I IN 1 CM CARBIDE CORPORATION Sol ven t s and Coatings Materials
Internal Cor-r espoiidc-nc t Texas City. Tex ...
T o: G. L. River a
1 Date: Aug 5, 1987
L. M. J . D. M.
E. J. A. P. T. L. M. L.
Monroe Par ker Ramos Mikowski Yalcinkaya Gor i s Hightower
Subject: Demolition Walk Thur
W Summary
RF
l 1 '} 1987
H F- A. DEPT.
Attached is a summary of items pointed out during walk thur of B-21 area and B-24 columns. Please send any comments me.
(1) CONCERN Check all motor starter and light switches in B-21 for PCB's.
(1) RESPONSE All motor were checked, 3 were found to contain more than 50 ppm PCB's. Light switches will be checked however very small total volume. All PCB's will be disposed per current procedures.
(2) CONCERN Dispose of mercury filled instruments before demolition work.
(2) RESPONSE All mercury filled instruments will be removed and dispose per
before B-21 demolition begins.
(3) CONCERN Remove fire water lines from B-21 or isolated from B-24 system.
(3) RESPONSE Fire water lines will be isolated from B-24 system and removed during demolition. B-24 Acids project will fund above action.
UCTC 18869
(4) CONCERN Isolate process any process sewers from plant system.
(4) RESPONSE All process sewers will be plugged and back tilled.
(5) CONCERN Dispose of any asbestos per plant procedures.
(5) RESPONSE B-21 and B-24 have been checked for asbestos. No asbestos has been found. B-24 old anhydride condenser may be contain possible asbestos insulation. Condenser in process of being checked.
(6) CONCERN Remove all drums and other materials inside B-21 before demolition.
(6) RESPONSE All drums and other materials will be removed before demolition begins.
(7) CDNCERN Detail plan for welding permits in B-21 area.
(7) RESPONSE Cutting torches will be allowed in B-21 area. Plant management approval is required, all procedures will be followed relating welding/cutting torches.
to
(8) CONCERN Schedule kick off meeting columns tear downs begin. procedures and manifested will be discussed.
with EP dept, before demolition and Items such as Gulf Coast Landfill waste/no-valve materials procedures
(8) RESPONSE A meeting will be scheduled before work begins with EP dept,
representative from Gulf Coast Landfill if needed.
and
Than k s,
tUu-G
J.L. Pedraza