Document zeqnpxzbOL56jMqmvNnx6Rna

REGION 5 Enforcement and Compliance Assurance Division INSPECTION REPORT Inspection Date: Time: Media: Statute (s)/Program(s): Type of inspection: Access: October 18, 2023 Inspection Announced: No Entry: 9:00 a.m. EST Exit: 11:35 a.m. EST Water Clean Water Act, National Pollutant Discharge Elimination System (NPDES), Industrial CEI - Compliance Evaluation Inspection Granted Permittee Name: Facility or Site Name: Facility/Site Physical Address: (city, state, zip code) County/Parish: Village of Christiansburg WWTP Village of Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Champaign Permit Number: OH0141364 Page 1 of 19 REGION 5 Enforcement and Compliance Assurance Division Persons Participating in Inspection: Title Physical Scientist, EPA Environmental Engineer Mayor Operator Inspector, Ohio EPA Lead Inspector: Matthew Schulte Name Matthew Schulte Joseph Forth Del Davis Cameron Britenstine Jacob Taylor Phone (312) 886-2405 Email schulte.matthew@epa.gov (312) 886-7275 forth.joseph@epa.gov villageofchristiansburg@yahoo.c om britenenv@gmail.com jacob.taylor@epa.gov Schulte, Matthew Digitally signed by Schulte, Matthew Date: 2023.12.21 14:53:34 -06'00' Present at Opening Conference Yes Yes Yes Yes Yes Present at Closing Conference Yes Yes No Yes Yes Region 5 schulte.matthew@epa.gov (312) 886-2405 Additional Persons Participating in Inspection: Joseph Forth Region 5 (312) 886-7275 Supervisor Review: Molly Smith MOLLY SMITH Region 5 Digitally signed by MOLLY SMITH Date: 2023.12.21 15:09:05 -06'00' smith.molly@epa.gov (312) 353-8773 SECTION I - INTRODUCTION Site Entry and Inspection Objectives Region 5 Lead Inspector, Matthew Schulte, and inspector Joseph Forth arrived at the Village of Christiansburg Wastewater Treatment Plant (WWTP) (the "Site" or "Facility"), located at 5526 North Addison New Carlisle Road, Casstown, Ohio, at 9:00 a.m. on October 18, 2023 for an unannounced inspection. Inspectors presented their credentials to Del Davis and Cameron Britenstine and informed the Facility that this was an EPA Region 5 inspection to investigate elements of the Clean Water Act (CWA) and the National Pollutant Discharge Elimination System (NPDES) permit program. The inspection was conducted under the authority of the CWA Page 2 of 19 Christiansburg WWTP Inspection Date(s): October 18, 2023 NPDES permit program and Section 308 of the CWA. The table above identifies the attendees that participated in the inspection. This report is based on information supplied by Facility representatives, observations made by the Region 5 inspectors, and records and reports maintained by the permittee and Region 5. These include the following: direct observations made by the Region 5 inspectors, photographs taken by Region 5 inspectors, physical evidence collected by Region 5 inspectors, measurements taken by Region 5 inspectors, verbal or written statements made or supplied by Facility representatives (the permittee) during or subsequent to the on-site inspection, and materials, processes, data, photographs, or documents shown, demonstrated, or submitted to the Region 5 inspectors by Facility representatives during or subsequent to the on-site inspection. In addition, information gathered prior to or subsequent to the inspection from a review of U.S. EPA, State, and public records may be included in this report. Facility/Site Description Region 5 Lead Inspector confirmed the following Facility information: The Facility is a WWTP for the Village of Christiansburg. This WWTP has been in operation for approximately twelve years and services a population of 500 people and one restaurant. Treatment of wastewater at the plant consists of twelve Max Tanks that are equipped with filter media. Wastewater is pumped through eight of the twelve tanks, through a central pipe that sprays water over the filter media. Water is collected at the bottom of every tank where it is then pumped through the next stage, stage 2, which consists of the remaining four tanks. After stage 2, wastewater will undergo ultraviolet treatment before being discharged. The plant has one operator who is onsite three times per week. There is one outfall for the WWTP, which is located south of the plant and discharges directly to the West Fork Honey Creek. The creek does experience intermittent flows throughout the year and was flowing at the time of the inspection (see photos 14 and 15). SECTION II - OBSERVATIONS Observations may not be in sequential order. Unique Identifying No. MS-OB-001 MS-OB-002 MS-OB-003 MS-OB-004 Observation The Village of Christiansburg WWTP has experienced chronic exceedances of ammonia effluent limitations in the facility's NPDES permit for the last twelve quarters. The Facility has had difficulty maintaining biological life within its tanks for wastewater treatment due to cold weather. (Photos: 4 and 5) Power washing of media filters within Max Tanks is performed on a quarterly basis. (Photos: 1 and 3) Media filters are checked by operator on a weekly basis. (Photos: 1 and 3) Area of Concern? Yes Yes No No Page 3 of 19 Christiansburg WWTP Inspection Date(s): SECTION III - RECORDS REVIEW Records reviewed may not be in sequential order. No. MS-RR-001 Record Facility's NPDES Permit was recently renewed and became effective on October 1, 2023. Permit will expire on September 30, 2028. October 18, 2023 SECTION V - AREAS OF CONCERN The presentation of areas of concern does not constitute a formal compliance determination or violation. No. MS-OB-001 The Village of Christiansburg WWTP has experienced chronic exceedances of ammonia. MS-OB-002 The Facility must meet the effluent limits contained within Part I, A of its NPDES Permit. For ammonia, this includes the concentration and loading limits, which differ in summer and winter months. The Facility has had difficulty maintaining biological life within its tanks for wastewater treatment due to cold weather. (Photos: 4 and 5) The Facility has implemented several projects and measures in an attempt to regulate temperature within their tanks to sustain the biological life necessary for wastewater treatment. However, the Facility continues to have trouble meeting its ammonia and BOD limits. The Facility must meet the effluent limits contained within Part I, A of its NPDES Permit. SECTION VI - CLOSING CONFERENCE AND FOLLOW UP Closing Conference The Lead Inspector held a closing conference with Facility personnel on October 18, 2023, for the inspection. During the closing conference, the Lead Inspector discussed the observations and Areas of Concern identified during the inspection. Observations and Areas of Concern have not yet been evaluated for a formal compliance determination. SECTION VII - LIST OF APPENDICES Appendix 1 - Photo Log [times listed on images are in EST]. Page 4 of 19 REGION 5 Enforcement and Compliance Assurance Division Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 1 Time: 10:48 a.m. Direction Photo Taken: Southwest Photo Description: Max Tank 3. Middle pipe transfers wastewater to be sprayed by smaller outer pipes over the filter media. Photographer: Matthew Schulte Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_01.JPG Page 5 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 2 Time: 10:53 a.m. Direction Photo Taken: Down Photo Description: Sampling pit for internal monitoring prior to treatment. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_02.JPG Page 6 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 3 Time: 10:54 a.m. Direction Photo Taken: Southwest Photo Description: Max Tank 3 with sprayers on. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_03.JPG Page 7 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 4 Time: 11:02 a.m. Direction Photo Taken: North Photo Description: Air intake pipe for Max Tanks. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_04.JPG Page 8 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 5 Time: 11:02 a.m. Direction Photo Taken: Northwest Photo Description: Air pipes expelling air from tanks for air circulation. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_05.JPG Page 9 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 6 Time: 11:08 a.m. Direction Photo Taken: East Photo Description: Benson System UV treatment. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_06.JPG Page 10 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 7 Time: 11:10 a.m. Direction Photo Taken: North Photo Description: Overview of facility and its 12 Max Tanks. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_07.JPG Page 11 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 8 Time: 11:13 a.m. Direction Photo Taken: Southwest Photo Description: Composite sampler after UV treatment. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_08.JPG Page 12 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 9 Time: 11:18 a.m. Direction Photo Taken: Photo Description: Air intake from building to Max Tanks. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_09.JPG Page 13 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 10 Time: 11:19 a.m. Direction Photo Taken: Photo Description: Sampling fridges for internal monitoring of raw sewage. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_10.JPG Page 14 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 11 Time: 11:19 a.m. Direction Photo Taken: Photo Description: Flow meter. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_11.JPG Page 15 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 12 Time: 11:24 a.m. Direction Photo Taken: Photo Description: Lime addition no longer in use. Stopped operating 2 years prior. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_12.JPG Page 16 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 13 Time: 11:28 a.m. Direction Photo Taken: West Photo Description: Sign for Outfall 001 to West Fork Honey Creek located south of Facility. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_13.JPG Page 17 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 14 Time: 11:28 a.m. Direction Photo Taken: West Photo Description: Outfall 001 to West Fork Honey Creek located south of Facility. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_14.JPG Page 18 of 19 Christiansburg WWTP Inspection Date(s): Facility Name & Location: Christiansburg WWTP 5526 North Addison New Carlisle Road Casstown, Ohio 45312 Date Photograph Was Taken: 10/18/2023 Photo No.: 15 Time: 11:29 a.m. Direction Photo Taken: West Photo Description: Outfall 001 to West Fork Honey Creek located south of Facility. Photographer: Matthew Schulte October 18, 2023 Camera: Olympus Tough TG-6 (S/N #BJ5B21169) File: Christiansburg_15.JPG Page 19 of 19