Document zd8O3z5BXgXb5mbaEwbzGeKLg
Ultimate Disposal of Wastes by Pyrolysis and Incineration
C. A. HESCHLES, FE and R. F. BONNER, JR., PE Malcolm Pirnie, Inc. White Plains, N.Y.
DISCUSSION by Herbert I. Hollander, PE, Staff Consul tant, Gilbert Associates, Inc., Reading, Pennsylvania
The progressive program outlined in this well written
paper is especially meaningful to me having participated
in the early efforts of the Pollution Control Committee of
the Cincinnati Chamber of Commerce, to find practical,
realistic and environmentally acceptable solutions for the
disposal of liquid/semi-Jiquid wastes of industry.
The Cincinnati Metropolitan Sewer District officials
and the participating Cincinnati Area industries must be
commended and respected for embarking on this land
mark cooperative undertaking.
The basic facilities design concept described by the
authors seems to parallel that attempted by a disposal
service firm in Logan Township, N.J. and no doubt many
of the problems experienced there will be avoided in
Cincinnati.
' .'
It is recognized that within the allotted length and
time for presentation the authors were obliged to limit
their depth of coverage if they were to address themselves
to all of die significant aspects of die project.
The questions to be raised and comments offered are
all meant to be constructive.
An overview of the facility concept reveals that provi
sions have been made to anticipate, monitor, store and
modestly condition those wastes from industry considered
to be acceptable for thermal processing in the systems to
be installed. The industrial wastes have been comprehen
sively identified and useful classifications developed.
A minimum waste flow rate will bo necessary to operate
die MSP facilities at break-even costs. Is this minimum
flow of specific wastes assured? Will all industries in
Cincinnati (Hamilton County)with non-sewerageable
liquid/semi-liquid wastes, be "obliged" to utilize the MSD
facilities? Will the MSD facility be capable of servicing
additional quantities of wastes___ serve new industrials
who will have wastes-amenable to the process? What are
the otherwaste disposal options available to the industrials?
Those wastes received at MSD, stored and then analyz
ed to be unacceptable must be disposed of somehow.
What provisions will MSD have for the management and
disposal of the rejected wastes which are on hand ... and
those on-going quantities being generated by industry?
Since finite storage of wastes will be provided at the
MSD facility what back-up or contingency program has
been established for possible prolonged outages of the
processing system? Continuity of service is essential to
avoid constipation. Will industry be required to also pro
vide redundant processing facilities (or extensive storage)
on their site?
.
Even for well designed processing systems for predic
table materials and flow rates there will come a time for
major overhaul or rehabilitation. Optimistically this will
occur at the scheduled outage but all too frequently the
necessity occurs at the most inopportune time.
Providing multiple processing trains or totally indepen
dent sub-systems avoids lire need for total outage of the
service facility. Independent systems are more costly than
a system with integrated inter-dependent elements. How
ever, they do provide higher availability of service since
they more readily permit implementing an effective
preventive maintenance and remedial program avoiding
the repetitive crisis situations which are so disconcerting
and so costly.
Integrated multi-purpose systems require sophisticated
controls. Complex controls and associated instruments
require almost continual maintenance to provide function
al reliability and safety. An "on-going" training program
for the cadre of operating personnel is essential that
33
05836**
TOWOLDMON0059393
they might react quickly and effectively when upsets occur
and rectify the circumstances themselves placing the
system back into reliable service in the shortest possible
time. Although the design "outlined" by the authors purports
to provide at least partial capacity when one of the inte
grated furnace systems is out of service, maintenance and
repair within the system would probably nevertheless
require complete shut-down and cooling.
Avery ambitious control program has been described
for the gas suction system through a set of controlling
dampers at the inlet of the "single" inducted draft fan.
The varying gas weights, gas temperatures and the inevi
table air Infiltration will prompt continual hunting,
perhaps maintaining a balanced modulating system under
all operating conditions will be attained. However, such
single multi-function gas suction control systems have
eventually led to wide open operation without any modu
lating control.
,
The commercial cyclone furnace for burning bitumin
ous coals at high heat release rates to provide ash slagging
temperatures, are water cooled. The refractory cyclone
furnace operation described with low excess air will
encounter high operating temperatures. The binders used
in re fractory materials become vunerable to chemical
attack at elevated temperatures. Perhaps some provision
is being made for heat extraction or cooling of the cyclone
furnace so as to prolong the life of its refractories.
The fluidized bed reactor system with its broad capa
bility to process a wide spectrum of liquid, semi-liquid
and solid wastes is available for processes requiring balanc
ed draft in the free board. The furnace temperature is
usually dictated by the process requirements with mater
ials of construction selected to suit. The massive heat sink
of the fluid bed in conjunction with the complete surface
exposure of the waste particles in the churning bed and
the intimate mixing of air with combustible permits
effective thermal reduction at lower temperatures even of
highly aqueous wastes. Plume suppression by heating or cooling is not only
expensive, but is only partially effective especially as
ambient temperatures descend to 50 F and below. The
complications to the system, the additional fans, power, and controls required can only make the system more
vulnerable to unscheduled outages all with questionable
benefit.
A wet scrubber for flue gas clean-up will require make
up water for that lost in the blowdown and the evapora-
'i.v loss in the slack. Since make-up water will be required
amlinuoibly. intiodueing it as wash water on the demister
elements may reduce or eliminate salt encrustment entirely.
The sad record of experience attempting to use grit laden slurry waters in spray nozzles has prompted the availability of Venturi scrubber systems using non-orificed open pipe water supply. No doubt a system of this design will be used on this project.
The adjustable throat Venturi does provide the designer and the operator an opportunity to accommodate the conditions as they are experienced in the field. However, if the furnace systems can be programmed to reasonably maintain designated temperatures, the wet gas flow through the Venturi will normally not vary widely. Therefore, once the optimum Venturi pressure drop is established, modu lating it will have little significance. The hardware and control complication.with its functional vulnerability could possibly be avoided.
An on-site thermo-chemical characterization program for the wastes as delivered is vital for safe handling, mix ing and thermal processing. Unfortunately the analysis procedures can become time consuming especially if the data is challenged. The vehicle time delay may be discon certing to the driver-hauler and those waiting to be served. No doubt some management program has been or will be developed to minimize these circumstances.
In regard to the intended thermo-chemical characteris tics to be obtained, it should be recognized that the ASTM/ BuM procedures for the Proximate Analysis was developed for coals. The volatile matter, fixed carbon relationship and their determination is strictly empirical and arbitrary. Since this data is only useful when compared with the library of similar data accumulated for coals there is a question whether the reaction rate characteristics they are intended to portray are valid for cellulosic, or petro leum base materials at the contemplated furnace operating temperatures. Determining the relative thermal reactivity of the various wastes to be encountered can be a most valuable operating guide since the rate of energy release can effect the surges in gas flow, gas temperature and even the refractory envelope. In recent years thermal gravi metric analysis techniques have been used to plot various parameters of energy release (burning profile) with time and temperature.
These techniques can also reveal whether the reaction will be endothermic, exothermic or at what condition (he reaction changes. The analysis procedure for a profile plot can usually be accomplished rather quickly.
Thus discussion has only focused on those areas consid ered to be of prime significance although there are other areas reported in this paper which warrant comment.
34
0536i/
<>
t
TOWOLDMONOQ59394
We will all be looking forward to the successful opera* tion of this facility and the precedent it establishes for mutually beneficial government -- industry cooperation.
We appreciate his contributions to the art of Waste Management and especially the interest in solutions to handle industrial wastes.
AUTHORS' REPLY
Mr. Hollander has presented some very thoughtful conimen ts in his discussion on our paper.
I[
35 53618
TOWOLDMONOQ59395