Document zdonEnd73x55VOonX1NkenaZ0
Monsanto
,0,7,ff-.'1,!ll8ingSOn - C2SB' - u-<*yjs 9ATt
February 26, 1987 Environmental Status -- Anniston Plant
R. G. ?ottsr/G4NH N. 1. Reding/C2NA
MAR 02 Sf
H. J. Corbect/DID R. L. Fllds/C2NJ R, 1. Harutsa/C2HA 7, T. Mattaucci/G3NR D. D, Hickelson/C2NA
The status of environmental programs and issues at the Anniston Plant was reviewed with Mr. Hal Corbett on February 26, 1987. In view of the present indicated direction of transferring management responsibility for the plant from MAC to MCC, our objectives were to inform Hal of the present environmental setting and direction of the plant and to ascertain any corporate environmental reservations or conesms relative to that transfer.
Dennis Redlngton of MAC Environmental Affairs reviewed plane status vs. our internal guidelines, and dlscussad on-going activities to further advance environmental programs at the plant as part of the 1987-88 project for site consolidation -- given the demise of parathlan manufacture at the site. Site consolidation is funded by the MAC restructuring reserve and is expected to Laava an unexpended variance of about 12 M la the environmental sector of the reserve. In addition to costa for consolidation, MAC expects to incur on-going eoscs in the range of 1400 k per year for environmental remedial requirements. Copies of Denny's presentation materials are attached.
A number of future potential environmental lssuts were Identified, which will require continued monitoring and sensitivity. Hal agreed, however, that the plant's assessment, program and corrective action efforts are doing about what should be dona given our understanding of site issues. It is further understood that coats for remedy of any future environmental issues that emerge will be borne by the operating companies in proportion to cause. We should continue to maintain a cooperative interaction with the regulators, and to be responsive to local eonuniey attitudes to stay ahead of and defuse these future concerns.
D. B. Radingt
DBR-HAPtjb
M. A. Pierle
DSw 119459
WATER PCB-SD0000067190
ANNISTON PLANT
WORLDWIDE GUIDELINE STATUS
#1 * WATER ASSESSMENT
6/04 PLAN
ESSENTIALLY CURRENT
NEEDS TO BE RE-DONE
AIR ASSESSMENT
2/6/87 REVISION
NO NPDES VIOLATIONS
2-7 TSS VIOLATIONS/YR - POTW
1-4 AIR EXCEEDANCES/TR FLARE BYPASS
NO CERCLA REPORTS
#2 IN ESSENTIAL COMPLIANCE WITH ACUTELY HAZARDOUS/ INCINERABLE TIMETABLE
ACTIVE SUPPORT OF HAZARDOUS WASTE DATA BASE/REDUCTION
#3 LAST ENVIRONMENTAL AUDIT - 4/85 LAST GROUNDWATER ANNUAL REVIEW - 10/84 LAST ASSESSMENT UPDATE - 1/83 I/M FLAN FOR UG STRUCTURES - 6/28/85
*5*6 OP'S USED AND LISTED MINOR USE 5/6 ASSIGNED TO OTHERS AUDITS ESSENTIALLY CURRENT 5/6 UNDER CONTRACT
(10/86-5/88
NEXT)
0Sk* U9*60
WATER PCB-SD0000067191
ANNISTON ENVIRONMENTAL REVIEW
ENVIRONMENTAL ELEMENTS OF
SITE CONSOLIDATION
1. DISMANTLEMENT - 12/87 4 FOB TRANSFORMERS
'
NUCLEAR INSTRUMENTS UPGRADE 1600 FT. SEWERS ASBESTOS, P4, MAT'LS DISPOSAL DECONTAMINATION FOR DISPOSAL/SALE CONSOLIDATE WTP CONTROL ROOM MODIFY RCRA DRUM STORAGE
'
2. RCRA CLOSURES LIMESTONE BED - 1/88 LANDFILL - 6/88
_
SK
60
6
383 111 120
92 IS
104 150
OSW U9V61
WATER_PCB-
PAGE 2
3. RCRA REMEDIAL ACTION * LIMESTONE BED - 6/38 * OLD LANDFILL CELLS - 12/87
4. ADDEDMONITORING WELLS - 12/87
'
3 RCRA (DEEP)
y
4 VOLUNTARY <2 DEEP, 2 SHALLOW)
5. PCB REMOVAL -- SNOW CREEX
6. EXCESS WTP OPERATION TO
FACILITATE SHUTDOWN
7. SHARE OF PROJECT ADMIN BUDGET ESTIMATE RESERVEALLOWANCE PLAN VARIANCE
*
SK 100
90 80
ERA?
1370 31S
2996 4900 1904
DSh 119462
WATER PCB-SD0000067193
ANNISTON ENVIRONMENTAL REVIEW
EXPECTED MAC COST BURDEN FOR
ON-GOING OPERATIONS
1. LANDFILL POST-CLOSURE MONITORING
2. LIMESTONE BEDS POST-CLOSURE MONITORING
3. LANDFILL AMD LIMESTONE BEDS REMEDIAL ACTION
4. CONTINGENCY (FUTURE PART B NEEDS)
/
S K/TR
l7i
9l
300
74 S400
l COVERED BY RCRA ACCRUAL
OSH 119463
WATER PCB-SD0000067194
ANNISTON ENVIRONMENTAL REVIEW FUTURE
POTENTIAL PROBLEMS 1. CHLORINATED HYDROCARBONS IN GROUND WATER 2. DEEP GROUNDWATER 3. OLD FERRO-MANGANESE LANDFILL 4. POTENTIAL FUTURE MOBILIZATION OF SOIL
CONTAMINANTS PCB'S MERCURY ORGANOPHOSPEATES PNP other RESOLVED: ANY FUTURE ENVIRONMENTAL COSTS TO BE BORNE BY. OPCO MOST CLOSELY RELATED TO CAUSE
OSH U9464
WATER PCB-SD0000067195
DATE 4/82 3/83 4/84 S/85
6/8S
2/861
ANNISTON PLANT
CHLORINATED ORGANICS IN
GROUNDWATER
WELL
PPB
FOUND
MW-7
MW-8,9
11 1,2-DICHLOROETHENE
48 TRICHLOROETHENE
-------- CLEAN
MW-7,8,9
MW-7 MW-3 MW-9
-------- CLEAN
-------- CLEAN
/
TR 1,1,2,2-TETRACHLOROETHANE
TR METHYLENE CHLORIDE
MW-7
7 1,2-DICHLOROETHENE 18 TRXC3LOROETHENE 29 1,1,2,2-TETRACHLOROETHANE
PROD'N
S 4
10
31 TR
CARBON TETRACHLORIDE CHLOROFORM METHYLENE CHLORIDE TRICHLOROETHYLENE BENZENE
PROD'N
NO
3,4,4 282,41,13
9,16,16
8,6,6
CARBON TETRACHLORIDE CHLOROFORM METHYLENE CHLORIDE TRICHLOROETHYLENE BENZENE .
1 three successive samples
OSW u9465
WATER PCB-SD0000067196