. M. Kountz
R W. PeteTSOll
DIVISION
JXT PLANT
Orgaiii*?
^ \ Anniston
L/e^
DIVISION REPRESENTATIVE.
W. F. ``PaffpF?______
O. R. Bailey J. M. Depp M. Dmytryszyn R. E. Emling F. W. Enoch J. R. Fair F. J. Holzapfel R. W. Kaltenrieder
F. P. LaBelle R. E. Lenz j. Maguire Russell L. Miller C. L. Parish A. B. Terry
(2)
Organic Dj^flsion
(ST S ./^ergerT)
W. K. KuTi'n H^/l. Minckler VS. A. Olson W. R. Richard
Anniston Plant
W. B. Papageorge H. L. Williams
W. J. Burkett R. R. Cook/R. C. Herman R. E. Howard
SCOPE
Aroclor production facilities at Anniston will be expanded by the addition of tankage for storage and for the preparation of blends, drumming facili ties in a new building (to be expanded on another project, CEA 1452, into a product warehouse), new and larger flakers for solid Aroclors and for biphenyl in the same building, and packaging equipment for flaked products. Tank truck loading and a new track spur with tank car loading and unloading facilities are included.
DSW 200609
^
CON FID E NT I AL
INFORMATI ON
THIS DOCUMENT IS THE PROPERTY OF MONSANTO COMPANY AND THE RECIPIENT IS RESPONSIBLE FOR ITS SAFEKEEPING AND DIS POSITION. IT CONTAINS CONFIDENTIAL INFORMATION WHICH MUST NOT BE REPRODUCED. REVEALED TO UNAUTHORIZED PERSONS
OR SENT OUTSIDE THE COMPANY WITHOUT PROPER AUTHORIZATION.
STLCOPCB4058673
KJ 1
-2-
ProductAroclorsLocation
Anniston, Alabama
Title
Expand Aroclor Capacity"
Data Tabulated As Of
July 31, 1968
CEA No.
1430
Appropriation
MS 1,400
Current Estimate
MS 1,307 *
Date of Estimate
8/8/68
Expended & Committed MS
953
Spent This Month
MS
200
Scheduled CompletionTk.Farm 7/68,Flakers 10/68
On Schedule? Insulator Strike - See Below
Process Design, % Complete
Mechanical Design, % Complete
Construction, % Complete
% Expended & Committed
Design Manpower Construction Manpower
AR No.
1430
Last Month
97
94
43 62 14 48
This Mo. 98 98 60 74 12 55
* $93,000 to be applied to a common building was transferred to CEA 1452.
SCHEDULE:
The tank farm is essentially complete except for pipeline insulation. The insulators went on strike 8/1/68 and no prompt settlement is fore seen. The plant will start up on Aroclor 1242 only about 8/20. They can operate perhaps until December without insulation. Cleaning of tanks is underway. Subject to timely settlement of insulator strike, the flaker area can be completed on schedule.
FINANCIAL:
Completion of the original goals and five approved variances totalling $70,000 is expected within appropriation.
DESIGN:
The design staff is cleaning up minor details in the flaking area. These will be complete 8/15 except for some drumming steel details and execution of minor variances.
Preparation of a scope and estimate for the Porocell treating column work has begun. Division Management is considering adding this work as a major variance to this appropriation request. A schedule will be developed by the September report.
Evaluation of the mill for Aroclor 1268 has begun.
DRUMMING FACILITIES:
The Toledo scale strike ended 8/12. Expediting is trying to improve our position in Toledo's scheduling of the high speed drumming scale. The decision to relocate existing facilities to the new site depends on resolution of the insulators strike.
r. W. Peterson Project Manager vo
DSW 200610
STLCOPCB4058674