Document zoLVk4EBJr7pwBvEz76a47V6R
AROCLORS 1972 PRODUCT GROUP OBJECTIVES
COSTS:
QUANTITY: QUALITY: ENVIRONMENTAL CONTROL: SAFETY AND HOUSEKEEPING:
1. Achieve the following total product costs per cwt
Aroclors(811.00):S
_________
Aroclor 10l6[8ll.04):$
MCS-1109
(811.12)4
Pyranols (81O.90):?
____
These unit costs are based on the 1972 cost standards, budgeted variances, other costs known as of 2/1/72, and the budgeted sales. This "base data" is included on the work plan.
2. Meet demand of current market area.
3.. Encourage the business group to utilize V'GK 'capacity.
4. Maintain present bulk quality and Improve quality of drummed products.
5. Maintain PCB losses to the sewer from Dept. 246/2 at 0.5 lbs./day or less.
6. Cooperate in any V.'CK effort to reduce estimated co^st of secondary waste treatment plant.
7. No serious or disabling injuries.
8. A minor injury index of 2.5. (This is equivalent to 0.5 minor injuries per man per year, or 12 minor injuries in Dept. 246).
The index applies to both Production and Mair.ter.r.nc: 9. AA-i average in housekeeping.
HONS 040648
WORK PLAN
' COSTS:
Action
The budgeted variances are:
Page ] Responslbi lity EPC
` J. Reduce three operators(based on
current 1972 forecast)
1972 Savings
$18,000
Annual Savings $36,000
Probability
305
2. Re-evaluate need for an improved
drumming facility.
(possible reduction of one operator)
1972 Savings
$ 3,000(install by
10/1)
Annual Savings $12,000
Probability
305$
3. Rework all obsolete FR-1 into a salable product.
ft. Closely monitor 91-, 92-, and 93expenditures in order to achieve an actual of $ft8,000 vs. a cost standard
. of $78,000.
5. Install facilities for installing and removing equipment on Aroclor column
6. Install permanent 6eal flush line to lime slurry pump.
QUANTITY:
1. Define alternatives and cost for increasing column capacity for KCS-1109 or other monocnlorobiphenyl product.
2. Evaluate need for increased continuous chlorinator capacity(in conjunction with planned manpower reduction).
3. Install Inerteen 70/30 mix tank.
Production
TS1) Maintenance
Production Production
Maintenance Maintenanc e
TSD Production Production Maintenance Maintenance
7/1/7
5/1/7
6/1/7 All Year TBD 2/1/7
TDD 5/1/7
i
M0NS 040649
QUALITY:
Action
1. Establish drummed product quality control.
2. Install facilities or procedure for providing necessary quality for
''Highly Refined Aroclor 1016".
3. Complete current drum test(R. H. Munch).
4. Install facilities to upgrade electrical properties of TCB and TTCB.
5. Re-establish blow tank level control.
6. Establish formal specifications on
Aroclor 1016 and MCS-1109- Update all
other specifications.
7. Write SMP'6 for Aroclor 1016 and MCS-1109.
8. Install Instrumentation for measuring column reflux.
9. Continue, present process control program.
10. Correlate methyl biphenyl in biphenyl with TCC's in Aroclor 1242 and 1016.
ENVIRONMENTAL CONTROL:
, 1. Install Montar transfer facilities.
2. Complete north sevter. 3. F.xpand south settling basin.
4. Install new 4-Z sewer and establish necessary routine sampling.
5. Na blanket 7/2 and #3 Mix Tanks. 6. Continue in-dept. PCB process control.
7. Complete project package for scrubbing MCS-1109 off-gs.s.
C. Evaluate need for knock-out tank upstream from column vacuum Jct(or other emission control system).
Pti;r* P
ResponsibleIty Knc
Production
TSD Production Maintenance
Production
TSD Maintenance
TSD Maintenance
Production
3/1/7 7/1/7.
4/1/7. 7/1/7. 4/1/7 6/1/7.
Production
Production CED Maintenance Production
TSD
7/1/7-.
7/1/7:
All Year 5/1/7
TSD Maintenance Maintenance Maintenance Maintenance-
Maintenance Production
CED
TSD
5/1/7
2/1/7 3/1/7 TED
2/1/7 All Year 4/1/7
6/1/i
MUNS 040650 I
Ac'*'*011
environmental
CONTROL: (Cont'd.)
9. Define alternatives and costs for reducing department city water usage.
10. Implement business group decision to use a heavier drum for Aroclor production.
11. Provide pump repair shop in Dept. 2>(6.
SAFETY AND HOUSEKEEPING:
.
1. Carry out safety program as outlined to G. L. Bratsch on 12/6/71.
2. Alter FeCl, addition line to continuous chlorinators.
Page 3
Responsibi.! Lit
EDO
TSD Production Maintenance
VJ/Y 2/1A
TBD
Production
Production TSD Maintenance
All Year
7/1/7
040651 HONS
1/31/7
1972 FORECAST
For calculating targeted unit costs for 1972, the following forecast for 1972 was used:
Aroclors(83l.oo):
1221
1232 1252
1258 1255
1260
0.3 lbs. S:I
0.1 9.0 1.3
19.5 M lbs.
Aroclor 10l6(8ll.04): Pyranols(8l0.90):
17.7 M lbs.
Inerteen PP0(8l0.92)
A13U3B(8l0.97) Inerteen 70/30(810.98) Inerteen 54201 C.M(8ll,10)
0.6 fl lbs. 2.0
8.2
M
16.2 fl lbs.
HONS 040652