Document zoYX9oqKzDOdOrkmOv2q4y2zz

>&*? A-.: rt L. L.RiHr ey ^6 /9/W'?V )&&*& lOJ/ jS/wjl ReCIV< to APR 2 7 1994 Lcttz cCi'cl uo ' 6^ * (- Cy U c Cu, . CL~Lax ci*f * u (\slci~S{t tjr^ ( clLi'y1 ( C&cmZ^ InovA^rcjOj) az^fi&e. CsLua* &s\jl O'touj {'/vcfvJj) HSiCqU^l^ tLor cI]i6ac~~cji_ (s^clx /-- / d-j, Jc/j~ ^ c .5 (-' { ccC /"?--(u w-L '-- U*~- --*' *7 J/Oo J'U AC't / U J^vC ^ ^ `'pf- /^ a-., r /-. > - ;7---- r d-vv / J<- ') ALCOA J-.Cndx*'- .li x-yf^L.1 u-i / 1501 Alcoa Building Pittsburgh, Pennsylvania 15219 IC60763 0216 - --f r?;- Alcoa Building Asbestos Sampling Plan Methods: I. Phase Contrast Microscopy (PCM) samples: High volume samples should be conducted using the NIOSH 7400 method. Sampling results are to be compared with the EPA recommended clearance level of 0.01 fibers/cc. Sampling equipment - high volume pump (2 to 121iters per minute) Minimum sample volume 3000 liters of air (per each sample) Sampling medium 0.8um pore size mixed cellulose ester membrane filter 25mm open face filter in a three piece filter holder with a 50mm electrically conductive extension cowl Two field blanks (per each day of sampling) Analytical method phase contrast microscopy (PCM) fiber count (NIOSH 7400 & 29CFR 1926.58 mandatory Appendix A "OSHA Reference Method" - especially quality control aspects) II. Transmission Electron Microscopy (TEM) samples: High volume samples should be conducted using the U.S. EPA AHERA method. Sampling results are to be compared with the EPA recommended clearance level of 70 structures/mm^. Sampling equipment - high volume pump (2 to 121iters per minute) Minimum sample volume 3000 liters of air (per each sample) Sampling medium 0.8um pore size mixed cellulose ester membrane filter 25mm open face filter in a three piece filter holder with a 50mm electrically conductive extension cowl Three field blanks (per each day of sampling) Analytical method transmission electron microscopy (TEM) fiber count (Method specified by the EPA (AHERA) Asbestos Emergency Response Act) H:\L\ASB_SAMP.DOC LLR 04/26/94 02:44 PM Page 1 C60763 0217 cc One TEM and three PCM samples at every sampling location. Sampling locations: 1. Floor 31 at base of ladder to the roof 2. Sub-basement steam room 3. Typical floor - either unoccupied office, conference room or hallway (either 6 or 19 where occupants will understand the nature and purpose of the testing) 4. Floor 14 conference room (subject to vibration from the 15th floor mailroom). This is a tenant occupied floor occupied by the law firm LeBoeuf, Lamb, Leiby & MacRae. 5. Sampling concurrent with removal job a. outside the enclosure during the ACM removal job, and b. clearance sample on the floor where removal operations were conducted after dismantling of the enclosure at the end of the job. H:\L\ASB_SAMP.DOC LLR 04/26/94 02:52 PM Page 2 C60763 0218 (( Sampling services arc available from: Price quotes are being obtained from two of the following sampling contractors. Quotes will include analysis at a certified outside lab or the alternative of analysis performed by Alcoa EHL. ACM Compliance, Inc. (may not employ any CIHs) Baker/TSA, Inc. ICF Kaiser Engineers, Inc. IT Corporation NUS Corporation S.E. Technologies Cost estimate: The attached quotes received from the vendors contacted indicate that the cost of the modified asbestos survey (with TEM samples) ranges from $1910 to $2075. An additional quote which dosn't include the analysis of the PCM samples ranges from $1310 to $1775. If we decide to go this way, we can have the PCM samples analyzed at ATC Environmental Health Lab (EHL) at $20/sample (as compared with the $30 - $40 charged by outside labs). EHL maintains all of the certifications and QC programs that are required for this work. H:\L\ASB_SAMP.DOC LLR 04/26/94 02:44 PM _ Page 3 C60763 0219 ftp R-26-94 T U E 10 = .S 0 ACM R- 0X c r.d#2 box265-a saltsburg, pa 15681-9802 4.12-468-4277 fax 412-468-4285 asbestos management EPA/AHERA accredited PA certified load paint and water tolling surveys and assessments * compliance mooring projoot design commercial/ Industrial (FAX Transmittal : T- LaV)P,A Fax. Number: 55 5 From: YN0Wt' Bern- hJeOMefeiV Number of pages (including cover): UHJi^ ft-- II I 1 i C60763 0220 A'-F* R-26-94 TUE 10:31 ( 0ACM f P - 02 r.d.#2 box265-a saltsburg, pa 15681-9802 412-468-4277 fax 412-468-4285 asbestos management EPA/AHERA accredited PA certified lead paint and water tasting surveys and assessments compliance monitoring project design commercial/ Industrial April 25, 1994 Ms Laura Rippey, CIH Aluminum Company of America 1501 Alcoa Building Room 656 Pittsburgh, PA 15219-1950 re: High Volume Air Monitoring Alcoa Building Dear Ms Rippey: ACM Compliance, Inc. is pleased to submit for your approval our proposal for the asbestos related air monitoring services at the Alcoa Building. Per our previous telephone discussion, the air volumes have been Increased 1500 - 3000 liters to comply with the Allegheny County Health Department, Bureau of Air Pollution Control final air clearance standard as well as NI0SH 7400 method for air monitoring, see attached method. The Initial air monitoring program will Include sampling at the following locations: 31st floor at base of roof ladder, sub-basement steam room, 6th or 19th floor, the (ijkhjfloor conference room, as well as outside the enclosure during an abatement activity. C60763 0221 ALCOA Building April 25, 1994 Page 2 The subsequent air monitoring program will Include a sample In the abatement area after completion, (total removal of the enclosure) of an abatement activity. If an additional day Is necessary to draw the during-abatement procedure sample, pricing for that sampling day is included separately. Four samples will be drawn at each location, three wifi be analyzed by PCM, Phase Contrast Microscopy, while the fourth sample, will be analyzed by using the TEM method, Transmission Electron Microscopy. It is understood that the PCM samples may, at ALCOA'S discretion, be analyzed at the ALCOA Environmental Health Laboratory. Additionally, a field blank will be submitted for analysis each day. Pricing 1. Air Monitoring Program Initial Monitoring After Abatement Monitoring Additional Sampling Day (if needed) Air sample analysis PCM 20 samples (including 2 field blanks) @ $30.00/sample Air sample analysis TEM 6 samples @$110.00 $350.00 $150.00 $150.00 $600.00 $660.00 $ / $ Uu C60763 0222 A-,R R -- 2 <3 -- -4 T U E 1 = Z 2 ACM ALCOA Building April 25, 1994 R - -t c Page 3 As discussed, I have attached the Appendix A of Subpart E from the AHERA regulation concerning TEN! sampling and analysis, as well as the previously mentioned NIOSH 7400 method for the for your files. Thank you for the opportunity to provide you with this proposal. Please contact this office at your convenience should you have any questions. Respectfully submitted, Mary Beth Neumeyer President MBN/Irm C60763 0223 APR 26 '34 07=57 BAKER EWIRONNENTAL/ INC. I-. /- ......vz ake | ^ BakertnironmentaUnc. Airport Office Park- ^`ft^Road ^ 412-269-0000 Coraopotli, PA 15108 P.l TELECOPY TRANSMITTAL DATE: TO: (Company) (Attention) FROM: ___________________________ _________________________ _ TOTAL NUMBER OF PAGES INCLUDING THIS TRANSMITTAL PAGE MESSAGE: lout#, IF YOU DO NOT RECEIVE THE NUMBER OF PAGES INDICATED, PLEASE CONTACT OUR OFFICE AS SOON AS POSSIBLE. OUR FAX NO. IS: 412-269-6097 C60763 0224 RPR 26 '94 07:58 BAKER ENVIRONMENTAL, INC. c Baker April 26, 1994 c P.2 Baker Environmental, Inc. Airport Offico Park, Building 3 420 Rouaer Road Coraopoll*, Pennsylvania 15108 (412) 269-6000 FAX (412) 269-6097 Ms. Laura L. Rlppey, CIH Staff Industrial Hygienist FDA Coordinator Aluminum Company of America 1501 Alcoa Building, Room 656 Pittsburgh, PA 15219-1850 Dear Laura: As you requested on April 21,1994, Baker is pleased to provide the following quotes to provide asbestos air sampling and analytical services according to your scope ofwork (SOW provided via FAX on April 21,1994), and our telephone discussions on April 21 and 25,1994: Quote 1: $2075. Tins price includes labor, other direct costs, and laboratory analytical services to collect 3 air samples at each of six locations (18 samples [IS air samples on one day and 3 air samples on the second day]) and to analyze these air samples plus 3 media blanks for asbestos by phase contrast microscopy (PCM), plus collect one air sample at each of the six locations (6 air samples in addition to the 18 air samples described above) and to analyze these air samples plus 3 media blanks for asbestos by transmission electron microscopy (TEM). Air sampling methodology (Le., media, flow rate, and 1500 liter sample volume) and sample analysis will conform to the methods specified by the U.S. EPA in the Asbestos Hazards Emergency Response Act (AHERA). However, the sampling protocol (i.e., number of samples and non-aggressive sampling) will be ALCOA's. Quote 2: $1775. This price includes the services described in Quote 1 except the PCM analyses; Baker will process the samples to ALCOA'S analytical laboratory for asbestos analysis by PCM Baker will tabulate the results received from the laboratory, will compare the results to the EPA's clearance criteria for asbestos of0.01 free for PCM analysis and 70 s/mm2 for TEM analysis, and will submit the table of results with a cover letter and the sample collection sheets including the chains of custody to ALCOA within one week ofreceiving the laboratory analytical reports. A Total Quallly Corporation C60763 0225 RPR 26 '94 07=59 BAKER ENVIRONMENTAL/ INC. r laker Ms. Laura L. Rippey, Cffit Page 2 April 26,1994 c P.3 Turnaround times for the PCM analyses will be adjusted according to the needs ofthe project (such as overnight turnaround for the"clearance" air samples); turnaround time for TEM analysis will be more than 72 hours, but is typically less than & working wed:. These quotes are lump sum prices for the sendees described. Baker can perform this air sampling according to your schedule following receipt ofa valid contracting document (such as an ALCOA purchase order). Baker will invoice ALCOA monthly according to the level ofproject completion on terms ofnet 30 days according to Baker's General Terms and Conditions (attached). These prices are valid for a period of 60 days. Baker looks forward to providing these services to you. Please call me at 269-6000 ifyou have any questions. Sincerely, Baker Environmental, Inc. Edward A. Guida, PE, CIH Manager, Environmental Health and Safety Enc. C60763 0226 APR 26 '94 07:59 BAKER ENVIRONMENTAL/ INC. <" ( GENERALTERMS AND CONDITIONS DEbuSlitGNfo "ENGINEER* shall mean Baker Environmental, Inc and "OWNER" ahall mean th* client named In Die Apwnntt NTANDARD CABBi The Standard ofcare applicable to the ENGINEER/* services will b the decree of skill and diligcnoo normally employed by profowianal engineer* orconsultants perforatingthe umt orsimilar Servian. ACCES81 The OWNER (hall foiruMvall access to property andrightfrofiway forthe performance ofthe ENGINEER1! acrvlocs and the construction ofthe project. NSTIMATEfii Estimate* for goat of construction, flasnring. acquisition of land and righl*-of-w*y (hall ho made in accordance with food enclneerlngpractira and procedure. However, the ENGINEER hie no control aver construction costa, competitive bidding and market conditions, nor coda of Gnaticing, aayiWlkn of land or rigkta-af-woyi and the ENGINEER doea not guarantee the aocumoy ofauch coot eat!matea aa compared to actualcost or contractonfbld*. CONBittUCTION PHASBi The ENGINEER ahaQ not he responsible during the construction phaae far the construction moana, methods, technique*, oequcneee or procedorea at construction contractors, or the safety precaution! and programs incident thereto, and he (hall not be reeponsibl* fer the contractor's felloreto perform the work Inaccordance withthe contract document!. PAYMENT! Partial payment! ahall be made monthly by tin OWNER to tho ENGINEER baaed oainvoice* lubmitted by the ENGINEER. The OWNER shall also pay the ENGINEER a latepayment charge for any payment* notmade within thirty (30) day* ofthe date ofapplicable invoice* at the rate of 1-1/2% permonth. TIME OP PERFORMANCE! Hie ENGINEER ahall commsnea work upon receipt of written notice to proceed from the OWNER and shall complete the work within the time period aet forth in Uw Agreement, subject to any delays caused fay the OWNER, other agendea Involvedin review oTthe workor any otherparties not directly under the control ofthe ENGINEER. MODIFICATIONS; In'the event the OWNER require* modification! and/or chance* after services have been performed, which modification* and/or changes are through Be fault of the ENGINEER; or in the event the OWNER desires additional work net covered by fire Agreement, the ENGINEER ahall perform atuh workae ordaredfay the OWNER inwriting and shall be paid for such work as may be agreed between the OWNER and the ENGINEER, or on the basis cf direct certified payroll costs chargeable to such work plus payroll tax**. Insurance and fringe benefit costa, plus 160% ofthe total ofall suchpayroll eosts to cover overhead and profit*. SUSPENSION OR TERMINATION! In the event the work ii terminated or aappended by the OWNER prior to the completion of the Agreement, the ENGINEER dull be paid an equitable amount proportional to the cervices rendered to the date oftermination or suspension, LEGAL; The OWNER shall furnish the ENGINEER all legal services and opinion! necessary In the performance of the services to be rendered by the ENGINEER. INDEMNIFICATION! Except as stated below, the ENGINEER shall rnrf/mnify and save harmless the OWNER from these claim!, losses, lawsuits or expense! caused directly by the ENGINEER1* sole negligent acta, errors or vmiTfii"TM with performance of the ENGINEER1* services hereunder. To the fallcst extent permitted by law, with respect to claims, damages, foeas and expanses which are related to hoxardau* waats or asbestos removal, disposal or cleanup or environmental liability, tha OWNER ahall Indemnify, save harmless and defend the ENGINEER from and against all auch claims, damages, losses or expenses, including attorney's fees, arising out of or resulting from the performance of the ENGINEER'S acrvicee, or claim* against the ENGINEER arising from work of ethers or claims arising out of or related to th presence of asbestos or hazardous substance* In th Prqject, LIMIT OF LIABIU'iKi To the fullest extent permitted by law, tho Owner agree* to limit the ENGINEER'S liability to the Owner and to all construction eontraetom or subcontractor* oa the prqjeci for any and all injuries, claim*, losses, expenses or damage* whatsoever arising out ofor in any way related to the prqjcct or this Agreementfrom aqy cause orcause* including but cot limited to the ENGINEtitfs negligent acta, errors, omissions, strict liability, breach ofcontract, or breach ofwarranty, each that the total aggregate of liability of the ENGINEER to all those named shall not exceed $60,000 or tha total fee for the ENGINEER'* servioo! rendered in ths prqjeot, whichever is greeter. Under no circumstances shall the ENGINEER be liable to the Owner for any consequential damage*, including but pot limited to Iona ofu*e or rental, loo* ofprofit or coot ofany financing however caused Including ENGINEER1* fault or negligence. C60763 0227 APR 26 '34 08=00 BAKER ENVIROMIENTBL/ INC, ( c P.5 COMPLIANCE Witri LAWi The ENGUNEEK dull comply with til applicable provisions of the usemtiVimeat oompeftoetian, slnlrnes* end disability end (facial Soaurity laws, the Fair Standard! Act end til other Federal, State and local laws or ragulstlnns relatingtoompfaymont. BisVERASLLIT'y: If any one or more of the provisions contained la tide AfMnwti far any reason, an hold to bo Invalid, illegal or unenfaroeable in toy raped, ooohinvalidity, illegality or oaonferooabllity die11 not afloat any otherproviaion Hereof and thUAgreement shall bo construed aa ifsueh Invalid,Illegal ornnanforcoohle provision had never beon contained herein. unfrUNlMB OP CLAIM3< In the event oft public hearing, arbitrationhraTingerproocrdlng telating in any Way to the Prujoct, the Pliant agree* to compensate the consultant far tho tim* devoted to preparing far litigation, responding to requests for production ofdoenments by any part^, appearance at depositions ortrial. or any othermatters Involving each hearings or legal proceedings. Compensation dull debased upon hourly rates mutually agreed tohy the parties prior to Consultant commencing such service*. This provision does not apply to legal action in whichConsultant ia anamed plaintiffor defendant in which event consultantshall appear on itaownfashalC 1V26/6S (Rev. 2/20/01) (Rev. 12/93) C60763 0228