1983 Executive Tour
Aberdeen Chemical Plant Aberdeen, MS
1983 ANNUAL REVTFW ABERDEEN CHEMICAL PLANT MARCH 15. 1983
TOPIC I, SAFETY II, ENERGY CONSERVATION III. EMPLOYEE EXPOSURE ABATEMENT IV. CASH FLOW PROGRAMS V. MAINTENANCE IMPROVEMENT PROGRAM VI. EMPLOYEE TRAINING VII. PRODUCT QUALITY PROGRAM VIII. COMPOUND/DRY BLEND/PLASTICIZER STUDY
PRESENTED BY AL SATHER PAUL KOBER PETE MARKEY JOE HIGGINBOTHAM RICK SNOWDEN PETE MARKEY RANDELL JACKSON DICK FROHREICH
DTH 000099819
DTH 0000998
INJURY FREQUENCY X1Q0
ABERDEEN CHEMICAL PLANT I)TH 000099821
SAFETY 1982 HIGHLIGHTS
X. INJURY TRENDS H. 3 YEARS - NO LOST TIME 1. PROGRAM IMPROVEMENTS
A. TEAM INVESTIGATIONS B. SAFETY MEETING RESTRUCTURING C. FOURTH QUARTER SAFETY REVIEW D. EMPLOYEE INVOLVEMENT
1. EMPLOYEE SAFETY ACTION REQUEST (ESARS)
2. PROJECT SAFETY AUDITS W. CONTRACTOR PROGRAM
A. GENERAL SERVICES CONTRACT B. CONTRACTOR SAFETY ORIENTATION C. SAFETY MEETINGS
DTH 000099822
-SAFETY 1983 PLANS
l. TRAINING - SAFETY MEETING H. EMPLOYEE ENVOLEMENT/
DEPARTMENTAL EMPHASIS A. ESARS / SAFETY AUDITS B. DEPARTMENTAL PROGRAM HIGHLIGHT m. CONTRACTOR PROGRAM A. CONTRACTOR ORIENTATION/ACCESS
CONTROL B. PLANT SAFETY EL FIRE PROTECTION A. IMPROVEMENT PROJECT B. P.M. PROGRAM
DTH 000099823
DTH 000099824
ENERGY PERFORMANCE HISTORY
- TEN YEAR PERFORMANCE - 1982 PERFORMANCE - 1981 vs 1982
DTH 000099825
DTH 000099826
1982 BUDGET vs 1982 PERFORMANCE ABERDEEN CHEMICAL PLANT
1982 BUDGETED ENERGY PERFORMANCE (PRODUCTION BASIS=454.2 MM LBS.)
PRODUCT MIX EFFECT PRODUCTION LEVEL EFFECT V-ll CENTRATE PROJECT DELAY V-10 CENTRATE HEAT RECOVERY FLUID BED ECONOMIZER
INCREMENTAL
MMM BTU/YR.
%
%ADJ. CMA
42.1
17.4 24.4 13.4
3.8 (3.8)
(0.9) (1.2) (0.7) (0.2) 0.2
ENERGY CONSERVATION ADMINISTRATIVE PROGRAMS
1. STEAM LEAK REPAIR PROGRAM, STEAM TRAP SURVEY PROGRAM, INSULATION PROGRAM
2. REDUCED AIR COMPRESSOR USAGE
3. REDUCED COOLING TOWER PUMP USAGE
(5.7)
02.3) (19.7)
1982 ACTUAL ENERGY PERFORMANCE (ACTUAL PRODUCTION = 406.4 MM LBS.)
0.3 0.6 1.0
41.2
DTH 000099827
1981 - 1983
DTH 000099828
A
1983 PLANS
REDUCED OPERATION PLAN BOILER OPERATION AIR CONSERVATION DRYER IMPROVEMENT CAPITAL PROJECTS
DTH 000099829
ENERGY CONSERVATION FORECAST - 1983
1982 ENERGY REDUCTION vs 1972 (CM A ADJUSTED BASIS)
INCREMENTAL MMM BTU/YR. %
1983 CHANGES vs 1982 PERFORMANCE
V-ll CENTRATE HEAT RECOVERY (7 MONTHS) BOILER BLOWDOWN HEAT REC. (4 MONTHS) V-10 CENTRATE HEAT RECOVERY(6MONTHS) FLUID BED ECONOMIZER (6 MONTHS) COLD WATER RINSE (3 MONTHS)
33.4 2.7 4.2 3.6 6.0
1.8 0.2 0.2 0.2 0.3
% ADJ. CMA
41.2
ENERGY CONSERVATION ADMINISTRATIVE PROGRAMS 8.0
1.STEAM LEAK REPAIR PROGRAM, STEAM TRAP SURVEY PROGRAM, INSULATION PROGRAM
0.4
1983 BUDGETED ENERGY REDUCTION
44.3
DTH 000099830
DTH 000099831
ABERDEEN PLANT EMPLOYEE CHEMICAL EXPOSURE REDUCTION PROGRAMS
I.1982 & 1983 Y.T.D. Exposure Statistics A. VCM B. Lead C. Particulates D. Other Sampling
II. VCM Exposure Problem Area & Programs A. Employee & Supervisory Awareness B. Employee Training C. Detection Problems D. Equipment Related Problems
III. Capital Project Work A. Recovery System Revisions B. Experimental RVCM Backflush Filter C. Exposure Reduction Project D. Emission Recovery System Upgrade E. 1984 Capital Projects Under Study
IV. Overview A. Where We Are B. 1983 Goals
DTH 000099832
1982 & 1983 Y.T.D. PERSONNEL DOSIMETRY DATA
VC M
% PERSONNEL DOSIMETERS ABOVE PEL
1st 6-MONTHSr1982 2nd 6 -MONTHS, 1982
11.4 8.4
JANUARY, FEBRUARY 1983
8.2
% OVEREXPOSED W/OUT RESPIRATORY PROTECTION
6.3
4.6
1.0
l EAD 1st 6-MONTH5,1982 2nd6-MONTHS, 1982 JANUARY, FEBRUARY 1983
5.3 4.0 3.4
PARTICULATES
1st 6-MONTHS, 1982 2ND6-MONTHS, 19 82 JANUARY, FEBRUARY 1983
5.1 4.0 0
0 0 0
0 0 0
DTH 000099833
CKM O
a
LLI __l
a.
<
co
1982 VC M OVEREXPOSURE
LEVEL OF VCM EXPOSURE (PPM)
Sil3i3WISOa 13NNOSd3d 30 %
DTH 000099834
VCM EXPOSURE REDUCTION TASK FORCE
SAFETY OPERATION MAINTENANCE ENGINEERING
DTH 000099835
VCM EXPOSURE REDUCTION
EMPLOYEE & SUPERVISOY AWARENESS EMPLOYEE TRAINING DETECTION PROBLEMS EQUIPMENT RELATED PROBLEMS
DTH 000099836
VCM EXPOSURE REDUCTION EMPLOYEE & SUPERVISORY AWARENESS
IMPROVING LEAK RESPONSE GETTING LEAKS REPAIRED ON A TOP
PRIORITY BASIS UPGRADING VCM EXPOSURE PRIORITY
WITH RESPECT TO OTHER PRIORITIES DEMONSTRATING MANAGEMENT
COMMITMENT
DTH 000099837
VCM EXPOSURE REDUCTION EMPLOYEE TRAINING
12 HOUR JOB STUDIES, ONE ON ONE. JSA's & PROCEDURE IMPROVEMENTS. MECHANICAL SEAL TRAINING. PORTABLE VCM DETECTOR TRAINING
-- OPERATORS. ----- I&E PERSONNEL. FIXED POINT MONITOR TRAINING --I&E PERSONNEL.
DTH 000099838
VCM EXPOSURE REDUCTION DETECTION IMPROVEMENTS
INVESTIGATING ALTERNATE PORTABLE MONITOR
RESOLUTION OF FIXED POINT MONITOR COMPUTER PROBLEMS -- COMPUTER PROBLEMS. --BEACON ALERT PROLEMS
IMPROVEMENTS TO FIXED POINT MONITOR --VCM TANK FARM TUBING.
ROUTINE LEAK SURVEYS --WEEKLY SURVEYS --6-MONTH COMPREHENSIVE SURVEY. -- LEAK RESPONSE.
SPECIAL DOSIMETRY STUDIES --PERSONNEL UNLOADING VCM CARS. -- SPECIFIC JOBS (l.E. FILTER PACK CHANGES, CONDENSER CLEANINGS)
DTH 000099839
VCM EXPOSURE REDUCTION EQUIPMENT RELATED PROBLEMS
VALVE & PIPING RELATED PROBLEMS --VALVE CHANGE OUT ACTIVITY. -- IMPROVE IN-HOUSE VALVE REBUILDING TECHNIQUES. "IMPROVE VALVE TO FACILITATE ON-LINE LEAK REPAIR. -- USE OF "LEAK REPAIR" CONTRACTOR. -- IMPROVED SHOP TEST PRIOR TO FIELD INSTALLATION. -- IMPROVE REACTOR HYDRO TEST. -- PLAN TO DEVELOP ON-LINE PIPING MANIFOLD TEST PROGRAM. -- DEFINE MEANS OF POSITIVE VALVE POSITION INDICATION.
MECHANICAL SEALS SYSTEM IMPROVEMENTS OPERATOR TRAINING
DTH 000099840
1982
ABERDEEN PLANT
VINYL AREA
VALVE CHANGE OUT AC TIVITY
i 100-L
-o4 o o
00 O "t
o CN
X 3Q NI A1IAI1DV IPO 3GNVHD 3A1VA ONITlOa H1NOW-C
DTH 000099841
VC M EXPOSURE REDUCTION CAPITAL WORK
recovery system revisions
EXPERIMENTAL RVCM BACKWASH FILTER
VCM EXPOSURE REDUCTION PROJECT
EMISSION RECOVERY SYSTEM UPGRADE
$402,000 CAPITAL, AFE 9771 CONSTRUCTION IN PROG. EST. COMPLETION 4thQRT.1983
TEST PACKAGE, Ml SC. UNDER $15,000 ENGINEERING COMPLETED EST. COMPLETION 3rdQTR.1983
$96,000 1983 CAPITAL BUDGET AFE 3RD QTR. 1983
$325,000 CAPITAL EST. COMPLETION DEC. 1983
POTENTIAL 1984 EXPOSURE REDUCTION PROJECTS
VCM TANK FARM UNLOADING COMPRESSOR REPLACEMENT
ADDITIONAL FIXED POINT MONITOR
DTH 000099842
1983 GOALS
Q i-- >co CO CN &
<
O
om
co co
CN
o
CN
CO O' O'
o
z z
a h-
LU
OC O Oa
CQ
<<
< >
LU
a,
<
u
+
CO 00 LU O'
LU "
QC u_
D LU
uo Z
om U
a.
cq
LU
I--
LU^ o
QC
Q_
>QC
OH-
<
O'
LU I) LU CO
^ ^> LcUn QO
UJ CQ LU
CO
Q
LU QC
- O
2
LU
Q OC
LL.
S3 !3o
X -Z LC q/
CO
00
co
<
"J z
Lu O
o "2
>-
CQ
o
V
<
<
Q_
0
CO
ea
uz
3
<
z
<
U_ u X
ou
CO
< 3Z
O^
Sis
DTH 000099843
DTH 0 0 0 0 9 9 8 4 4
2co CO
o LU oQ GQ
o Q.
uz>
u D
Q LU
<LU
OL
< UJ
LU Q C 2
O'
ID CO
2
O 2<> LU 2O
X <Q_ Q a. u
oLU
3 LU
Q LU O
% LU
u>
DTH 000099845
CASH FLOW IMPROVEMENT 1982 Results A. Fixed Costs
1. Payroll and Benefits 2. Maintenance Materials and Contracts 3. Other B. Variable Costs Efficiencies 1. Product Mix 2. Utilities 3. Raw Materials and Offgrade C. Inventories 1. 739 2. 744 D. Capital Expenditures 1983 Projections A. Fixed Costs B. Variable Costs Efficiencies C. Inventories D. Capital Expenditures
DTH 000099846
1982 CASH FLOW IMPROVEMENT RESULTS ABERDEEN CHEMICAL PLANT
CATEGORY
FIXED COSTS VAR. VARIABLE COST EFFICIENCIES VAR.
IMPROVEMENT TARGET $712
(1582)
INVENTORIES COMBINED DEVIATION FROM 12/82 TARGET
0
CAPITAL EXPENDITURES VARIANCE FROM P.O.
3237
TOTAL CASH FLOW IMPROVEMENT
$2367
$M
1982 ACTUAL $856 (760)
(4) 5639
$5731
VARIANCE FROM TARGE
$144 822
(4) 2402
$3364
DTH 000099847
1982 CASH FLOW IMPROVEMENT RESULTS ABERDEEN CHEMICAL PLANT
FIXED COSTS VAR. ($ Ml
COMPONET
TARGET
PAYROLL & BENEFITS
MAINTENANCE MATERIALS & CONTRACTS
$407 289
OTHERS
16
ACTUAL $809
218 (171)
TOTAL FIXED COSTS
$712
$856
VARIANCE $402
(71) (187) $144
DTH 000099848
1982 CASH FLOW IMPROVEMENT RESULTS ABERDEEN CHEMICAL PLANT
VARIABLE COSTS EFFICIENCY VAR.(SMI
COMPONENT
PRODUCT MIX
UTILITIES RAW MATERIAL & OFFGRADE
TARGET $(1645)
0
63
ACTUAL $(870) (64)
174
VARIANCE $775 (64)
m
TOTAL VARIABLE COSTS EFFICIENCI ES
$0582)
$(760)
$822
TYPE PIPE FITTINGS RP-1 00
DRY BLEND PRODUCT MIX
BUDGET
MM# ____&
40.0
80
5.0 10
5.0 50.0
10 100%
REFORECAST
.MM.___ %. 25.5 49.0
20.0 38.5
6.5 5 2.0
12.5 100.0%
ACTUAL -MM*. %
23.6 56.5
16.0 38.3
2.2 41.8
5.2
o oo
DTH 000099849
1982 CASH FLOW IMPROVEMENT RESULTS ABERDEEN CHEMICAL PLANT
INVEN TORI ES ($M)
COMPONENT
0739(MAINTENANCE & OPERATING SUPPLIES)
0744 (RAW MATERIALS & PROCESSING SUPPLIES)
TARGET $1410
1374
ACTUAL $1708
1080
TOTAL INVENTORIES
$2784
$2788
VARIANCE $(298) 294
000099850
dth
1982 CASH FLOW IMPROVEMENT RESULTS ABERDEEN CHEMICAL PLANT
TARGET $ 7099
CAPITAL EXPEN PIT UR ES($M)
ACTUAL $4697
VARIANCE $2402
CAUSES OF INCREASED SAVINGS:
ADDITIONAL DEFERRALS NOT APPROVED OR BEHIND SCHEDULE MATERIAL DELAY UNDER/OVER RUNS (NET) ESTIMATING ERRORS
$ 875
362 247 676 2.4 2, $ 2402
DTH 000099853-
1983 CASH FLOW IMPROVEMENT PROJECTIONS
FIXED COSTS PAYROLL & BENEFITS MAINTENANCE MATERIALS & CONTRACTS
$M
$200
0
VARIABLE COSTS UTILITIES RAW MATERIAL & OFFGRADES
INVENTORIES-COST SAVINGS ON PURCHASES
FROM FROM FROM
1982 ANALYSES 1982COMPETITIVE 1983COMPETITIVE
QUOTES QUOTES
CAPITAL EXPENDITURES
100 350
80 100 150
2205
DTH 000099852
DTH 000099853
MAINTENANCE IMPROVEMENT
DTH 000099854
WHERE WE ARE WHERE WE NEED TO BE HOW WILL WE GET THERE
WHERE WE ARE
DTH 000099856
INCREASING COMPLEXITY OF EQUIPMENT
LITTLE FORMAL TRAINING OPERATORS MECHANICS E.& I. TECHNICIANS
DTH 000099857
SUPERVISORY SKILLS
BEST ROTATING EQUIPMENT MECHANIC BEST GENERAL MECHANIC BEST ELECTRIC! AN
DTH 000099858
WHERE WE NEED TO BE
DTH 000099859
OPERATORS MECHANICS
MECHANICAL TRAINING INTRUMENTATION TRAINING
FORMAL IN-HOUSE TRAINING SUPPLEMENTAL OUTSIDE TRAINING
E&l TECHNICIANS
FORMAL IN-HOUSE TRAINING < SUPPLEMENTAL OUTSIDE
TRAINING
SUPERVISORS
RESOURCE MANAGEMENT PLANNING
DTH 000099860
HOW WE WILL GET THERE
DTH 000099861
ELECTRICAL & INSTRUMENTATION
THREE PRONGED ATTACK IMPROVE GENERAL SKILL LEVEL OF TECHNICIANS IMPROVE SKILLS IN PARTICULAR HIGH RISK AREA IMPROVE INSTRUMENTATION SKILLS OF SUPERVISOR
DTH 000099862
GENERAL SKILL LEVEL
TPC IN-HOUSE COURSE - 200 HOURS TAUGHT BY SUPERVISOR AND E& I ENGINEER RECOMMENDED BY MED AND DUPONT INSTRUMENT TRAILER (TAILORED FOR ABERDEEN)
HIGH RISK
MODICON SCHOOL ANALYZER SCHOOL
SUPERVISORY SKILLS
INSTRUMENTATION FOR ENGINEERS T PC COURSE PERSONAL INSTRUCTION
JIM BROWN - MED RANDY POLK- PLANT ELEC. ENG.
DTH 000099863
SUPERVISORY SKILLS
CRAFT DELAY STUDY- MED SUPERVISORY STUDY- MED WORK PLANNING AND RESOURCE UTILIZATION - MED (TAILORED FOR ABERDEEN)
DTH 000099864
WORK PLANNING DEFINING STEPS TO MAKE A SUCCESSFUL PLAN MAKING A PLAN MONITORING THE PLAN ONE-ON-ONE INSTRUCTION WITH PRACTICAL FEED BACK
DTH 000099865
MANAGES PRODUCTIVITY, NOT PRODUCTION MAXIMIZES UTILIZATION OF MECHANICS ENHANCES EFFECTIVE USE OF THE BACKLOG USED SUCCESSFULLY WITH BROWN & ROOT AT CHOCOLATE BAYOU
DTH 000099866
PREVENTIVE MAINTENANCE AUTOMOTIVE FIRE PUMPS
dth 000099867
MAINTENANCE AS A
CONTINUING INVESTMENT
DTH 000099868
DTH 000099869
ABERDEEN PERSONNEL TRAINING & DEVELOPMENT PROGRAM
I. Plant Hourly Employee Profile A. Department Breakdown B. Years of Service C. Education Levels D. Area Culture and Work Ethic
II. New Employee Screening, Selection and Training Program A. Pre-employment Testing B. Interview Process C. Orientation D. Probationary Period
III. Training Problems, Programs, & Philosophy A. Training Problems and Approach B. Safety C. Orientation D. Maintenance E. Laboratory F. Plant Wide
IV. Overview A. Comprehensive Program Definition
DTH 000099870
ABERDEEN HOURLY PERSONNEL PROFILE
X)1H 0 0 0 0 9 9 8 7 1
NEW EMPLOYEE APTITUDE TESTING
BENNETT MECHANICAL COMPREHENSION RBH TEST OF LEARNING ABILITY RBH SHOP ARITHMETIC
DTH 000099872
NEW EMPLOYEE ATTITUDE TESTING
INTERVIEW PERSONNEL DIRECTOR INTERVIEW DEPARTMENT HEAD INTERVIEW 2nd LEVEL SUPERVISOR
DTH 000099873
ABERDEEN PVC PLANT NEW EMPLOYEE SAFETY ORIENTATION
TRAINING CHECKLIST
(1) ABERDEEN SAFETY ORIENTATION SHOW
(2) HEALTH SHOWS: VCM LEAD TOSCA
(3) SAFETY RULE BOOKS: CONOCO ABERDEEN
(b) DuPONT SAFETY ORIENTATION (#500)
(5) LIFTING: NSC BOOKLET DISCUSSION
(6) FORKLIFT TRAINING: SHOW FIELD
(7) ELECTRICAL LOCKOUT: ALLIED CHEMICAL FILM REVIEW OF ABERDEEN LOCKOUT PROCEDURE
(8) RESPIRATOR TRAINING: SCOTT AIR PACK FRESH AIR DUST
(9) EQUIPMENT ENTRY: CHARTER OIL FILM REVIEW OF ABERDEEN ENTRY PROCEDURE
(10) PICTURES TAKEN
(11) SAFETY EQUIPMENT ISSUED
(12) ALL QUIZ SHEETS CORRECTED AND ATTACHED
(13) INTRODUCTION TO PLANT MEDICAL
TRAINEES
(1) (7) (2) (8) (3) (9)
(A) (10) (5) (10 (6) (12)
DATE:
DTH 000099874
APPRAISAL CHECK LIST
Attribute
Exceptional (Excel lent. Approaches Best Possible)
Good (Above Stand ard)
Averaqe (Meets job re quirements; Standard)
Fair (Below stand ard; Improve ment Needed)
Unsatisfactor>
(Deficiency may justif terminatio
SAFETY
Knowledge, attitude & practice of safety rules
Automatically works safety into job. Pro * motes safe practices.
Works safely. Sets good Example.
Reasonably Safe Worker
Occasional
Careless worke
lapses in
Accident re
observing safe peater. rules and practices.
i
WORK ATTITUDE General at titude toward job, company, & supervisor.
Displays ex traordinary enthusiasm and cooper ation.
Shows con siderable interest 4 cooperation.
Shows Inter est 4 cooper
ation normally expected.
Occasionally appears in different.
Works half
heartedly. No
Interest In
performing job
Limited cooper
ation.
j--
INITIATIVE Ingenuity, self-reliance resourceful ness, In doing the job.
QUANTITY Volume and rate of work handled. Com pare with others on same job.
OUALITY Accuracy & thoroughness of work. Con sider supervision required.
JOB KNOWLEDGE
General knowledge of job.
ABILITY TO LEARN Ability to learn & re tain new ideas,ability to do unre lated tasks. ATTITUDE TOWARD OTHERS Willingness to work as team member.
Self-starter: Resourceful,
Seeks addi
looks for
tional tasks; shortcuts to
suggests im
improve his
provements.
work.
r
Demonstrates unusual speed, volume & capacity for work.
Fast, efficien t; output exceeds job require ments .
Unusual ac curacy; ex pert work manship. .
High quality work; thorough 4 neat.
Does regular work without direction; occasionally suggests changes. |
Output satis fies job requirements.
Follower: Sometimes needs proding.
Usually waits to be told; needs constant supervision.
rr
Output be low normal job requirement.
Very slow work er; wastes time; output inadequate.
r1
Work satis fies quality requirements of job.
Quality be low standard; occasional errors.
r
Frequent erors made; excessive re work,wasteful .
r
Exceptionally well in formed. Can
Well informed on all phases of job.
Knowledge satisfies re-
quirements
handle com
of job.
plex jobs.
r
Lacks requir ed knowledge in parts of job.
r
Knowledge inadequate. Doesn't know job.
rr
Excellent;
Understands new Understands 4 Instructions Learns very
Understands & information
retains
must often be slowly. Dif
applies in structions
quickly 4 accurately.
instructions adequately.
repeated. Learning be
ficult to adjust to
quickly & ac
low standard. changes.
curately.
r
r rr r
Unusual abil- Always cooper
Normally
Sometimes
Uncooperative;
i ty to. work
ative and
cooperative. difficult
causes dis-
with & favor
friendly.
to work with. sention, upset
ably influenc e
morale of
others.
others.
j
Attendance Includes all aspects such as promptness In returning from breaks.
Perfect at
Rarely absent; Good attend
tendance.
always prompt
ance. Seldom
Never late;
in returning
requests PB;
on the job
from breaks.
normally
early.
r
r prompt returning from breaks
Attendance
Poor attendanc
record re
excessive PB;
quires im
always late*re
provement;
turning from
Must be re
breaks.
minded to (--
end breaksJ
1
THE EMPLOYEE MUST BE RATED IN EACH AREA.
dTH 000099876
ABERDEEN TRAINING
ON GOING TRAINING A LINE FUNCTION DEVELOPMENT OF COMPREHENSIVE
TRAINING PROGRAM PRIORITES METHODS TIMING FUNDING
DTH 000099877
ABERDEENS BIGGEST TRAINING
PROBLEMS
VINYL STANDARDIZATION OF METHODS LACK OF FULLY DOCUMENTED PROCEDURES & POLICIES
COMPOUND, DRYBLENP, PLASTICIZER STANDARDIZATION OF METHODS LACK OF FULLY DOCUMENTED PROCEDURES & POLICIES
MAINTENANCE I & E SKILLS LAGGING BEHIND TECHNOLOGY SUPERVISION, PLANNING & SCHEDULING SKILLS
LABORATORY STANDARDIZATION OF TECHNIQUES UNDERSTANDING IMPACT OF QUALITY TEST ON PRODUCT
OTHER CROSS TRAIN LNG
DTH 000099878
ABERDEEN PERSONNEL TRAINING SAFETY
SAFETY SECONDS PROGRAM SERIES ------ ATTITUDE ------ PLANNING ------ HOUSEKEEPING
FIRE FIGHTING SCHOOL ------ TEXAS A&M, LAMAR
SUPERVISORY 1st AID TRAINING ------ MEDICAL DIVISION
DTH 000099879
ABERDEEN PERSONNEL TRAINING OPERATIONS
VARIABILITY TEST RUNS ------- VINYL -------COMPOUND
OPERATING MANUAL IMPROVEMENTS
SPECIAL TRAINING ------ INSTRUMENTATION ------ MECHANICAL SEALS ------- YARD TRAINING
TRAINING METHODS UNDER CONSIDERATION ------ CONSULTANT, MTS ------- API PILOT SERIES BY HOWELL TRAINING EQUIPMENT OPERATION ------- PROCEDURAL SIGNS
DTH 000099880
ABERDEEN PERSONNEL TRAINING MAINTENANCE
IMPROVE I & E SKILLS IMPROVE MECHANICAL KNOWLEDGE IMPROVE SUPERVISORY SKILLS
------ PLANNING ------ SCHEDULING
DTH 000099881
ABERDEEN PERSONNEL TRAINING LABORATORY
WORK TOWARD STANDARDIZATION OF TECHNIQUES ------ SUPERVISORY MONITORING ------ VALIDATION STUDIES ------ ROUND- ROBIN TESTING, PONCA , OKC
DEFINING HOW THEIR WORK FITS INTO "BIG PICTURE" & FINISHED PRODUCT ------ PRESENTATION TO LAB EMPLOYEES
DTH 000099882
ABERDEEN PERSONNEL TRAINING PLANT WIDE
SUPERVISOR IDENTIFICATION PROGAM LOOKING FOR IMPROVEMENT
METHODS
DTH 000099883
DTH 000099884
90
S
\ \
COMPLAINT HISTORY
\ \
ABERDEEN CHEMICAL PLANT
80' '
1978 through 1982
\
\
\
\
\'
\
\
70- \
v
\ \ \
\
\
60"
50-
40-
30-
20-
10 PLANT JUSTIFIED COMPLAINTS ---------
TOTAL COMPLAINTS
O-------- -O
I
1978
T"
1979
1980
DTH 000099885
T
1981
1982
SPECIFICATION WAIVER HISTORY
WAIVER PER M M LBS SHIPPED
RESIN QUALITY/.SERVICE IMPROVEMENT PROJECTS AND NEEDS
1. PARTICLE SIZE 2. CONTAMINATION 3. INDUCTIVE RESISTANCE (ELECTRICAL) 4. OFF- GRADE REDUCTION 5. INVENTORY LEVELS-SPECIALTY RESIN
DTH 000099887
COMPOUND/ DRY BLEND QUALITY IMPROVEMENT PROJECTS AND NEEDS
FLEXIBLE COMPOUND 1. METAL CONTAMINATION 2. PRODUCT CROSS CONTAMINATION 3. COMPOUND HARD PARTICLE PROBLEM
RIGID DRY BLEND QUALITY CONTROL TESTING OF RP PRODUCTS
DTH 000099888
PRODUCT QUALITY MEASUREMENT TOOLS
1. COMPETITIVE RESIN SURVEY 2. CUSTOME R COMPLAINTS 3. PRODUCT QUALITY ACCOUNTING
a) A- GRADE - PRIME b) WAIVED c) B- GRADE-(OFF SPEC) d) H - GRADE - (OFF SPEC PACKAGED) e) SIFTER OVERFLOW
4. RESAMPLING/ CLEAN- OUT MONITORING PROGRAM
5 . REPROCESSED MATERIAL- COMPOUND B.C.
DTH 000099889
DTH 000099890
COMPOUND, PLASTICIZER, DRYBLEND STUDY
OBJECTIVES
1- TO DETERMINE THE MANUFACTURING COST OF EACH PRODUCT PRODUCED IN THE COMPOUND, PLASTICIZER & DRYBLEND OPERATION.
2- TO DETERMINE HOW TO BEST SPEND CAPITAL MONEY IN THESE AREAS
DTH 000099891
1982 ACTUAL FULL ALLOCATION PLANT FIXED COST
X DEPRECIATION
__________________ $ M____________________
RESIN 6,92 5
COMPOUND 2,402
PLASTICIZER 516
DRYBLEND 1,078
TOTAL 10,921
DTH 000099892
1982 ACTUAL FIXED COST ALLOCATION COMPOUND/PLASTICIZER BUSINESS
PLANT FIXED COSTS X PLANT FIXED COSTS
___________ $ M
FULL ALLOCATION
2,918 1,751
INCREMENTAL ALLOCATION
2,7 8 3
893
DTH 000099893
COMPOUND: 00<t 16851CB50 LINE 3 AVERAGE PRODUCTION RATE: 4573 LBS/HR
RAW MATERIALS
665 5385 RESIN 631 DOP 815 SOYA EPOXY 397 BAR-CAD-ZINC 327 STEARIC ACID 954 4310-R1 BLUE
CENTS/UNIT
17.510 51.210 47.144 95.428 51.426 242.143
UNIT/LB
0.77990 0.17145 0.03126 0.02350 0.00229 0.00020
CENTS/LB
13.656 8.780 1.474 2.243 0.118 0.048
SUBTOTAL
PROCESSING GAINCLOSS) H GRADE MILL SCRAP
SUBTOTAL
ELECTRICITY NATURAL GAS
TOTAL VARIABLE COST
PLANT FIXED COST EX-PLANT FIXED COST
TOTAL FIXED COST
TOTAL COST EX PACKAGING
PACKAGING COSTS BAGS BOXES BULK
TOTAL COST
6.500 6.500
3.886 0.397
1.00860 26.318
(0.00350)
(0.0
) (0.0 )
(0.00510) ( 0.033)
1.00000 26.285
0.19522 0.11482
0.759 0.046
27.089
7.136 4.309
11.445
38.535
1.695 2.601 0.0
0.03680 0.0
0.96320
0.062 0.0 0.0
38.597
DTH 000099894
NO. 3 4 0 -1 0 D IETZG EN GRAPH PAPER
D IE T Z G E N C O R P O R A T IO N