Document zoREJjb8zN6Q3Q5Z8pKyDx01a

FILE NAME Allied Signal Bendix ASB DATE 1979 Jan 5 DOC ASB093 DOCUMENT DESCRIPTION Memo RE Results of Asbestos Air Monitoring Nov 1978 Internal Memorandum Date January 5 1979 / Gordon Detenbeck OXMET I NO peo A : No. Letter No. Oo, A. mo nay oe . ; ; AF AIRS Executive Offices AFFAIRS Southfield AFFAIRS AFFAIRS URBANURBAN From Ben Wong Subject 2 November Results of asbestos air monitoring ang ra 1 oy 14 15 1978 aw Outlined in the following are the results of the air monitoring 33 conducted for asbestos along with a comparison of previous sampling sampling results The results show that exposure concentration has remained insignificant from both an occupational health and legal viewpoint As always please retain the results for documentation purposes The majority of samples are breathing zone samples which is most indicative of employee exposure It is cautioned that area samples because they are not mobile like the employee are indicative of contamination sources only and not personal exposure Overall housekeeping in the asbestos areas was noted to be good However the one problem area remains to be the bagging enclosure area of the dust collector Accumulations of asbestos dust was still noted and it was learned that outside contractor bag house cleaning operators were not equipped with proper personal protective gear It is extremely important from liability aspect that the dust collector area is as free of asbestos accumulations as possible and that dust collector cleaning operators are equipped with proper protective gear AREA OR OPERATION Prince Road Plant June 26 28 1978 Pack & Inspection S. Zaus Hand line .21 cc 1st J. Shoe Assembler Trisan Hand line .28 ec Stockman Hand line Z. Duchnowski .06 cc 2nd S. Shoe Assembler Lustig lland line .10 cc Pin P. & Lever Brunett Hand line .09 cc November 14 15 1978 .064 cc S. Kawa - refused to be sampled .017 cc D. Piper .11 cc G. Verkie 80-631-6989 PLAINTIFF'S 80-631-6989 80-631-6989 EXHIBIT 80-631-6989 758 PENGAD PENGAD {PilLegilal Memorandum Date January 5 1979 Page -2- Letter No. Prince Road Plant continued Second Holddown Area Sample 15 behind shoe & lever Argyle Road Plant Grinder Line 1 M. Bryant Grinder LIne 4 C. Scandale Grinder Line 2 F. Bonofiglio Inspection Lines 3 & 4 J. McCann A. Tortola Riveter Line 5 J. Pisani Sweeper S. Moroz Repair and Rework M. Kajan Drilling M. Bryant Stockman N. Nadon Inspection Line 1 P. Dunn Area auto Sample top of drill control panel .14 cc .15 cc .10 .10 cc .07 cc .10 cc .03 cc .12 cc .10 .10 cc .013 cc J. Renand .018 cc .024 ec C. Guiseppe Not operating Not operating .24 cc D. Jacques .44 cc M. Jezom .22 cc J. Marra .039 cc .018 cc .025 cc Internal Memorandum Date January 5 1979 Page -3- Letter No. Area Sample outdoor dust collector .04 cc .26 cc BW cc R. M. Robbins T. C. Schaefer