Document zoLVk4EBJr7pwBvEz76a47V6R

AROCLORS 1972 PRODUCT GROUP OBJECTIVES COSTS: QUANTITY: QUALITY: ENVIRONMENTAL CONTROL: SAFETY AND HOUSEKEEPING: 1. Achieve the following total product costs per cwt Aroclors(811.00):S _________ Aroclor 10l6[8ll.04):$ MCS-1109 (811.12)4 Pyranols (81O.90):? ____ These unit costs are based on the 1972 cost standards, budgeted variances, other costs known as of 2/1/72, and the budgeted sales. This "base data" is included on the work plan. 2. Meet demand of current market area. 3.. Encourage the business group to utilize V'GK 'capacity. 4. Maintain present bulk quality and Improve quality of drummed products. 5. Maintain PCB losses to the sewer from Dept. 246/2 at 0.5 lbs./day or less. 6. Cooperate in any V.'CK effort to reduce estimated co^st of secondary waste treatment plant. 7. No serious or disabling injuries. 8. A minor injury index of 2.5. (This is equivalent to 0.5 minor injuries per man per year, or 12 minor injuries in Dept. 246). The index applies to both Production and Mair.ter.r.nc: 9. AA-i average in housekeeping. HONS 040648 WORK PLAN ' COSTS: Action The budgeted variances are: Page ] Responslbi lity EPC ` J. Reduce three operators(based on current 1972 forecast) 1972 Savings $18,000 Annual Savings $36,000 Probability 305 2. Re-evaluate need for an improved drumming facility. (possible reduction of one operator) 1972 Savings $ 3,000(install by 10/1) Annual Savings $12,000 Probability 305$ 3. Rework all obsolete FR-1 into a salable product. ft. Closely monitor 91-, 92-, and 93expenditures in order to achieve an actual of $ft8,000 vs. a cost standard . of $78,000. 5. Install facilities for installing and removing equipment on Aroclor column 6. Install permanent 6eal flush line to lime slurry pump. QUANTITY: 1. Define alternatives and cost for increasing column capacity for KCS-1109 or other monocnlorobiphenyl product. 2. Evaluate need for increased continuous chlorinator capacity(in conjunction with planned manpower reduction). 3. Install Inerteen 70/30 mix tank. Production TS1) Maintenance Production Production Maintenance Maintenanc e TSD Production Production Maintenance Maintenance 7/1/7 5/1/7 6/1/7 All Year TBD 2/1/7 TDD 5/1/7 i M0NS 040649 QUALITY: Action 1. Establish drummed product quality control. 2. Install facilities or procedure for providing necessary quality for ''Highly Refined Aroclor 1016". 3. Complete current drum test(R. H. Munch). 4. Install facilities to upgrade electrical properties of TCB and TTCB. 5. Re-establish blow tank level control. 6. Establish formal specifications on Aroclor 1016 and MCS-1109- Update all other specifications. 7. Write SMP'6 for Aroclor 1016 and MCS-1109. 8. Install Instrumentation for measuring column reflux. 9. Continue, present process control program. 10. Correlate methyl biphenyl in biphenyl with TCC's in Aroclor 1242 and 1016. ENVIRONMENTAL CONTROL: , 1. Install Montar transfer facilities. 2. Complete north sevter. 3. F.xpand south settling basin. 4. Install new 4-Z sewer and establish necessary routine sampling. 5. Na blanket 7/2 and #3 Mix Tanks. 6. Continue in-dept. PCB process control. 7. Complete project package for scrubbing MCS-1109 off-gs.s. C. Evaluate need for knock-out tank upstream from column vacuum Jct(or other emission control system). Pti;r* P ResponsibleIty Knc Production TSD Production Maintenance Production TSD Maintenance TSD Maintenance Production 3/1/7 7/1/7. 4/1/7. 7/1/7. 4/1/7 6/1/7. Production Production CED Maintenance Production TSD 7/1/7-. 7/1/7: All Year 5/1/7 TSD Maintenance Maintenance Maintenance Maintenance- Maintenance Production CED TSD 5/1/7 2/1/7 3/1/7 TED 2/1/7 All Year 4/1/7 6/1/i MUNS 040650 I Ac'*'*011 environmental CONTROL: (Cont'd.) 9. Define alternatives and costs for reducing department city water usage. 10. Implement business group decision to use a heavier drum for Aroclor production. 11. Provide pump repair shop in Dept. 2>(6. SAFETY AND HOUSEKEEPING: . 1. Carry out safety program as outlined to G. L. Bratsch on 12/6/71. 2. Alter FeCl, addition line to continuous chlorinators. Page 3 Responsibi.! Lit EDO TSD Production Maintenance VJ/Y 2/1A TBD Production Production TSD Maintenance All Year 7/1/7 040651 HONS 1/31/7 1972 FORECAST For calculating targeted unit costs for 1972, the following forecast for 1972 was used: Aroclors(83l.oo): 1221 1232 1252 1258 1255 1260 0.3 lbs. S:I 0.1 9.0 1.3 19.5 M lbs. Aroclor 10l6(8ll.04): Pyranols(8l0.90): 17.7 M lbs. Inerteen PP0(8l0.92) A13U3B(8l0.97) Inerteen 70/30(810.98) Inerteen 54201 C.M(8ll,10) 0.6 fl lbs. 2.0 8.2 M 16.2 fl lbs. HONS 040652