Document zo7NB98rQ21Y0w1DDRLVqrEV6
ntwoflkt Communication
To:
From: Data: Subject:
T. H. Huffman
RECEIVED
MUS 2 9. 90
D. C. Skokna March 26, 1990
WILLIAM L. McCLAlN
ABERDEEN MONTHLY PROGRESS REPORT FEBRUARY, 1990
VIS1A
Safety
There were no injuries reported during February. At month's end, the Aberdeen plant's employees have worked 3891 days (5,168,371 manhours) since the last lost time injury.
FY 1990 Kev Statistical Information
February
Y.T.D.
PVC Production, MM Lbs. Reactor Stream Factor, % Resin Quality, % Prime VCM Efficiency, Lbs./Lb. Flexible Compound Production, MM Lbs. Flexible Compound Quality, % Prime Rigid Compound Production, MM Lbs. Rigid Compound Quality, % Prime Plasticizer Production, MM Lbs. Plasticizer Quality, % Prime Energy Use, (EUI, %) Fixed Cost Variance, $M Variable Cost Efficiency Variance, $M
Canacitv Utilization Factors
36.5 92.5 95.3 1.0055
6.1 98.1 ' 4.3 99.4
1.3 91.0 < 17.0> 121.8 < 24.2>
179.5 84.8 96.5
1.0007 29.8 98.0 21.4 99.4 6.9 89.8
< 13.4> 141.2 243.8
Resin Flexible Compound Rigid Compound Plasticizer
Operations
105.6
69.0 93.2 73.3
95.4 76.1 99.4 77.0
Initial testing of a proprietary clean wall agent in the resin unit was completed. Results are promising.
Demand for flexible compound continued strong in February and production schedules were tight all month. Line I ran forty-eight hours on PLENEX polymers trials. On Line V, a test run was done to optimize screw configuration for rigid compound production.
CCR 000006260
T. H. Huffman 3/26/90 Aberdeen Monthly Progress Report - February, 1990 Page 2
The dry blend unit set a new single day record on 2/1 producing 378.4M pounds; the previous record was 356.6M pounds. Dry blend orders continued to be strong during the month.
A 10M-pound sample of foamed sheet dry blend was produced for Vycom. During the run, an experimental design (varying batch size and drop temperature) was done.
Costs
Variable costs were above budget, primarily due to product mix in compound and above budget raw material usage in the plasticizer .unit.
Fixed costs were below budget due primarily to good results in the MM&C category and less than budget expenditures in some of the miscellaneous items.
QMP
1. Ninety-five percent of the plant's natural teams met during February.
2. The Old Module Recovery Team made its management
presentation.
They recommended revisions that
resolve some safety concerns experienced main
taining the compressors and vacuum pumps in this
system. A capital request ($60M) will be submitted
in the third quarter to implement these
recommendations.
This team found very cost-
effective ways to correct the safety problems.
Previous estimates to correct the same problems
were about $500M.
3. El Paso PVC (a division of Group Dekko) visited the plant on 2/9 to become familiar with our plant. They purchase 5415.
4. An experimental design was done in the dry blend unit to evaluate the effect of batch size and drop temperature on blowing agent dispersion in foamed sheet dry blend (for Vycom).
ooooo^V CCS-
T. H. Huffman 3/26/90 Aberdeen Monthly Progress Report - February, 1990 Page 3 QMP - continued
5, On Line III, an experimental design was done to determine how temperature and shear affect fusion delay.
Doug Skokna Plant Superintendent rah
CCr 0000626i
DISTRIBUTION Houston
J. D. Bums
COVER LETTER X
ENTIRE REPORT
R. T. Ferrell
X
T. H. Huffman
X
C. J. Matson
X
D. F. Harman H,, R. FIaminer
.--j.
X X
R. R. Smith *
B. J. Bean
X X
R. H. Gerlach
X
R. D. Gamblin
X
K3E3?HcClal3
X
J. P. Stokes
X
Austin
R. L. Poe
X
H. J. Hall
X
Oklahoma Citv
H. D. Garrison
X
LCVCM Plant
R. A. Conrad
X
LCCP Plant
J. Friend
X
LCIAB Plant
J. W. Ware
X
Baltimore
L. R. Bauer
X
Hammond
J. Pavao
X
Blane Premiere Aberdeen
C. R. Miller
P. L. Foote
RWS/DCS (File Copy), JEB, JME, SCH, MRK, JEL, DAM, RBN, JEN, JDO, REP, BLT
X X
ooooof*163
cc*
SAFETY - B. L. Trego, J. V. Uptain
February
Fiscal Y.T.D. 1990
Fiscal Y.T.D. 1989
First Aid OSHA Recordable
Total Injuries
0 -
0
66
JL
98
Number of Restricted Workday Cases
0
2
1
Number of Lost Workday Cases
0
0
0
Injuries bv Department
Vinyl Operations Compound Operations Maintenance Laboratory Receiving/Warehouse Office
Totals
0 0 0 0 0 0 0
Injuries bv Tyne
Cuts and Abrasions Eye Injuries Bums
Bruises Strains/Sprains Stings Other
Totals
0 0 0
0 0 0 0 0
Non-Occupational Injuries
Lost Workday Cases Days Lost
0 0
Safety Record
last lost time injury Days since *
7/5/79 3891
Employee hours since - 5,168,371
On February 28, 1990, the employees of the Aberdeen plant completed 3891 days with no lost time injury.
The main topic for plant safety meetings during the month was a review of the plant's new safety handbook. There was nearly 100% attendance to these meetings.
CCR 00006^4
SAFETY - Continued
Routine dosimetry results for the month were:
Chemical
VCK Lead Total Particulates
_______< - PEL Huffbey Percent
69 100.0 11 100.0
5 100.0
> PEL_________
Number
Percent
0 0.0 0 0.0 0 0.0
Monthly Injury Snnmtflrv There were no injuries reported.
QUALITY MANAGEMENT PROCESS - M. R. Kane
Ninety-five percent of the plant's natural teams met in February", some for the first time. The facilitator team is working with the teams to teach them team management techniques.
t The departmental support scorecards were finalized so that each employee knows how their contribution affects the plant scorecard. Also, the Q-Scorecard was finalized and communicated to the plant.
One customer visit occurred during the month. ElPaso PVC (a sub sidiary of Group Dekko) visited to tour the plant and learn a little more about PVC production.
. TL.
'}"
,,oooo6b CC*
L
COST VARIANCES - D. C. Skokna
Variable Costs Product
February. 1990 Variance. $M
Efficiency
Price
Total
PVC Flexible Compound Rigid Compound Plasticizer
<$11.7> 90.5
<81.9>
<21.1> <$26.2>
$834.0 175.7 215.7
____21a $1248.7
$822.3 266.2 133.8
2.2 $1224.5
PVC - Efficiencies were essentially at budget.
Flexible Compound - Product mix ($76.3M favorable), raw material use ($15.2M favorable), and lower than budget off-grade ($11.OH favorable) were the contributors to the overall favorable variance.
Rigid Compound Product mix caused essentially all of the month's variance.
Plasticizer - Raw material use was above budget.
Price Variances
$M
- VCM - Resin to Rigid Compound
- Resin to Flexible Compound - Alfol8 610 - Electricity
- Ti0a - Other Price Variances
Total Fixed Cost Variances
$816.7 203.6 157.9 16.4 11.7 10.1 32.3
$1248.7
- Payroll and Benefits - MM&C - Miscellaneous - TI&D - Clearances
Total
$ 6.2 51.7 59.0 5.6
< 0.7> $121.8
Payroll and Benefits - These were essentially at budget.
M. M. & C. - This category was favorable due to low activity levels.
CCR 000006267
COST VARIANCES - Continued
Miscellaneous: Major variances in this category were:
Unclassified:
$10.7M favorable - Physical exams were budgeted in the second quarter but will occur in March when the charges will clear.
Contract. Operating:
$12.2M favorable. Strike preparation costs of $30M were budgeted in the second quarter. Charges have not cleared (should clear in March or April).
Processing Supplies: $10.1M favorable.
Switching Costs: $13.9M favorable. This month's invoice was late.
r. i Tsv ;>
-s.v*
' rvco
jp*
ooooo^8
ct*
VINYL - J. D. Olson, K. W. Birck
Safety
The Vinyl Department did not have any first aid or OSHA recordable injuries during the month of February.
The monthly safety meeting topic for the month was the new safety manual.
General
1. Initial clean wall testing was completed during February. Results continue to look promising as reactor walls repeat edly and consistently coated with clean wall agent prior to charge have remained clean. Next month a new temporary test clean wall injection system will be used. This new system will be designed to provide better clean wall application.
2. Startup of the V-ll natural gas detectors was completed in February. This plant safety feature shuts down the dryer direct fired burners whenever a high level of natural gas is detected in the dryer building.
3. The resin raw materials in the 744 account were valued at $349.1M.
Februarv
YTD
- Production, MM Lbs. - Daily Rate, M Lbs./C.D. - Capacity Utilization Factor, % - Total Reactor Charges - Charges/C.D. - Reactor Stream Factor, % - Rotary Dryer Stream Factor (#4-#8), - Fluid Bed Dryer Stream Factor, % - Resin Quality, % Prime
%
Reactor Downtime
36.6 1307.3
107.2 854.0
30.5 92.5 85.7 96.7 95.3
179.6 1189.5
97.6 4203.0
27.8 84.8 73.5 88.2 96.5
Hours
- Operational downtime (recovery scheduling conflicts, rinsing chea wash tanks, New Module rinse/charge water conflicts, no place to dump, 0-rlng leaks, waiting on Q.C. data before charging, and inclement weather).
229.0
Maintenance downtime (hydroblast reactors and drill condensers D700, replaced con denser base gasket on D741, drilled 741 condenser, replaced agitator seal on D400, repaired reactor jacket on D400, replaced reactor Lanape manway on D300 and miscella neous instrument and valve repairs).
275.0 co?
VINYL - Continued
Drver Downtime
Reactor limited production.
Operational downtime (centrifuge plugs, check for dust collector leaking, clean dryers, activator transfer problems, and flameouts).
Maintenance downtime (centrifuge repairs, replace north fluid bed centrifuge, shear pins, exhauster maintenance, hydroblast centrate line, sparge pipe replacement and Bird boot repairs).
% of Total Downtime 66.7 16.5
16.8
Kev Maintenance Work - J. B. Autrey, J. B. Hegwood
Reactor 400 was shut down during the month for repairs to the water jacket. A crack developed in the weld between the water jacket and the reactor vessel. Also during this time, the seal was changed out on the reactor because of an excessive oil leak. The seal was in service for nine months.
- The north fluid bed Bird centrifuge was changed out during the month because of a minor vibration problem. The vibra tion was caused by a calcium carbonate buildup. The Bird was replaced with a spare. The Bird that was removed will be re built and used as a spare.
Reactor 741 was shut down during the month because of a
leaking gasket on the condenser base.
The gasket was
replaced with a Flexitallic spiral wound gasket and the
condenser was drilled because of cooling control problems.
The "B" recovery compressor was changed out during the month . due to decreased performance. It was replaced with a spare
compressor.
The #5 dust collector conveyor screw was changed out with a spare during the month. The screw shafts have been breaking because of an excessive torsional stress. Several options are being considered at this time to alleviate the problem.
The #8 Bird centrifuge was taken out of service during the month, rebuilt and put back in service.
Reactor 700 was shut down during the month drilling and hydroblasting as part of the control program.
for condenser contamination
- Reactor 742 was shut down for condenser drilling during the month because of cooling control problems.
CCR 000006270
VINYL - Continued Key Maintenance Work - continued
The north chem wash pump motor was changed out with a spare during the month because of bad bearings in the motor. - The vinyl control room UPS unit was shut down for repairs on its systems control board and battery backup system. The systems control board was replaced along with three batteries. The old unit centrate exchanger was shut down for drilling and acid-cleaning because of an excessive calcium buildup. - There were eight major valves changed out in the reactor area during the month.
; ,~a:
00006g7l
COMPOUND - J. E. Nickerson, K. G. Akins
Safety
The Compound Department worked without injury in February. The new safety handbook was reviewed in the monthly safety meetings.
Demand for flexible compound continued strong in February. Produc tion schedules remained tight throughout the month. Line I rates were reduced by 48 hours of PLENEX polymer production and fiftyfour hours of roll mill maintenance. Line V was down for fortyeight hours during a test run to optimize screw configurations for production of rigid compounds. Work began on an experimental design on Line III to determine how temperature and shear affect fusion delay.
On February 1, the dry blend unit produced 378,370 pounds to set a new one-day production record. The previous record was 356,554 pounds set on January 6, 1990. As in January, the orders for rigid compound were heavy. A 10M pound sample of foamed sheet dry blend was produced for Vycom in February. An experimental design was conducted during this production to determine the effect of batch size and drop temperature on blowing agent dispersion. Samples of 80273G dry blend produced after the foamed sheet dry blend were sent to R&D to determine the extent. If any, of blowing agent con tamination of subsequently produced materials.
Rates were slightly reduced in the plasticizer unit as two plasti cizer reactor agitator assemblies were replaced. The final two re placements will be completed in March.
Operating
Conroound Production
Davs
_________Production (K Lbs . > Month Ave./Dav Fiscal Y.T.D.
Line I
27
Line III
28
Line V
21
Total
% Prime
Capacity Utilization Factor
Downtime
1733
64
3425
122
900
Jil
6058
229
98. 1
780
Hours
9965 16576
3239 29780
98.0 .764
Line I
- Product Changes - Mill Maintenance - PLENEX Polymer Testing - Miscellaneous Maintenance - Dicer Problems & Maintenance
81 54 48 19 14
CCR 0ooq6272
COMPOUND - Continued
Downtime - continued
Line III
- Product Changes Miscellaneous Maintenance - Quality Problems and Control Mill Maintenance j.
Line V
Hours
60 37
9 9
- W-P Maintenance - Rigid Compovind Test Run " - Quality Problems & Control - Weigh System Maintenance - Product Changes J Miscellaneous Maintenance
52 48 44 42 36 17
Operating Davs
Month
Production (M Lbs.)_____________
Avg./Day
Fiscal Y.T.D.
Rigid Compound
28
5481
% Prime
99.4
Capacity Utilization Factor
.930
196
22578 99.4 .754
Downtime
Hours
- Product Changes - Quality Problems & Control - Miscellaneous Maintenance
82 40 26
Operating Days
Month
Production (M Lbs.^_____________
Avg./Day
Fiscal Y.T.D.
Plasticizer
28
% Prime
Capacity Utilization Factor
1404 91.0 .679
50
7704 89.8 .752
Key Maintenance Work - J. B. Autrey, J. B. Hegwood
The Line V twin screw extruder was shut down during the month so that the lubrication system could be cleaned. The filters and oil tank were also cleaned.
The Line I mill was shut down during the month for repairs to its gears. The gears were removed and flipped because of excessive wear on one side of the gear teeth. A new set of gears has been placed on order.
CCR 00006273
COMPOUND - Continued Kev Maintenance Work -continued
- The front rotary joint on the Line III mill was re placed during the month and repairs were made to the hydrotherm line also. The rotary joint on the Line I Banbury gate was re placed during the month.
- The middle cooling tower pump was taken out of service because of bad windings in the motor. The motor is being repaired and the pump will be put back in service as soon as possible. The temperature control loop on R-2 plasticizer reactor was repaired during the month.
i
CCfc ooooo*"
UTILITIES - J. B. Autrey, J. B. Hegvood The #5 water well was put in service on 2/19/90. The calcium carbonate levels in this well are significantly less than that of the other wells. Pond aerators #3, #4 and #8 were shut down for repairs during the month. The motors were replaced in aerators #4 and #8. Number three had a bad ground wire that was repaired.
q&'r i:..;
CCR 00006275
ENGINEERING - R. E. Polk, S. C. Hillman, M. R. Kane
PROJECTS IN DEVELOPMENT - GENERAL
5305 Decalcified Water Teat:
The test run for removing calcium in 5305 charge and rinse water will begin the week of March 12. The test will involve diverting charge and rinse water for 5305 made in 745 reactor through a water softening bed. Samples will be sent to BASF for calendaring evalu ation. If BASF sees an improvement in graininess, a car will be offered to Klockner for evaluation.
EVC Clean Vail Technology
The closed reactor temporary addition system for 745 was completed
March 7. The system is being tested. Results from the testing will
be used to design a permanent addition system for all vinyl
reactors.
"' -
TC Waste Water Compliance
A class "A" design is being prepared to provide instrumentation and equip-ment to improve the reliability of the batch water strippers. This will be needed to meet TC waste water limits.
Interaction Management
Engineering, department heads and supervisors attended Interaction Management seminars conducted at the Best Western.
Plasticizer BOD/COD Reduction
Baffling of the existing biodisc has been identified as a way to improve BOD/COD performance from the biodisc. A baffle will be in stalled between the second and third cell in mid-March, after which sampling will be increased to determine the amount of BOD/COD reduc tion that can be achieved.
Of the four offers made for permanent process engineers, three have declined.
CCR 000006276
AFE NUMBER
PROJECT DESCRIPTION
AB5B DBIS A319
A6H
A909 C9I7
D6I?
D629 07D9 D78?
DB4?
DB59 F579 F66? F699 F73? F77? 636? 6657 67J7 675? 681? 6839 H677 H729 H76? HB27 HB7? A54Q H500 H5I0 H520 L530
ALTERNATE NATURAL BAS PIPELINE VINYL VALVE UP6RA0E PLANT ELECTRICAL UP6RADE VINYL CONTROL SYSTEN MODERNIZATION INERTS RENOVAL NOD1HCATIONS NEW MATER NELL PROPANE STORAGE AREA SELU6E SYSTEN CONFOUND REBLEND TRANSFER SY5TEN LEAO HANDLING AND EXPOSURE REDUCTION INERT 6AS PUR6IN6 OF PA TANKS CONFOUND LINE 3 SEMI-BULK LEAD HANDLIN6 CONPOUND SILO BRID6E BREAKING CONPOUNO BOXING HOPPER NA6NETS CONPOUND LINE 3 HEATED PLASTICIZER LON MOLECULAR HEIGHT RESIN EXPANSION DRYER NO.0 CONTAMINATION REDUCTION DRYER NO.A CONTAMINATION REDUCTION DRYBLENU OIV.VALVE AND CHUTE REPLACEHENT NEN DRYER BA6HOUSES CONPOUND SEWER REVISIONS HASTE OIL REDUCTION VCR SI6HT GLASS REPLACENENT PLANT HATER RECYCLE PLASTICIZER REACTOR AGITATORS TORQUE RHEOMETER REPLACENENT PLANT DIVERTER VALVE REPLACEHENT RECOVERY SYSTEN COMPRESSOR - SPARE ROOF UPGRADE REDUCED FLAME b SHORE COMPOUND PROJECT PLANT HATER SYSTEM NEST INCINERATOR REPLACEMENT MISCELLANEOUS CAPITAL PROJECTS < MSN FURNITURE AND OFFICE EQUIPMENT
ABERDEEN CHEHICAL PLANT APPROVED CAPITAL PROJECTS
STATUS
THE SYSTEM HAS BEEN STARTED UP AND IS OPERATIONAL. PUNCHLIST ITEMS ARE IN PR06RES5. INSTALLATION IS IN PR06RESS AND PLANNED FOR COMPLETION IN APRIL. CONSTRUCTION IS ?5X COMPLETE AND IN PR06RE9S. PROJECT COMPLETION IS PLANNED FOR MARCH. ENBINEER1NB IS IN PR06RESS. CONTROL ROOM PRE-HORK ITEMS ARE SCHEDULED FOR COMPLETION IN MARCH. DESIGN IS IN PROGRESS KITH COMPLETION SCHEDULED FOR MARCH. CONSTRUCTION IS COMPLETE EXCEPT FOR PUNCHLIST ITEH9. COMPLETION IS PLANNED FOR MARCH. INSTALLATION HILL BE COMPLETED IN APRIL. INSTALLATION IS CONPLETE EXCEPT FOR PUNCHLIST ITEMS. INSTALLATION IS IN PR06RESS NITH COMPLETION PLANNED FOR HAY. INSTALLATION IS CONPLETE EXCEPT FOR PUNCHLIST ITENS. LONG LEAD ITEMS HAVE BEEN PLACED ON ORDER. PROJECT COMPLETION IS PLANNED FOR 7/1. LONG LEAO ITENS HAVE BEEN PLACED ON ORDER. INSTALLATION IS PLANNED FOR COMPLETION IN JUNE. INSTALLATION IS COMPLETE EXCEPT FOR PUNCHLIST ITEMS. ENGINEERING IS IN PROGRESS. PROJECT COMPLETION IS PLANNED FOR HAY. INSTALLATION IS IN PR06RESS NITH COMPLETION PLANNED FDR NAY. THE PROJECT HILL BE CLOSED TO FIELD CHARGES IN HARCH. A CHANGE ORDER HAS BEEN APPROVED FDR MODIFICATIONS TO 15 DRYER. DESIGN IS IN PR06RESS. PROJECT COMPLETION IS PLANNED FOR APRIL. REDESIGN OF THE BA6H0USE SCREH FEEDERS IS IN PROGRESS. INSTALLATION IS IN PR06RESS KITH COMPLETION IN NAY. INSTALLATION IS IN PR06RESS H1TH COMPLETION PLANNED FOR APRIL. DESIGN 15 IN PROGRESS. PROJECT COMPLETION IS PLANNED FOR APRIL. DESIGN JS IN PROGRESS. PROJECT COMPLETION IS PLANNED FOR JUNE. INSTALLATION IS SCHEDULED FOR COMPLETION IN MARCH. THE PROJECT HILL BE CLOSED TO FIELD CHARGES IN HARCH. INSTALLATION IS COMPLETE EXCEPT FOR PUNCHLIST ITEMS. THE COMPRESSOR IS SCHEDULED FOR DELIVERY IN APRIL. THE PROJECT N1LL BE CLOSED TO FIELD CHARGES IN MARCH. DESIGN IS IN PROGRESS TO PROVIDE C00UN6 MATER TO THE BANBURY ROTORS. ENGINEERING IS IN PROGRESS. PROJECT COMPLETION IS PLANNED FOR HID'1991. EN6INEERIN6 IS IN PROGRES9. SPECS HAVE 8EEN ISSUED TO T-TKERMAL FOR REVIEN. ENGINEERING IS IN PR06RESS ON 23 PROJECTS. EQUIPMENT IS BEING QUOTED.
ii290oooc voo
ENVIRONMENTAL - F. G. Jeanson
Water
All wastewater discharge parameters were met for the month of February.
Bioassay testing was also completed on centrate containing the new clean wall agent. Results were favorable.
Mr The new air permit for our plant will be reviewed by the Mississippi Department of Environmental Quality (MDEQ) Board on March 13. We should have a new air permit shortly after that date.
SARA
The Section 312 report was completed and issued to the State, the Local Emergency Planning Committee (LEPC), and the fire department.'
The 1988 Section 313 report was sent to us by EPA to be proof-read. The report was proof-read and returned to EPA.
Waste
The RCRA Biennial Report was completed and issued to the MDEQ.
Waste shipments for the month included:
- One bulk load of separator oil to Systech in Demopolis, AL.
- One drum load of stabilizer spill to Technical Environmental System in LaPorte, TX.
Chemical Waste Management will stabilize all loads going to the Lake Charles facility at the Emelle, AL facility. All of our drum loads of waste can now go to Emelle to be stabilized. From there, they will be transferred to Lake Charles. There will be an additional charge for the transfer; however, the total cost will be less than what we currently pay for transportation.
Reports Completed
- Monthly NPDES
- EPA questionnaire on latitude/longitude of NPDES outfalls
- Vinyl Institute Environmental awards questionnaire
CCR 000006278
ENVIRONMENTAL - Continued
Suoerfund
A meeting was held with EPA (Region IV) to discuss the NUS Report and recommendations.
A meeting was also held with Conoco representatives to review the NUS Report and look over the sites.
A letter was completed with four tables summarizing the results listed in the NUS Report.
Miscellaneous
Joe Ledvina and I visited M&M Chemical, a waste oil blender, to qualify them as an option for recycle of burnable residuals.
I attended a seminar on the Third Third Land Ban conducted by
Chemical Waste Management. jj, ^ -
:r.
.
I took the Certified Hazardous Materials Manager's exam this month.
Bob Seymour and I attended a legislative reception in Jackson for the area representatives and senators, which was sponsored by the...:'. Aberdeen-South Monroe County Chamber of Commerce.
CCR 000006279
ENERGY CONSERVATION - D. A. Moore
February. 1990
I. Energy Conservation Data(t>
A. Unadjusted EUI
<16.8%>
B. Adjusted EUI
<17.0%>
C. BTU/Lb. Product
2888.0
D. Total Energy Consumption MMM BTU 139.38
Fiscal Y.T.D
< 13.1%> < 13.4%>
2791.0 663.67
II. Plant Energy Conservation Program
A. Maintenance
There were thirty-five energy related items completed in February, Twenty-nine of these items were steam leak repairs. The remaining six were steam trap-repairs.
III. Boiler Operation
Boiler
Combustion Efficiency % .. Feb.. 90 Fiscal Y.T.D
No. 1 No. 2 No. 3
83.3% 83.1% 83.0%
83.44% 83.32% 83.02%
(1) Total energy usage is an estimate due to the plant electrical upgrade project being under construction.
CCR 000006280
HtJKAN RESOURCE REPORT FEBRUARY, 1990
Personnel - J. E. Beall
Employment: None Promotions/Transfers John D. Olson - Transferred from Lake Charles Chemical Plant,
Operations Superintendent, to Operations Superintendent Aberdeen. Charles McDonald - Transferred from Senior Process Engineer - Aberdeen to Process Superintendent - Oklahoma City. Dvain Lucas - Transferred from Lab Lead Technician to Lab "A" Technician (due to Mike Gray returning to Lab) William Holcomb - Promoted from Storekeeper "B" to Storekeeper "A".
None TERMINATIONS /RESIGNATIONS None TO/PROM LEAVE OP ABSENCE None
CCR 000006281
ABERDEEN, MISSISSIPPI
Salaried Employee* Hourly Employees Total Employee*
FEBRUARY. 1990 MONTHLY PERSONNEL REPORT
76*
Minority Employees #, %
172
Salaried
6
81
248
Hourly
66
38Z
Employees (Hourly!
New Employees
0
Terminations _______^
____12______ --ME--
Hourly Min. Hired % Min. Hired
Q 0J
Hourly Min. Term..
Q
--
- % Min. Term.
0
DEPARTMENTS PAR #EMPLOYEES MIN, EMpL %MIM. NEW HIRES YTD TERM. YTD. TURNOVER YTD.
Warehouse 16
Gen. Plant 13
Maintenance 41
laboratory 24
Compound
40
Vinyl
33
Plasticizer 5
15 16 41 24 38 33
5
8 ' 53 ' Q 0 0 'o
5
31
Pw
00
10 24 P 0 9 0
5 22 P 0 0 0 26 67 P 0 0 0 10 30 0 0 0 0
2 40 0 _0_ 0 0
0o 00 00 0 00 00 00
Number of Applicants:
Month
0
Year To Date
0
APPLICANT BREAKDOWN:
# Minority
0 % Minority 0
* Female
0 % Feosle
0
* Includes L Co-op Student
Hires (Hourly):
Month 0
Year To Date ___0
Terminations (Hourly):
Month 0 Year To Date
Overall Turnover
o
0
Projected Annual Turnover
0
CCR 0006282
ro CO IM s> O O O O r.'i O 11
O' o
u
* < eeava ........................... ahwvj ni Hivaa moj SWnOH INVId 1V101 eo*e ....... Aina ihmwmm ivnouvn moj BBnOH INVId 1V101 oe*89 ..................................... Aina Anr moj sanoH iNVid ivioi
ee*0OA ez'E 62* 29*0 fl*0 B9'2 ee*ceei bsmi 2*i90 eo*e
0*992
INVid 1V101
ee*0 00*0 |00'0 00*0 00*0 00*0 00*0
00*0 00*9
09*0
00*0
SM3dl3H 1VM3N3D
00*21 2*9 |9'9 6C*0 00*0 92*9 00* IS 2*9 0'2 00*0
00*692
H3ZIDIiSV1d
00*081 9*
06*1 02*0 00*1 02*0 2*H 98*9 2*609 00*0
09*9l 9E*E 0* 1 aro S9*e 00*0 0S*E9 49*91 2*6101 00*0
00*99 E9*0 00*0 00*0 00*0 00*0 00*0
18*91 0*2t 00*0
6*626 0S*8I9 O0*2C6
1ANIA awiodwaa aH3i5 m
00*0 2*0 00*0 00*0 eo'o 00*0 00*0
6*6 0*96 00*0
00'26 8V1 lN3HdD13A3a
00*91 21*1 E*0 EE'0 00*0 00*0 00*1
6* 00*21 00*0
OO'VOE
S3M01S
00*0 66*6 9B*8E 00* 1 eo'o 9B'2 0*69 20*91 2*Zt 00*0
52*056
3SnOH3MVfl
00*8 S2*0 00*0 00*0 00*0 00*0 00*0
2'l 2*9
00*0
00*21
SMOlINVr
00*94 E9*2 29*0 29*0 00*0 00*0 00*21 91* 2*291 00*0
00*2282
0V1 Db
ee*9sz 20*S 21*9 EE* 1 6s*e 12*2 2*922 0E*21 2*699 00*0
2*6E9
33NVN31N1VH
00*0 99*2 EE'EE 00*0 00*0 EE'EE 00*891 00'2 0*98l 00*0
06*965
uiinn
00*26 99*1 00*0 00*0 ee*e 00*0 OO'O
28*E1 2*021 00*0
00*22I
sanoH 31VQ 1V10I aiVdNON aivd SS3NMIS 1S01 SMH 3HI1 HIS TOHIN03 "KJHIN03NON aXHN SMH
N0I1V3VA -01-MV3A
831 ID
33N3S8V JO I V SV sunoH 3H11M3A0 3HU MIS
3HUM3A0
_____ 3HH.iH3WVlSJQ.?.S-SVJ3H3SSS_____
__ SMOQH.3HU83AO__ 1
OMVA ld3fl
0661 `'Hvnam
6/9 /Z HI 06/S /Z HU 'SflVBH iH3Hiayd30 'nAr *Djr 'snu l., Nounaiaisia
lU0d3M S1SATVNV SMflOH 1VlN3HiMVd3a INVId *1 V 3 1 H 3 H 3 N 3 3 0 M 3 8 V
ABERDEEN CHEMICAL PLAN!
DEPARTMENTAL HOURS ANALYSIS REPORT DISTRIBUTION L^T RUS, JFC, JVU, DEPARTMENT HEADS, FILE
Id/ 2/8? THf 13/ 4/90
DEPT YARD UTILITY
STR TIME HRS URKD
HWERTTfOBORS
OVERTIME HOURS NONCONTROL CONTROL
----------fiBSEHCrfiS'fi'rorSTRAICflT TIRE---------
OVERTIME
AS A X OF ABSENCE
OTHER
YEAR-TO- VACATION:
SIR TIME HRS LOST SICKNESS PAID N0NPA1D TOTAL
DATE
HOURS
0721.75
252.00 704.75 15.13
91.75
0.00
6.54 0.83
1.36
1.46 668.80
3236.50
144.00 050.50 24.78 252.00
7.80
0.60 0.00
7.80
7.44 '248.00
MAINTENANCE
27171.00
307.75 4487.25 17.05 1303.00
3.83
0.35 0.84
5.02
5.07 2440.00
QC LAB JANITORS
14987.00 1915.00
324.00 0.00
710.00 78.75
0.90 4.11
332.25 5.00
1.12 0.00
0.08 0.00
1.02 0.26
2.22 0.26
2.43 0.25
784.00 208.00
WAREHOUSE
5204.00
0.00 424.25
8.00 540.25
9.35
0.46 0.57 10.38
9.99 472.00
STORES
1504.75
0.00
50.58
3.01
28.25
0.00
0.00 1.01
1.81
1.72 124.00
DEVELOPMENT LAD 4554.50
00.25 423.08 10.74
27.25
0.53
0.00 0.07
0.60
0.57 536.00
DRY BLEND
4980.75
30.00 420.50
9.27
33.00
0.00
0.00 0.66
0.66
0.63 388.00
COMPOUND VINYL PLASTICIZER
32005.75 32257.50 4048.50
240.00 1152.00
00.00
2835.00 3204.75
140.75
9.59 13.09 4.9?
1857.50 519.25 153.75
2.40 0.48 2.3B
0.35 0.31 0.00
0.55 0.82 1.43
3.30 1.61 3.81
3.34 1456.00 1.54 1000.00 4.52 248.00
GENERAL HELPERS
0.00
0.00
0.00
0.00
0.00
0.00
0.00 0.00
0.00
0.00
0.00
TOTAL PLANT
130759 2512750" 14208755 12714 4455725
57T5
5727 5774
37T5
1720 9371755
TOTAL PLANT HOURSFORJURY DUTY............................................ 08.00 TOTAL PLANT HOURSFOR NATIONAL GUARD/RESERVE DUTY......... 12.00 TOTAL PLANT HOURSFORDEATH IN FAMILY............................ 300.00
o o
p
o
oo
O' rj 03
ADMINISTRATIVE SERVICES - J. E. Little
Safety
There were no safety Instances this month. Safety handbooks were distributed followed by a presentation from the Safety Department.
Cost Savings
Savings due to competitive bidding were 8,625 for February, and $71,464 for FY1990.
Savings due to prompt payment discounts were $1,641 for February, and $10,517 for FY1990.
Warehouse - Finished Goods Inventory
Slow moving inventories are still a major concern. A revised listing
of old compounds will be given to Fred Williams. .........
'
Flexible Compounds Rigid Compounds
Slow Moving Compounds
811,474 101.120 912,594
Fred Williams was advised that approximately twenty-five percent of
our packaged inventory was either slow moving or off-grade.
'"
Development
Three employees attended Interaction Management Class at the Aberdeen Best Western: Fat Wells and Tommy Cummings, 2/14 - 2/16; and Mike Swierc 2/26 - 2/28.
Ruth Morris was in Aberdeen 2/08 - 2/09 to work with Judy Frossard on the PMS conversion to PC application. Final conversion from the main frame is estimated to be 3/31/90.
Several employees attended forklift training class on 2/27. Addi tional hands-on training is scheduled for March.
Meetings
2/01
Supervisor meeting at the Best Western.
2/05
Jack Little and Mike Kane - Finalize Q-Support card.
2/08 2/13
Jack Little, Mike Swierc and Pat Wells - Develop procedure for handling Gold Bond raw materials.
Jack Little met with Dale Reynolds from Exxon to review exchange balance.
CCR 000006285
ADMINISTRATIVE SERVICES - Continued
Meetings - continued
2/14
Bob Seymour and Jack Little met to review FY90 goals.
2/21
Teresa Pounders and Linda Michels attended a vendor
appreciation presentation (Union Camp)
in
Lafayette, LA.
2/27
Jack Little met with Yellow Freight to review LTL discounts.
Numerous negotiations/preparation meetings for the 3/19/90 contract expiration.
CCR
0oo62S6 ,
ABZIDIII C8ZHICAL PLAIT SIIPPIIG ARALTSIS flBRRAtt 1999
-SIIPHHTS BT PRODUCTS-
POBIriC
SORTS 1PT/ITC
IXCIAKI
PUBLIC
TTD IPT/ITC
2ZCHA8GI
IISII-BOLI IISII-PACZAGID
18,852,060 9,163,540
0
471,054
221,200 886,150
91,757,892 48,000,110 1,234.909
1,770,156 1,167,950
0
FUIIBLI COHPO0BD-BDLI
1,507,510
FLIZIBLI CQHPQ08D-PACIAGIB 3,061,605
m BOSIIZSS
1,500
739,050 425,950
0
0 0
0
7,289,290 14,624,546
6,864
4,217,200 1,007,878
0
0 0
0
RIGID COKPOUSD-BOtil RIGID COHPOOU-PACIAGID
4,174,090 1,056,650
201,887
4,200
0 0
18,698,280 2,952,650
1,030,321
17,000
9
9
PLASTKIIll
170,920
00
608,680 1,223,000 364,000
TOTAL
28,440,626 11,630,590 886,150
135,788.219 58,565.788 1.598,900
-SIIPHHTS BT I0DI-
B0LI:
tflBEOABI* IISII FLIZIBLI COMM RIGID COHPOOID PLASTICIXII
torn FIBIDA1I
RAILCAR
COSTOHII COHHOI P1CI0P CARRIER
153 11 36
11 0 6
21 3 2T
1 04
185 14 73
TOTAL
299 17 51 4
272
MTD* IISII FLIZIBLI COHPOOID RIGID COHPOOID PLASTICIZII
TOTAL TTD
706 124 2T5 58 3 22 103 13 81 9 0 14 CCR 000006287
876 140 392
1,105 83 197 23
1.408
FACUGKD:
tflBIUTO IISII FLIZIBLI COHPOOID RIGID COHPOQHD PLAST1CIZIB
COSTOHII F1CI0P
COIHOI CARRIER
5 IS
19 76
98 80
tore C08TA1RII AII/OPS
00
09 09 09
13
4
9 9
TOTAL
33
99 8
9
TOTAL FIB80AIT
24 99 0 0 17
140
*TTD
mu
FLIZIBLI COHPOOID RIGID COHPOOID PLASTICIUB
TOTAL TTD
23 66 0 0
98 357 2 0
6 35 0 1 0 1 00
127 459 2 1
37 12
l
1
51
126 469
43 2
640
LABORATORY - J. M. Edvards, Jr.
A. Safety - There were no safety incidents in the Laboratory for February. The monthly safety meeting topic was the "Vista Safety Handbook" with Billy Paul Sizemore in charge of the meetings.
B. Customer Contacts - ElPaso, a FVC division of Group Dekko, made a plant visit to learn about our process. Vista supplies them 5415.
C. Customer O.C. Problem Reports
2/01 _
- Klockner-Pentanlast. Gordonsville . GA -
When the customer sampled this car,
they found very high quantities of
contamination. This was communicated
to the plant and when the plant inves
tigated the origin of the contamina
tion, it was discovered that the car
was loaded from a start-up silo. It
. was quickly decided then to pull this
car out and divert it to another
customer less sensitive to contamina-
.. tion.
--
2/06
- Condutel. Mexico - The customer re ported finding green pellets and black and grey contamination in 34501 BGE. Samples have been received at the plant and are being analyzed.
D. Requests for Corrective Action
2/08 - AT&T Technologies. Omaha. NE - The corrective action requested was how to prevent future occurrences of contam ination in shipments of 34862 BGE 10 compound. The contamination was de termined to be "paper fibers" and the corrective action was to use only sham knives when opening raw material bags as they are Introduced to the system.
E. Product Waivers
Customer
Product
Reason
No.
B. P. Performance
5415
Static Flow
1 R/C
Capito1/Guardian
5415
Static Flow
1 R/C
Essex Group
5415
Static Flow
1 R/C
Export
5265
Moisture
1 R/C CC 000006288
LABORATORY " Continued
F. RVCM SiiTTffnar-v
RVCM of In-Process Samples
The following is a summary of residual VCM results on inprocess samples. None of the reactor daily averages exceeded 400 ppm RVCM during the month of February, 1990.
Reactor Slurries
_________Drier
5265
5305
Number of Samples Average RVCM, ppm
851 116
38 0.926
75 0.835
RVCM of Shipment Samples
The following is a summary of the residual VCM analysis of shipment samples for the month of February, 1990.
Product
Number of Sanmles
Average RVCM.
5265 5305 5385 5395 5415 5465 Dry Blend Debox Fond
' --
46 96 54
0 62
0 61 12 14
0.733 0.565 0.680 0 0.053 0 0.124 0.854
2.350
Resin Process Caoabilities (based on dryer "regulars")
5265
5305
5385
5415
Bulk Density Inherent Viscosity
(vs. 0.715 - 0.744) L Color A Color B Color % on Pan
(vs. 2%, max.) % thru 140 Mesh Drytime Mets I.R.
(vs. 95% of control) Hard Particles, (% > 10) Average particle size.
microns
1.94 0.67 .... 8.11 6.33 3.17 2.33 -- 0.66
--
-- -- --
142
2.50 0.35 0.18 2.53 3.83 2.83 1.21 .... 0.68
-- .... --
--
138
2.03 0.75 -- 3.25
....
2.67 2.58
....
1.64 2.00
.... --
7.9
160
1.08 1.14
7.17
7.00 6.17 1.17 5.33 2.00 3.33 2.07 1.2
173
CCR 000006289
Continued
H. Flexible Compound Quality Summary
Adjustments MJUfefj. jCH
Hardness Color Hard Particles Heat Stability Dicing Cross Contamination Streamers
Totals
7.0 <0.11> 7.0 <0.11>
I. Rigid Compound Quality Summary
Rejections M Lbs. XU
11.4 20.8
53.1 8.0 8.4 1.4
10.8 113.9
<0.19> <0.34>
<0.87> <0.13> <0.14> <0.02> <0.18> <1.86>
\
M Lbs. (%)
Color
Total
33.8 <0.61> 33.8 <0.61>
J. Miscellaneous
~ "-.L 1;
The HS 100 gas chromatograph used for RVCM testing was down for 2 1/2 days until repairs could be made. Perkin-Elmer had been called prior to the instrument failure. It took six days for Perkin-Elmer to respond with a repairman.
2. Dave Cox, Billy Paul Sizemore and Richard Williams attended a three-day course in Interaction Management.
3. Five of six natural teams met once during the month. "Team ... Meeting Planning and Management" was taught to each natural " team by their respective facilitators.
4. The IBM PC used for faxing certificates of analysis was down two days for repair. This computer had been in service five years without major repair.
5. A newer and better version of SQC software was used to report SPC charts of resin shipments this month.
CCR 000006290
RESIN Ship Date 2/06/90 2/06/90 2/07/90 2/07/90 2/08/90 2/08/90 2/08/90 2/09/90 2/13/90 2/14/90 2/19/90 2/20/90 2/20/90 2/21/90 2/23/90 2/23/90 2/28/90 COMPOUND Ship Date 2/01/90 2/05/90 2/07/90 2/09/90
SAMPLE SHIPMENTS FEBRUARY 1990
Product 5415 Control
Amount 50 lbs.
Customer Vista - Ok. City
Pond Resin
50 lbs.
Conex of Georgia
Pond Resin
5 lbs.
VCLA - Houston
Pond Resin
50 lbs.
PARAGON TRADING
Pond Resin
.. 10 lbs.
Osterman
Pond Resin
200 lbs.
IMP. & EXP. JOREGA SA DE CU
Pond Resin Pond Resin Pond Resin
200 lbs. ~"T`lb. '
~5 lbs.
QUIMPAC CIA. LTDA. Ravago Company Kare Plastics
Debox Resin
1 lb.
Osterman
5395
.50 lbs.
j. Decorative Coverings
5265
100 lbs.
Morton International
5305
50 lbs.
GLASSIDUR S. A,
5385
200 lbs.
Premier Polymers
5305 5415
15 lbs. "V 50 lbs.
Gassen Corporation DuPont Polymer Products
5415
400 lbs.
INYECCIONES INDUSTRIALES
Product 48562 BLK
34311 NAT PLENEX 419-50D 34431 NAT 35852 NAT
Amount 5 lbs.
200 lbs. 200 lbs. 100 lbs. 100 lbs.
Customer Premier Polymers - LGH Superior Cable Fluorocarbon CONDUCEN, S. A.
CCR 000006291
COMPOUND (cont.)
Ship Date
Product
2/12/90
34311 NAT 38631 WHT
2/12/90
35852 NAT
2/27/90
39012 BLK
2/27/90
452-32A BLK
Sample Shipments/Feb. 1990 Page 2
Amount 200 lbs. 200 lbs. 500 lbs. 200 lbs. 1500 lbs.
Customer ELECTROCONDUCTORES
ITT A. E. P. D. Superior Cable Times Fiber
------ --------------------------- -
;--------------------- -------------P---------T--------- .
------------ ----- - ---------------- - --------------------
'. - .
;
-------- -- . - -... .......----- -----------
- ----- -----------------------
1\
000006Z92 cca
ABERDEEN CHEMICAL PLANT INJURIES
NUMBER OF NJURIES
TOTAL INJURIES
O OSHA RECORDABLE
cc* 00006 293
3300
ABERDEEN ENERGY CONSUMPTION
BTU/LB
3200
3100
3000
2900
an/rus
2800
2700
2600
2500
2400
ccr 000006294
2300
2200 JAN 87 JUL 87 JAN 88 JUL 88 JAN 89 JUL 89 JAN 90
MONTHLY
MONTH --------- 12 MONTH AVERAGE
S6Z900000
a UJ
>
UJ o UJ cc
LT3
CCR 0 0 0 0 0 6 2 9 6
VISTA
5415 RVCM 2ND Q FV90
POLYMERS
04-03-1990
Individuals
LCL=-.077B MEAN=0.0505 UCL=0.1789
USING TABULAR CONSTANTS, BASED ON 102 TO 329
1.0
0.80.6-
CCR 0 0 0 0 0 6 2 9 7
VISTA
5415 RVCM 2ND Q FY90 POLYMERS
Individuals LCL=-.O770 MEAN=0.0505 UCL=0.1789
04-03-1990
227
5415 RVCM 2ND Q FY90 VISTA POLYMERS
IndividuaIs
04-03-1990
CO O'
C4 sO
oo
*
Moving range, n=2 LCL=-- MEAN=0.0483 UCL=0.1576
ucl
329
662900000 ttDD
0 in ri
0)
CD CD
CD
CM o CM
O) to CM o CM cn O)
0)
> H
in
in
n
o
in
o
in
Ol o O) O) CD 44 4
*o o O ri CO
ri o
44 r-l o
ri
H ri 1
1 >*
0 BIB n
D B B CD 1 B B B
01
4-1 CD H
0
D) ri ri
M ri
U 09
u CD
U a>
CJ -rl
CL 4-
u CD
u 09
Cd 09 a. cn
cn
CD a. OL cn CD Q. o. cn CO CO
1
cn co
C. c. 3 cn cn CD CD M
C. cn cn o *.
|
CL O)
O. 3C U CD 3 o 09 ID * o
o CO c O rt
CL o *< r-i
>
.e
o 1--1 4- 1--
> o
o 49
c CD
c CD
cn o. o. c.
.o 3
3 09 3 09 09
c_> U U N rj
*<c CO O
< CO O
CO f- to D- CT)
r- CD
oo cn
to r--. cn cn CM ri in
cn r-. 'cr CO CD ri CO cn ri
cn
in
00
O
4
CD
4
r-i
4
O)
4
o
4
o o o o O CM in ri
44 m o>
On) B
c c c. ri CO 8
B
o i cn o *o
CM o> n. e
O ^i
3
1 ri O. CD O
CD o- n
o > CD CD
>
H CD CD 0)
o e c_ 3 3
c 1-4
o> CO
rl cn
>
ri CD >
r-l CD >
cn ri cn
o ri 09 4 09 C. 09 > cn CD 09 09 cn 3 c_ a> O" +-
0) > Ll
4 C. cn D _
09 CD
<u
0-1 *--i CM X
CD c f-l m o
o t--1 < ri r-i
CD r c R L> 4 CD O) -4-* (D cd ri cn O H
cn UJ Cd
o 4-1
cn
4
CD
X c. a> -ri 09 C 4-1
CD 3 .X
09 o 09
DC x: cn CJ> *3 o CD
o
cr
5 3 8 5 RVCM 2ND
X
(n
L
0)
E >
i--i
1 ' 1
2.6261 2.4368 2.2515 2.0641 1.6768 1.6895 1.5021 1.3148 1.1275 0.9401 0.7528 0.5655 0.3781 0.1906 0.0035
HH-i TT
T-TTTT
CT*->
TT7T C\J
TTTTT