DOCUMENT DESCRIPTION Memo RE M Mexico 1980 - Planned
Schedule of Major Problem Corrections
.
UM
Manvil e
Manville
Chrone
+
Internal Correspondence
W Ramiro Canizo
- Mexico City ADM
From W. B. Reitze WAR 1-06
Cope
H. B. Moreno
=
Paul Kotin M.D.-
Jose Grinda
-
WHQ 3-14 WHQ 1-06
Mexico City
ADM
Subport
Date July 10 1980
M. Harris A. L. Cini
- WIIQ 2-13 - WHQ 3-14
I was very happy to have the opportunity to meet with you in Mexico City on July 8 1980 and discuss the progress being made to correct the ADM environmental problems As promised attached is a list of problem areas and a time table for
correction of these problems
This list contains only the major problems that we consider to be of the highest priority You will note that there is a date for completion of each item Certain completion dates were taken from your assurances at our recent meeting If for
some reason these dates are not suitable because of back-
ordered equipment or delayed construction scheduling please
advise and we can further discuss the dates
and
There are a number of items items 2 3 7 11 12 14 and 17 that require immediate action You will also note that these
items do not require the expenditure of large sums of money
They are merely changes in work practices
Each of these
changes in work practices should begin with a written ADM
policy statement which should be circulated and explained in detail to all levels of supervision More important than the
written document is the day to day enforcement of these work
practice changes
Item 17 Safety Program at all ADM Locations is listed in
the context of an advisory suggestion Here as we discussed
we are interested in correcting the major safety hazards
those hazards that would result in loss of life or loss of
limbs to an employee As discussed there are a number of
Jocations in all of the ADM plants that have unguarded shafts pulleys belts and saw blades Many of these unguarded areas .
pose a high risk of thereby being drawn diameter saw blades
an employee getting his clothes caught and into the moving machinery The large Guadalajara pose an imminent danger of
an operator losing an arm or worse there are a number of high platforms should be changed to insure that the
Throughout the operations where the work procedures guard chains which for .
the most part are in place are used to prevent an employee from stepping off the platform
{
&
in re
5) nl
Ramiro Canizo
=2-
;
July 10 1980
Your expressed plan to institute many of these changes at Barrientos first and then after the systems are better
organized extend them to the remote locations is soundall
However in the area of work practices I believe that all of these locations should be given attention within the next
three months
Your suggestion to furnish me with a status report every two months is excellent and we will look forward to your reports In addition to these reports I will arrange my schedule so that I will be able to visit the plants as well as talk with you at periodic intervals
Once again I would like to remind you that we stand ready to help you in any way that we can to accomplish this environmental upgrading of the ADM operations Please do not hesitate to write or call me by telephone if there are any questions Our regular meetings during my visits to Mexico City should
provide ample time for detailed discussions|
tiped in
F.
tiped
Fynne
Fynne
Phas
'AREAS NEEDING ATTENTION
1. Fiber feed stations at
Barrientos both pipe
machines and sheet
machines are to have a .
positive system for dust
control
dry or wet -
including bag aside
2. Selling of empty asbestos bags at Barrientos and other plants
Use of asbestos containing
waste to absorb oil on floor
in sheet departments at
Barrientos
o 4. Clean up and rebuilding of silica mill at Barrientos
;
5. Waste from bag houses at Barrientos
6. Finishing end - Pipe- at
Barrientos
ACTION AND DATE OF COMPLETION
1st Kollergang to be operating by October 1 1980 2nd Kollergang to be operating by July 1 1981 All necessary hooding for fiber feed stations will be reviewed for per / formance by October 1 1980 Changes necessary to correct deficiencies in hooding will be completed by January 1 1981
This practice is to cease immediately
This practice is to cease
immediately An oiling machine should be installed by April 1 1981
Primary crusher to be removed mine site by October 1 1980
Installation of ball mill and
to dust
collector as well general cleanup of silica plant by January 1 1981
Workers hand loading bag house waste
by shovel for either disposal or
refeed must wear respiratory pro-
tective devices
.
An engineering solution to this
problem must be in place by
,
July 1 1981
All finishing end machines lathes coupling offs etc. shall be either converted to wet cutting or hooded and tied into a dry collection system by July 1 1981. Methods for
efficient clean of wet collection system shall be installed by
January 1 1981
Page -2-
AREAS NEEDING ATTENTION
o 7. Dust collection system regrind at Barrientos
B. Periodic inspection and
maintenance program all dust collectors -
all plants
9. Comprehensive housekeeping program in all ADM plants
10.
Medical
-
program
large
35 x 43 Cm rays
pulmonary function testing
and complete medical
examination including
hearing test at all ADM
plants
bane
ddath
11. Blue asbestos fiber leed
station at Villa Hermosa
12. Fluid effluent all locations
ACTION AND DATE OF COMPLETION
- The regrind dust collection system should be reviewed with particular attention to a regular maintenance program and a general area clean This should be accomplished by November 1 1980
- Design and institute program which
:
will provide assurance that all
existing dust collectors are
functioning properly This should
be completed by January 1 1981
- A comprehensive housekeeping progran must be designed and implemented in all plants immediately This shall include prompt same shift removal of dust ser^/p spilled raw materials trash from floor . machinery and overhead ducts and
beams wet sweeping only is to be
used until adequate vacuuming
systems can be installed at a later date Vacuuming central or
boosters from existing collectors should be designed installed and functioning by Ju y 1 1981
Clinic will be completed at Barrientos fully staffed and equipped by January 1 1981
- A mechanism must be devised so that
this clinic at Barrientos will
service all ADM locations
- A dust blue fiber feed station must be designed and installed at
Villa Hermosa by January 1 1981
- Investigations and evaluations - should
be made of all plants waste water
discharge by July 1 198Mexican1An.y plant
not in compliance with Mexican law . should begin writing plans to bring fluid effluent into compliance by January 1 1982. Exception to above time schedule would arise if Mexican government desires earlier action
ba)=4thal ste
me
Page -3AREAS NEEDING ATTENTION
13.
A comprehensive respirator
program for Barrientos and
Guadalajara
A limited respirator program
Hermosa for Villa
Hermosillo Hermosillo
and
14. Mexican government employment regulations all locations
15.
Solid waste disposal all plants
Use of sludge for storage
yard and roadway surfacing
Barrientos
:
17. Dust collectors on mixer
platforms at Quaretaro
talies 18. Dust collection system and
i
bulk handling system for
raw materials at Hermosillo
aR 19. Safety program at all ADM
be
locations
ted
BRP
ACTION AND DATE OF COMPLETION
A respirator program designed to
provide any employee working in high dust areas with respirator protection The progran must be
made mandatory with disciplinary
measures taken for infractions
The program must be enforced by the.
supervisor
- A mandatory respirator program to
:
assure protection of workers at
fiber feed stations during actual
charging shall be instituted at
Villa Hermosa and Hermosillo
- Effective immediately all Mexican government regulations dealing with employment of under age workers must
be adhered to
- Beginning immediately a program should be implemented to promptly and safely remove asbestos containing waste from buildings and adjacent property Asbestos containing waste should be covered with other material at disposal site
ok
- Surfacing of storage yards and
roadways with sludge from settling
ponds should cease immediately
Extremely dusty asbestos containing
with roadways should be recovered
a
nonhazardous material
- Dust collectors on mixer platforms shall be installed by January 1 1981
- A dust collection system and bulk handling system for asbestos silica
and cement will be installed and
operating by January 1 1981
+ Beginning immediately a survey of
all ADM locations should be made to identify major safety hazards These major safety hazards should be corrected within three months from date of identification Major safety hazards would include unguarded saw blades shafts pulleys and high platform walkways
PPETFST
vt
er
JM Manville
ry
=<
Internal Correspondence
M. Llano
Asbestos de Mexico
Chaty November 6 1980
W. B. Reitze
WHO 1-06
P. Kotin M.D.
H. B. Moreno J. Grinda
1-06 3-14 ADM
R. Canizo
ADM
F. Aviles
ADM
R. Sustaita ADM
ENVIRONMENTAL CONTROL PROGRESS ASBESTOS DE MEXICO NOVEMBER 4
1980
A. L. Cini H. J. Young
3-14 1-06
Helen Young and I met with Messrs Fritz Goebel Jose Grinda
Ramiro Canizo Francisco Aviles and Ricardo Sustaita The
purpose of our meeting and subsequent plant tour was to deter-
the mine
progress of the written environmental quality improve-
ment plan
First of all a few general comments It was very apparent
that some progress has been made at the Barrientos location More employees than before are wearing respiratory protective devices The housekeeping throughout the manufacturing and storage areas has improved greatly There is much evidence of new work being carried on Steel work is being erected for installation of the first Kollergang The concrete weirs for water separation in the new close system are being completed The use of waste asbestos fiber to absorb oil in the corrugated
sheet area has been discontinued There is evidence that the |
used plastic bags are being bundled and placed in the autoclaves for disposal and I was told that the practice of selling bags has been discontinued There is evidence that the floor sur rounding the regrind system has been paved making it easier to clean The use of sludge for paving of storage yards has been discontinued and we were presented with evidence that the Board of Directors has approved step to pave these storage yards with concrete Several of the rather flagrant safety violations noticed during the June visit have been corrected that is unguarded high platforms etc. Inspection of the new clinic facilities indicated that they will be on line
very shortly H. J. Young will comment in a separate report on the clinic facilities
In order to more clearly discuss some of these issues I will use the list of nineteen points that I prepared and included
in my July 10 memo to Ramiro Canizo
ais
a
+ ]
AREAS NEEDING ATTENTION
1. Fiber feed stations at
Barrientos >> both pipe
machines and sheet machines are to have a
positive system for dust control >>> dry or wet including bag aside
2 Selling of empty asbestos bags at Barrientos and other plants
3 Use of asbestos containing
waste to absorb oil on
floor in sheet departments at Barrientos
4 Cleanup and rebuilding of
silica mill at Barrientos
5 Waste from baghouses at Barrientos
6. Finishing end - pipe -.
Barrientos
ACTION AND DATE OF COMPLETION
It appears that the first Kollergang should be operating by early January 1981
ADM advised that the second
Kollergang might be delayed somewhat but that the delay would not be significant The changes in the hood will
be accomplishwietdh the instal-
lation of the Kollergangs
ADM advised that this practice has ceased and evidence indicated that bags were being placed in the autoclave for destruction
Visual inspection indicated that this practice had ceased A soap solution is now being used which not only eliminates environmental problems but apparently it performs its in-
tended function better than the oil
ADM advised that because of problems with the supplier this entire project has been delayed for six months
ADM advised that hand loading of baghouse waste materials is no longer permitted and in at
least one area indicated that chutes had been extended and large plastic bags were used for collection of this material
The finishing end machines are at present being converted to wet cutting Inspection indi-
cated that this conversion was
actually in progress
AREAS NEEDING ATTENTION
_?
7. Dust collection system at regrind at Barrientos
ACTION AND DATE OF COMPLETION
Inspection indicated that paving of the floor area around the regrind section had been accomplished Since the regrind
unit had broken down and was
being repaired it could not be evaluated during the inspection
8. Periodic inspection and
maintenance program all
dust collectors - all plants
ADM advised this was still being done on a hit and miss basis but that plans have been made to incorporate this function into the duties of a newly appointed environmental engineer Mr Ricardo Sustaita
9 Comprehensive housekeeping program at all ADM plants
Inspection indicated that the existing program had been auge
mented greatly although | improve-
ments are still needed
The overseeing of this function should also be assigned
Mr. Ricardo Sustaita
10 Medical program
clinic
This is progressing very well and will be covered by H. Young's
11
Blue asbestos fiber feed station at Villa Hermosa
12
Fluid effluent - all
locations
would be sufficient to remove dust This should be verified when this is fully operational
verified
The solution to this problem
is progressing very well at Barrientos and again with the full training and assignment of
Mr. Ricardo Sustaita this
should progress satisfactorily
mY
AREAS NEEDING ATTENTION
|
13
A comprehensive respirator
program for Barrientos and
Guadalajara
Limited respirator programs
for Villa Hermosa and
Hermosillo
|
ACTION AND DATE OF COMPLETION
- While the respirator program at Barrientos has been improved slightly there is a long way
to go Workers were seen at
many locations not wearing respiratory protective devices - One flagrant violation that should be corrected immediately is the mandatory requirement that all maintenance workers must wear
respiratory protective devices Inspection indicated that none of the maintenance workers repairing the regrind operation were wearing respiratory protective devices even though they were handling asbestos fiber and clouds of dust were emanating from the workplace - Inspection indicated that workers at the feed chrysotile and blue not wearing res piratory protective devices and
the air systems were not in operation ADM advised that the reason
the air systems were not in opera-
. tion was the fact that they were being revamped and would be com-
pletely redone when the new
Kollergang and collectors were
put in place
.
- Until the dust collection systems
in the new AC pipe plant are
separated is material
conveying and collection
operators must wear respiratory
protective devices This is one
program that cannot wait We will|
be making a special effort to pro-
vide Mr. Ricardo Sustaita with
aids to train workers on the im-
portance of respirator programs
14.
Mexican government employment regulations - all locations
~~
Despite previous statements by ADM personnel at various loca- -
tions now ADM assures me that
...
no under workers are being -
employed nor have they been
strict
emplio n ty he e pad st The strict
+ Mexican government regulations
are being adhered to and have been
carina
adhered to and any visual impres
te
sions gained during previous
inspections perhaps were due to
a
small sized men not young boys
AREAS NEEDING ATTENTION
15
Solid waste dispos^/l-
all plants - .
ACTION AND DATE OF COMPLETION
- Although this is being looked into again ADM hopes that with the assignment of Mr. Ricardo
Sustaita on a time basia
;
this can be augmented
16
Use of sludge for storage
yard and roadway surfacing-
Barrientos
.
17
Dust collectors on mixer
platforms at Quaretaro
18.
Dust collection system and
bulk handling system for raw
materials at Hermosillo
19.
Safety prograamt all ADM
locations advisory only
ADM advised that this procedure has been eliminated and further
showed me fiscal commitments for
the year 1981 which would step step pave these yards
ADM advised that decisions have been made to install a new dust collector when new mixer is installed The smaller dust col- | lectors now in use on the mixers
will then be moved to the injection molding equipment This operation will be completed as soon as a
final decision is reached on the type of large mixer to be installed
ADM advised that this is being
worked on The money has been
appropriated for this system but
it is not too clear to me what the progress will be
Some of the major safety hazards have been corrected of platforms saws at Guadalajara etc. Again this function should be augmented when Mr. Ricardo Sustaita becomes fully operational
I appreciate the time for some depth discussions regarding philosophical differences regardingregarding workplace safety and health These discussions discussions have helped me to understand why patience must be exer-
cised I think it is also very important to say that in spite of
this people at risk must be protected even if this should mean
upsetting some traditional thinking In those situations requiring
rather large engineering projects patiencepatience will be necessary Blow-
ever in the mandatory wearing of respiratory protective devices
this must be fully implemented immediately
protect the
health of those working with asbestos fiber
ba
Generally speaking I was pleased with the progress that has
actually been made and I was also pleased to receive a copy of
=
the 1981 budget indicating the ADM Board of Directors has approved
substantial sums for continuation of these projects I still feel
very strongly that all of those in the ADM management must keep a
continual pressure to assure that these projects are completed as
soon as possible There are still employees at possible risk from
. asbestos disease and this risk must be reduced immediately
In response to I am arranging
days regarding
your request for this and this matter
to have Mr. you will be
Ricardo advised
Sustaita trained within the next few
;
In answer to your questions as to when I would return for a visit my plans currently call for a visit in the spring and you will be advised several weeks in advance At that time I will probably
wish to again visit all the ADM locations
W. B. Reitze