Document zdXYaKnB8YeDok6r8mn9DJnj6

EPAClean Water Act Section 404: Site Visit / Case Development United States Environmental Protection AgencyFor inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) This report includes only factual information gained by documentation, onsite observations, and / or onsite interviews. Stephanie Tougas Inspector Name(s) Time In 10:00 AMStart Date July 23 2021 Time Out 11:00 AM End Date July 23, 2021 Inspector's Organization USEPA Organization Requesting Inspection (if different) Inspection Type EvaluationInspection Status Original Site NameBalch Bridge Street Corporation Site Address *222 South Main Street City * East WindsorCounty * HartfordState * CTZip Code * 06088 Mailing Address * PO Box 678 City East WindsorCounty HartfordState * CT Zip Code * 06088 Latitude * 41 52'40.55 " NLongitude * 72 36'40.95 " W Estimated Size of Site (acres) Approx 1-2 acresIs there a home on the site?YesNo Inspector Signature Date Effective August 2020Page 1 of 3 ED_019088A_00020626-00001 EPAClean Water Act Section 404: Site Visit / Case Development United States Environmental Protection AgencyFor inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) Site NameBalch Bridge Street Corporation Start Date July 23, 2021 End Date July 23, 2021 Inspection Purpose Joint inspection with CT DEEP, town of East Windsor, and USACE -tip received by town alleging violation. Presentation of Inspector Credentials Opening Conference Name and Title (Use N / A if owner / operator not available to join the inspection) Mr. James (Jim) Balch, property owner Opening Conference Name of person authorizing access if applicable Mr. Balch Notes from Opening Conference Mr. Balch stated that he did not respond to the Town's initial letters because he was sick with Covid-19 in the hospital. Mr. Balch and his attorney indicated to the Town, USACE, CTDEEP and EPA that he wanted to resolve the matter. Access Issues if Any Describe Inspection Observations and Sample Collection Site Owner / Site Operator / Responsible Party (Name, title and contact information) Mr. James (Jim) Balch, property owner Additional Persons Present at Inspection Mr. Balch, Mr. Balch's attorney, Brian Levin, Cori Rose (USACE), Ruthanne Calabrese (Town of East Windsor) Amanda Gurren (Town of East Windsor attorney), Brian Golembiewski (CTDEEP) General Site Characteristics (layout of property, etc.) Fill (possibly construction aggregate) adjacent to a stream and wetland and likely on top of a wetland based on surrounding vegetation. Approximately 1-2 acres of fill. West of the tributary is agricultural fields. Property extends half mile north and west from fill area. Purpose and Need for Discharge of Dredged and / or Fill Material Mr. Balch claimed the fill was for maintenance. Site Overview (Past inspections, site description, permits, etc.) The Town of East Windsor had been out to the site on 11-4-2020 to document alleged fill Scope of Inspection (Areas inspected or not inspected) The area where the fill had been deposited. Effective August 2020Page 2 of 3 ED_019088A_00020626-00002 EPAClean Water Act Section 404: Site Visit / Case Development United States Environmental Protection AgencyFor inspections authorized pursuant to Clean Water Act sections 308 and 404 (33 U.S.C. 1318 and 1344) Site NameBalch Bridge Street Corporation Start Date July 23, 2021 End Date July 23, 2021 Environmental Conditions (e.g., wind, rain, smoke, dust, temperature, snow) 75 degrees, dry, sunny Field Work Conducted We walked along the edge of the fill, documenting the fill, stream and vegetation with photographs. Closing Conference Documents Received and / or Requested During the Inspection N / A Compliance Assistance Provided (If any) N / A Observations Relayed to Site Owner / Operator Cori Rose informed Mr. Balch that there appeared to be a CWA section 404 violation. Cori explained that restoration would be necessary to resolve the matter and that Mr. Balch needs to work with the town to create a satisfactory restoration plan. Cori told him that before the restoration can occur, Mr. Balch needs to hire a wetlands scientist that can delineate the wetland area as well as determine the parent material below the fill. I informed Mr. Balch that EPA has the discretion to take an action and will be monitoring the matter and that he should cooperate with the town to restore the wetland. Actions Taken by Owner / Operator During the Inspection (If any) N / A Potential Issues of Concern Including Regulatory Citations Potential CWA Section 404 violation Maps and Sketches Photographs (including location) and Photo Log Other (SSIP, Wetlands Delineation Forms, etc.) Attachments * Additional Notes Effective August 2020Page 3 of 3 ED_019088A_00020626-00003