Document zdonEnd73x55VOonX1NkenaZ0

Monsanto ,0,7,ff-.'1,!ll8ingSOn - C2SB' - u-<*yjs 9ATt February 26, 1987 Environmental Status -- Anniston Plant R. G. ?ottsr/G4NH N. 1. Reding/C2NA MAR 02 Sf H. J. Corbect/DID R. L. Fllds/C2NJ R, 1. Harutsa/C2HA 7, T. Mattaucci/G3NR D. D, Hickelson/C2NA The status of environmental programs and issues at the Anniston Plant was reviewed with Mr. Hal Corbett on February 26, 1987. In view of the present indicated direction of transferring management responsibility for the plant from MAC to MCC, our objectives were to inform Hal of the present environmental setting and direction of the plant and to ascertain any corporate environmental reservations or conesms relative to that transfer. Dennis Redlngton of MAC Environmental Affairs reviewed plane status vs. our internal guidelines, and dlscussad on-going activities to further advance environmental programs at the plant as part of the 1987-88 project for site consolidation -- given the demise of parathlan manufacture at the site. Site consolidation is funded by the MAC restructuring reserve and is expected to Laava an unexpended variance of about 12 M la the environmental sector of the reserve. In addition to costa for consolidation, MAC expects to incur on-going eoscs in the range of 1400 k per year for environmental remedial requirements. Copies of Denny's presentation materials are attached. A number of future potential environmental lssuts were Identified, which will require continued monitoring and sensitivity. Hal agreed, however, that the plant's assessment, program and corrective action efforts are doing about what should be dona given our understanding of site issues. It is further understood that coats for remedy of any future environmental issues that emerge will be borne by the operating companies in proportion to cause. We should continue to maintain a cooperative interaction with the regulators, and to be responsive to local eonuniey attitudes to stay ahead of and defuse these future concerns. D. B. Radingt DBR-HAPtjb M. A. Pierle DSw 119459 WATER PCB-SD0000067190 ANNISTON PLANT WORLDWIDE GUIDELINE STATUS #1 * WATER ASSESSMENT 6/04 PLAN ESSENTIALLY CURRENT NEEDS TO BE RE-DONE AIR ASSESSMENT 2/6/87 REVISION NO NPDES VIOLATIONS 2-7 TSS VIOLATIONS/YR - POTW 1-4 AIR EXCEEDANCES/TR FLARE BYPASS NO CERCLA REPORTS #2 IN ESSENTIAL COMPLIANCE WITH ACUTELY HAZARDOUS/ INCINERABLE TIMETABLE ACTIVE SUPPORT OF HAZARDOUS WASTE DATA BASE/REDUCTION #3 LAST ENVIRONMENTAL AUDIT - 4/85 LAST GROUNDWATER ANNUAL REVIEW - 10/84 LAST ASSESSMENT UPDATE - 1/83 I/M FLAN FOR UG STRUCTURES - 6/28/85 *5*6 OP'S USED AND LISTED MINOR USE 5/6 ASSIGNED TO OTHERS AUDITS ESSENTIALLY CURRENT 5/6 UNDER CONTRACT (10/86-5/88 NEXT) 0Sk* U9*60 WATER PCB-SD0000067191 ANNISTON ENVIRONMENTAL REVIEW ENVIRONMENTAL ELEMENTS OF SITE CONSOLIDATION 1. DISMANTLEMENT - 12/87 4 FOB TRANSFORMERS ' NUCLEAR INSTRUMENTS UPGRADE 1600 FT. SEWERS ASBESTOS, P4, MAT'LS DISPOSAL DECONTAMINATION FOR DISPOSAL/SALE CONSOLIDATE WTP CONTROL ROOM MODIFY RCRA DRUM STORAGE ' 2. RCRA CLOSURES LIMESTONE BED - 1/88 LANDFILL - 6/88 _ SK 60 6 383 111 120 92 IS 104 150 OSW U9V61 WATER_PCB- PAGE 2 3. RCRA REMEDIAL ACTION * LIMESTONE BED - 6/38 * OLD LANDFILL CELLS - 12/87 4. ADDEDMONITORING WELLS - 12/87 ' 3 RCRA (DEEP) y 4 VOLUNTARY <2 DEEP, 2 SHALLOW) 5. PCB REMOVAL -- SNOW CREEX 6. EXCESS WTP OPERATION TO FACILITATE SHUTDOWN 7. SHARE OF PROJECT ADMIN BUDGET ESTIMATE RESERVEALLOWANCE PLAN VARIANCE * SK 100 90 80 ERA? 1370 31S 2996 4900 1904 DSh 119462 WATER PCB-SD0000067193 ANNISTON ENVIRONMENTAL REVIEW EXPECTED MAC COST BURDEN FOR ON-GOING OPERATIONS 1. LANDFILL POST-CLOSURE MONITORING 2. LIMESTONE BEDS POST-CLOSURE MONITORING 3. LANDFILL AMD LIMESTONE BEDS REMEDIAL ACTION 4. CONTINGENCY (FUTURE PART B NEEDS) / S K/TR l7i 9l 300 74 S400 l COVERED BY RCRA ACCRUAL OSH 119463 WATER PCB-SD0000067194 ANNISTON ENVIRONMENTAL REVIEW FUTURE POTENTIAL PROBLEMS 1. CHLORINATED HYDROCARBONS IN GROUND WATER 2. DEEP GROUNDWATER 3. OLD FERRO-MANGANESE LANDFILL 4. POTENTIAL FUTURE MOBILIZATION OF SOIL CONTAMINANTS PCB'S MERCURY ORGANOPHOSPEATES PNP other RESOLVED: ANY FUTURE ENVIRONMENTAL COSTS TO BE BORNE BY. OPCO MOST CLOSELY RELATED TO CAUSE OSH U9464 WATER PCB-SD0000067195 DATE 4/82 3/83 4/84 S/85 6/8S 2/861 ANNISTON PLANT CHLORINATED ORGANICS IN GROUNDWATER WELL PPB FOUND MW-7 MW-8,9 11 1,2-DICHLOROETHENE 48 TRICHLOROETHENE -------- CLEAN MW-7,8,9 MW-7 MW-3 MW-9 -------- CLEAN -------- CLEAN / TR 1,1,2,2-TETRACHLOROETHANE TR METHYLENE CHLORIDE MW-7 7 1,2-DICHLOROETHENE 18 TRXC3LOROETHENE 29 1,1,2,2-TETRACHLOROETHANE PROD'N S 4 10 31 TR CARBON TETRACHLORIDE CHLOROFORM METHYLENE CHLORIDE TRICHLOROETHYLENE BENZENE PROD'N NO 3,4,4 282,41,13 9,16,16 8,6,6 CARBON TETRACHLORIDE CHLOROFORM METHYLENE CHLORIDE TRICHLOROETHYLENE BENZENE . 1 three successive samples OSW u9465 WATER PCB-SD0000067196