ELECTRICAL JOB SUMMARY FOR P-645 Field is to install a size 1 starter and a 30 A. fused disconnect on starter rack 2000 as shown on drawing 20A-709. The size 1 smarter will be Circuit 2037 for the asbestos dust collector. The 30 A. fused disconnect will be Circuit 2036 for the air conditioner/heater system for the asbestos fluffing room. All connections, devices and fixtures in the asbestos `luffing room will be water tight for washing down. Fixtures and devices wil be located as shown on drawing 31A-72000. Field will route all conduit for circuits 2036, 2037 and LA 7 and 8. Circuits LA 7 and 8 will be picked up from lighting panel "LA" at the environmental lab - drawing 31A-72000. Castleberry/Sigmund:dls has/7/ rw Oi ; t : ::< 1(0, /4-A67'