Document zd86b6n5E0z5rZzeYMenXROJ6

DownloadRandom document
Part A Response Part A - to be submitted within 24 hours of the incident Permit Number Name Of Operator Location Of Installation Time and date of the detection BU5453IY AGC Chemicals Europe Ltd Hillhouse International, Thornton Cleveleys, Lancashire 03/10/2023 (b) Notification requirements for the breach of a limit To be notified within 24 hours of detection unless otherwise specified below Emission point reference/source A1 Low Boiler Stack Parameter(s) Carbon monoxide (CO) Limit 25 tonnes in a year Measured value and uncertainty In September the annual CO emission exceeded 25 tonnes/year for 2023. Date and time of monitoring (week ending) Measures taken, or intended to be taken to stop the emission n/a An investigation involving the SHE department and the operations team is ongoing to identify the root cause of the higher PPM results recorded at A1 Low Boiler Stack for CO for 2022 and 2023. Combined Part B will be submitted for both 2022 and 2023 reportable incidents related to CO emissions. Name* Post Signature Date 03/10/2013 *authorised to sign on behalf of AGC Chemicals Europe