The following conditions must be satisfied before attempting to add chlorine to the CPC reactor.
----- 1. Charts on time and inking.
----- 2. Check vaporizing float status, (inlet warm, chest pressure okay) Record chest pressure __________ psig.
---- 3. Steam tracing on to surge drum, vaporiser outlet piping, C12 flow, etc.
-- 4. Liquid chlorine header pressure at 130-160 psig.
----- 5. CPC vents reset to an operating incinerator.
----- 6. Steam to reactor at normal operating rate.
----- 7. Reflux pump operation normal. S( plitter not flooded. ----- 8. Test CPC computer alarm okay.
----- 9. Check for condensate in 50# steam to vaporizer.
----- 10. Record 50# stm to vaporizer temp (TE1007) . Must be >280 degrees.
----- 11. Check surge drum inlet temp (TE1010) > 125 degrees. Record .
----- 12. Check surge drum bottom temp (TE1014) > 125 degrees. Record .
----- 13. AIBN addition started. Time .
----- 14. Set chlorine FCV and PCV closed on the board.
----- 15. Notify Liquefaction (2564) that you intend to take chlorine.
BATCH _________ LEAD OPERATOR OPERATOR
CONFIDENTIAL^ 0rder cc-rt
of 14th No. 91-1145
SL 001333
CPC STARTING CHLORINE FLOW CHECKLIST
Pre-chlorination checklist completed okay.
1--2. RESET SDS/BY-PASS SDS/switch to RUN mode.
0 3. Unblock valves at C12 FCV and reactor column. Be sure PCV is manually blocked.
1 4. Raise steam to vaporizer chest to 5-6 psig.
I/O ----- 5. Stroke PCV to check for proper operation/close.
0 ---- 6. Unblock PCV.
I 7. Open PCV slowly on manual to pressure the surge drum.
0 Observe the pressurization from outside.
I 8. Put PCV on automatic at 70-75 psig.
I 9. Crack chlorine FCV to start chlorine to the CPC reactor at 3000 SCFH. RecordTime.
I Observe chlorine temps closely for increase as chlorine is added.
0 Check vaporizer outlet TI and line pressure as chlorine is added.
I ----- 10. Line flow out at 3000 SCFH for 10 minutes.
0 -----
Check splitter color/flood @ 3000 SCFH.
I ----- 11. Begin using the C12 start-up logsheet. a> hold at 3000 SCFH for 10 minutes. b> hold at 5000 SCFH for 10 minutes. c> hold at 7500 SCFH for 15 minutes. d> raise to operating rate (10000-11000 SCFH)