ETHYL CORPORATION INTER-OFFICE To Distribution Address From Subject D. V. Melville Meeting Notes PVC Plant Shutdown Schedule Meeting - 8/23/78 Project 20281, VCI Emissions Reduction - EPA Address Date August 29, 1978 Participants: Messrs. W. R. Cooke E. C. D iamond J. L. Griffin G. W. Johnston F. B. Kramer W. E. Martin D. V. Melville P. L. Mihalik A. J. Parker R. K. Roy H. G . Smith W. R. Thayer J. R. Thompson Summary: A shutdown for the PVC plant was tentatively scheduled for the week beginning Monday, September 11, 1978. Tie-ins to process equipment for all remaining EPA project items will be made dur ing the plant shutdown. Start-up of the individual items will begin upon completion of construction for each item. Work to be Completed Prior to Shutdown: Item Title Description PVC-9 PVC Waste Water Stripper PVC-13 Post Vacuum Vent Controls PVC-4 & VCI Recovery System Rev. PVC-14 PVC-15 Degasser Stream O2 Analyzer -Buss tie-ins only will remain to be com pleted on 9/18/78. -No work to be completed prior to shutdown. Tie-ins will consist of pressure taps for D.P. Cells. -All piping, instrumentation, and electrical is to be installed prior to the shutdown or ready to be installed (as required) during the shutdown. -(10) sample connections are to be made to process piping. No preparatory work requir d before shutdown. EC 2481 -2- Item Title Description PVC-19 PVC-20 PVC-22 HC-12 PCO-7 PCO-9 Steam Purge System Additions Broken Batch Handling System Emergency Vent Prevention HC-PVC Tie-In Replace Degasser Vapor Line Valves D148B Level Instrumentation -Piping tie-ins to the post vacuum system for this item are to be made as equipment is made available prior to the shutdown. -Fabrication of some spool pieces is re quired for tie-ins prior to shutdown. -No preparatory work required. Tie-Ins to be made as required during the shut down. Engineering (Instrument Design) is to com plete instrument drawing no later than 9/6/78 so that modifications to the incinera tor controls can be studied by construction prior to the shutdown. -Construction to fabricate spool pieces to make up the face-to-face dimension difference between existing valves and the new valves. -Engineering is to provide a nozzle installa tion detail and procedure for D148B. Conclusion: The status of all preparatory work required for the plant shutdown will be reviewed closely by Engineering during the weekly construction meeting to be held on September 13, 1978. Any need to reschedule the plant shutdown will be determined at that meeting. DVM/mbt Distribution: Messrs. H. B. Beeson R. M. Carlson W. R. Cooke E. C. Diamond J. L. Griffin G.W. Johnston F.B. Kramer W. E. Martin P. L. Mihalik >D. V. Melville D . E . Park A. J . Parker L. R. Purker R. K. Roy H. G. Smith R. E. Summers W. R. Thayer J. R. Thompson prC 2482