Document zdbZm69oreGj9Ex2nRVVEKXz6
UNITED STATESUNITED STATES ENVIRONMENTAL PROTECTION AGENCY
* *REGION 1
ENVIRONMENTAL
AGENCY5 POST OFFICEB OSSTQOUN,A RMAE ,0 21S0U9-I3T9E12
100
PROTECTION
Date:Dated as shown on electronic signature(s)
Subj:Inspection Report
Clean Water Act - National Pollutant Discharge Elimination
System (" NPDES ")
90 Depot Road Clearing
Digitally signed by
From:Damian Bednarz, InspectorDAMIAN BEDNARZ Date DAMIAN: 2023.10.12 BEDNARZ
09:53:43 -04'00 '
Thru:Stephanie Tougas, Inspector
To:File
I. Facility Information
A. Facility Name:90 Depot Road Clearing
B. Facility Location: 90 Depot Road, Hampstead, NH 03841
C. Facility Contacts: John Mason, Operator
6035539677, maisonbellellc@gmail.com
D. NPDES ID No (s).: NA, unpermitted
II. Background Information
A. Date(s) of inspection: August 30, 2023
B. Weather Conditions: 68 , light showers and cloudy
C. US EPA Representative(s):
Damian Bednarz
D. State / Local Representative(s):
NA
E. Federally Enforceable Requirements Covered During the Inspection:
National Pollutant Discharge Elimination System Construction General Permit (CGP)
(Effective February 17, 2022)
F. Previous Enforcement Actions:
None known
ED_019088A_00004259-00001
III. Type and Purpose of Inspection
Reconnaissance without Sampling
IV. Facility Description
The site at 90 Depot Road in Hampstead, NH (the " Site "), is a tree clearing of
approximately 4 acres. According to the town of Hampstead's Planning Board, this
clearing has occurred in preparation of the construction of multiple residential duplexes.
V. Inspection
This reconnaissance was prompted via anonymous citizen tip.
I arrived at the site at approximately 1:15 PM. Parking on the shoulder of Depot Road, all
observations found in this report and in the attached photo log were made from the public
roadway. No operations or construction was occuring at the time of this visit, and no Site
representatives were present. I did not observe any stormwater controls on site.
I observed a recently cut section of the forest, with numerous stumps left intact (slides 5-
7). I saw one stump that was taken out of the ground (slide 8). No log piles were observed
from the roadway, and several tire tracks were evident at the entrance of the site (slide 2).
The significant depth of the tracks indicated that heavy machinery was present during the
tree cutting project.
Earlier in the day a significant downpour affected this area of New Hampshire. As a
result, the Site featured many areas of pooling (slides 2-4), especially in areas where the
deep tracks were present in the soil.
Accumulated stormwater was observed to be leaving the Site towards the west along
Depot Road (slide 9-13). Flow was observed within 5 feet of Depot Road in street ditch
lines and culverts. This flow continued for about 400 feet until I reached a fire pond
(slides 14-16). I did not observe flow originating from the Site into the fire pond.
I departed at approximately 2:00 PM.
Unless otherwise noted, this report describes conditions at the facility / property as
observed by EPA inspector(s), and / or through records provided to and / or information
reported to EPA inspector(s) by facility representatives and as understood by the
inspector(s). This report may not capture all operations or activities ongoing at the time
of the inspection. This report does not make final determinations on potential areas of
concern. Nothing in this report affects EPA's authorities under federal statutes and
regulations to pursue further investigation or action.
2
ED_019088A_00004259-00002