Document zdnE4M5bMzXr8XBBdwq47VMK0
FILE NAME Corning OC
DATE 1966 Dec 30
DOC OC192
DOCUMENT DESCRIPTION Memo RE Kaylo Research & Development Monthly Report for Dec 1966
_
R. F. Shannon
KAYLO RESEARCH AND DEVELOP LENT
December 30 1766
2 A Laylo toen nosting was held at Berlin to rovies the status of the
stress corrosion program including abipping and test marketing programs
being conducted by I & Markoting Division Unfortunately explos
shipped to Delaware Insulation Company as part of the test erict
program found their way into a duPont plant and ultimately ultimately to a member
of duboat's insulation Consittes for examination His remarks
to
the
affect
that
be
would
not
okay
such
a
product
even
were
if it
the dupont 6 day stress corrosion survival
passed
test because it was too
wift Flans for the official duPont plant trial sobeduled for December 20
wers therefore canceled ponding clarification clarification by Marketing of the
situation with dupont
.
2 All ware produced at Berlin during the three trials made so far have passed Product Tosting Laboratory 6 and 10 day survival tests and have
averaged 31,000 PFA soluble silios at Lohigh There is no reason to
balieve the product when subutted to dupont for stress corrosion testing should not pass The problem is physical strengths The modulus of rupture hardness and oppressive strengths are slightly lower than standard laylo The product is however adequats to be
marketed as a special In fact except for compressive it meets our
current CAS
a
t
.
A study was conducted at the request of Manufacturing to determine the
effect possible conturination of X17 and R2 batch batch with the new stress
corrosion batoh would have on physical properties K17 and 2 bateb
vers intentionally contexinated with the stress corrosion batoh
dust made from the stress corrosion batoh and with the silicated
itsalf In all cases no significant advarse effect on the high
ature properties of either 17 or 20 was noted at contaxination
with
glass texper-
levels
A new Portland cement modified batch 10L6X2 10L6X2 after an extended
oraluation period at Berlin has resulted in in a stronger and harder product and has improved Plant afficiencies This batch his boen
rubaitted to Product Testing for evaluation for compliance with the CAS and for ultimate official cortification
&
A major major overhaul
SD gylinder vs
and packing ware
of Granville Kaylo proces aquipment including the carried out in December A new fan shaft basrings
installed
242 242
a
Mr. R. J. McEvoy
:
-2-
December 30 1966
6. Initial investigations directed toward the elimination of asbestos
fibers as rainforomment for Kayle wore undertaken Fibers under
include Rockwool metal fibers and cotton fibers Initial
itnevsetstdiagtaatiionndicate replacement of 50 of the asbestos currently in the product with 1/3 as much cotton string will mare than double impact
strengths
Considerable laboratory work was carried out to collect date nooded
7. for the preparation of the patent application covering our stress corrosion product The patent application will be filed in January
RFS
P. F. Shann
243