Document zoRGZpXDYy9z35pZxKwzVJyam

JOC P. TANNtR CoflrviVQi'iJ' J. ItONARO LEtXTE TTtR Divltion Difccio' of jShituvnl ^acsoovcc ENVIRONMENTAL PROTECTION OIVISION ?70 WASHINGTON SinrfT 5 W ATLANTA. GFORG'A 3033-J November 10, 1976 MEMORANDUM 0tdff,TO: 3, L. Ledbettter \ G. B. Welsh FROM: W. M. 3erniganvQ^ RE: General Electric Company P.oine - Floyd County On November 8, 1976, I contacted Richard Lester of the above company to inquire about the status of several housekeeping improvements which he had previously indicated would be undertaken to reduce potential PCB leachate in storm water runoff from the plant grounds. He will provide a letter confirming that the following items have already been completed and do not need inclusion in any future NPDES permit schedule of compliance: 1. The soil along the west and south sides of the pyranol storage dike has been paved. 2. North bank of the drainage ditch for discharge 001 has been concreted from the Parshall flume to the oil/water separator. 3. The ditch for discharge 004 has been concrete lined from the end of the storm sewer outfalls to the fence line. WM3:mg HONS 030547