Document zdrwZYjnZ43eGa94Yd9Og54M7
Interoffice Communication
To W. H. Chamberlain -Houston
From
J. A. DeBernardi
Date May 3, 1978
Subject
Five-Year Raw Material Supply Forecast
As requested in Rr A. Conrad's letter of April 18, the VCM Plant in conjunc tion with the Business Area has made a 5-year VCM production forecast. This forecast involves maximum production rates in all five years with two turn arounds in 1979 and 198? and one turnaround in each of the other three years. No incremental EDC production was considered. The forecasted raw materials requirements include the calculated raw materials savings for split HC1 to oxy and acetylene hydrogenation projects, however possible savings with copper catalyst in R-304 were not included.
1979
1980
1981
1982
1983
VCM Production (MM lbs.)
Ethylene Requirement (lbs./lb. VCM) Chlorine Requirement (lbs./lb. VCM)
661
0.4813 0.6647
690
0.4813 0.6647
690
0.4813 0.6647
661 0.4813 0.6647
690 0.4813 0.6647
CC: REL-RDG-RJA-RWMc-MDG