Document zoqVB9L2BEXn6Ry8YRE44pdJB

D'TA steet PLAINTIFF'S EXHIBIT CIIR-182 ATR-C^RS'E ;V'ST date location OUST CONCENTRATION* IS' M. p. P.C. F. Maximum Allowable Concentration - Asbestos 5.0 2-8-65 .7-8-65 2-S-65 2-8-65 7-8-65 2-10-65 2-10-oS 2-10-65 2-.'-65 2-:;-.i5 7-:'.-'j5 7-10-65 2-10-65 2-10-65 2-10-65 Drake lining "rinding - West side grinder Brake lining grinding - East side grinder Inspection operation - West side bench Inspection operation - East side bench - West side employee Number 2 saw - gener.'-l air Nunber 1 saw - general air Number 3 saw - general air Number 4 saw - general air First floor mixer - general air Dry mixer on balcony - South side mixer Dry mixer on balcony - North side mixer Dry mixer on balcony - South side mixer dry mixer on balcony - South side mixer Dry mixer on balcony - South side mixer Dry mixer on balcony - North side mixer 2.7 1.5 2.4 1.4 1.5 2.0 3.4 1.4 7.0 3.0 1.5 5.7 5.4 3.3 4.3 2-12-65 2-12-65 Old Building - undercoat sealer mixer: Dixie clay added to mixer General air immediately following addition of clay 24.0** 10.0** * M.P.P.C.P, means million particles of dust per cubic foot of air ** Maximum allowable concentration is 20.0 m.p.p.c.f. for this type of dust. Samples were collected with a Mines Safety Appliances Company Midget Impinger at breathing zone level. TOLUENE VAPOR LOCATION TOLUENE VAPOR IN PARTS PEE MILLION PARTS Or AIR Threshold Limit Value 200 Unloading asbestos-sol.vent mixture from Daker-Perkins mixer into a wooden box Shoveling asbestos-solvent mixture from the wooden box into extruder hopper Breathing zone level of employee transferring sheet material to drying rack Moving drying racks into oven drying area 1500-1800 1100-1800 200-900 800-1000 Toluene vapor concentrations were measured with a J and W Aromatic Hydrocarbon Indicator Model SS at breathing zone level. <--rr 2 METHYL 'T:!YL K :Tf'NV "`POR location mek vapor in parts per million pacts on air Threshold Limit Value 200 Employee applying coating to brake liners Placing brake liners on drying rack Pushing drying rack to ventilated area 80-220 55-190 800-1030 MEK Vapor concentrations were obtained with a J and W Aromatic Hydrocarbon Indicator Model SS at breathing zone level. MONOCHLOROBEN2SN'E VAPOR LOCATION NONOCIT.OROBEN2ENE VAPOR IN PARTS P~R MILLION PARTS OF AIR Threshold Limit Value 75 Placing brake liners on drying rack - 5 minute average Employee applying coating to brake liners - we could not sample the area because the srnpling probe is not of sufficient length to reach from outside room to work area. 60 Vapor concentration was determined with a Davis Halide Meter. ILLUMINATION LEVELS LOCATION ILLUMINATION IN FOOT CANDLES Old Building: Area where K 124 and H2S drums are filled Area where K 1011 and K 120 drums are filled Northwest of Bandbury machine - 2 bulbs out of order Roller end of above machine Balcony - loading of Bandburymachine Balcony - above K 1011 and K120drum filling operation Farrell roller Adamson United roller Bench top Aisleway - storage area Loading dock area- near drums to be loaded - some bulbs out of order Receiving dock area under balcony 4-6 4-8 4 4-6 4-6 24-28 4-8 50-60 30-42 4-6 7-12 6-10 DA.TA SHEET ft3 ILLUMINATION LEVELS LCONT'D) LOCATION ILLUMINATION IN Warehouses Center of area South area Aisleway 16-20 8-16 1S-22 New Building: Brake liner grinding - West grinder - East grinder Inspection operation - East side bench Number 2 saw "ixing area - balcony Mixing area - first floor Coating operation 50 50 125 50 46 20-25 30 Illumination levels were measured with a Weston Foot-Candle Meter model 614. EXHAUST VENTILATION LOCATION AIR VELOCITY IN FPM Halcony - North mixer - capture velocity - South mixer - capture velocity First floor - North mixer - capture velocity - South mixer - capture velocity Coating conveyor line - capture velocity Hood above drums where H2S coating placed in drum - face velocity ilood above drums where K 1011 and K 123 packaged - face velocity Solvent room - diethylenetriamlne addition - capture velocity 50-70 50-35 less than 50 less than 50 50-150 140-150 230-300 150-170 SANITARY FACILITIES LOCATION URINALS STOOLS BRADLEYS 'WASH BASIN FLOORS WALLS SHO'/ERS New Building 13 3 O.K. Q.K. 6 Old Building: Second floor 331 O.K. O.K. 4* Receiving and shipping 1 1** 1*** O.K. O.K. dock * Flat top lockers provided. We recommend slant top lockers because easier to clean ** One toilet seat found to be broken ** No powdered hand soap dispenser provided.