GPH-60 & 80 GAS BOILER
by
Am e rican " c^tandapd
Installation -Operation
AND
Maintenance Manual
I
FOR PACKAGED
GAS HEATING UNITS
APPROVED BY AMERICAN GAS ASSOCIATION
NOTICE TO INSTALLER AND OPERATOR
THIS BOOKLET MUST BE AFT IX ED ON
OR ADJACENT TO THE HEATING EQUIPMENT
...i _____ _ .
J
American
Plrca in htatlng ... first in plvmb si
BP-7950 REV.12-66
18789
GPH GAS BOILER
BOILER NUMBER
GPH-60
A 28f
8 24
C
GPH-80 31 ^8
2*11 e
NOTE: FOR GPH-60 CIRCULATOR LOCATED
ON LEFT SIDE (SHOWN) FOR GPH-80 CIRCULATOR LOCATED
ON RIGHT SIDE
1
GPH 60 & 8 0 GAS BOILERS
Fig, 1
18790
CPU CO U SO CAS U O IIA .R S
GPH CAS BOILER
2
package:
The- Cm Gee Poller 1b flhlppod In one perkage - the assembled boiler, ark! draftho-vi. The bollpr unit lo chipped In two sizes, the GPR-60 and CPTI-PO.
TNGTAI1ATI0N
This appliance should be Installed in accordance with the latest American Standards Association Inotructlcmo, "Installation of Gao Appliances and Gas Piping.* Reference should also be made to gas company regulations end local building, plimblng, or other cod^o that are In effect. Should any conflict exist between the A.8.A. or code Instructions and the following suggestions, the former must take precedence.
LOCATION
Careful consideration must be given to the location of the boiler in relation to any combustible material and to any obstacle which might Interfere with maintenance. This boiler hftB been approved for less than standard clearance as Indicated on Figure 2. Minimum clearances are measured from the boiler Jacket} however, practical service clearance must be measured with external components in mind (Sec Figure l) unlecs those parts are to be separated from the unit. ACCES3TBILITY CLEARANCE!! MUCT TAKE PRECEDENCE OVER FIRE PROTECTION CLEARANCES.
NOTE) 8" clearance on left side of boiler should be extended to 2 4" for access to control* if left closet panel is not removable.
Closet outline
Provisions must be made for combustion air where normal Infiltration Is not adequate (Fiill Ihsemente would normally provide adequate ventilation); either of two methods may be employed to insure proper circulation of air:
a. Two (2) openings -- one near the floor and one near the ceiling -- to interior space with normal infiltration, each with a minimum free area of one oquare inch per 1000 Btu per hour of the Input rating but with a minimum of 100 square Inches.
b. An opening to the outdoors with a minimum free area of one square inch per ^000 Btu per hour of the input rating.
NOT! F rom Vitw Side clearances, - " ,.nd i apply to GPU-Go Boik : . These dimensions anreversed for CPil-m ikult :
FIG. 2
18791
GPH r',s po t ;_rp
CONNECT IONS
The boiler should be roved in the shipping carton to its approximate
location and its carton removed. :.ir.i ng and handling of the boiler into
: i s final location "ay h-
easier w 1 ' b. a convenient length of pipe
screwed in', o the flow tanning cr. upper right-hand side.
A. drip 1ol; piping a rrangerc-1 shot.Id be installed between the main gas line and The boiler, as sh'1 in Fig. 3.
It is essential that a ground 'oint union be installed between a tee in the drip leg and the connection at the boiler gas valve.
CAUTION -- Before the gas pining system is put into service, it must be carefully tested to insure a gas-tight arrangement; a soap and water solution, or other acceptable material, should be used in testing for leaks.
'.P ll no and G PU HO B O ILE R S
MAI
SH'J VA
MAIN G0^A0S LINE
40'To60`
<3
/------pilot Filter -for USE / with MANUFACTURED GAS AND
natural gas where
D By t[ LOCAL utility
pilot shutoff
N"[FVJAL
tlaml adjustment
TO PiLO OR
GA?, VA.Vf
Recommended piping when Aux. manual shutoff valve or separate manual shutoff valve and automatic gas valve are supplied.
TO MANUAL SHUTOFF VALVE ON APPLIANCE
TLOOR UNC ~7
NOTE; All piping shown not supplied by ATUbSS Corp. T Tf
18792
G PH 60 & 80 GAS BO ILERS
GPH CAS
4
~0 r ^ ;
'v :
Capacity of Pipes in Cu -1 c Feet of Gas Per Hour
Length of Pipe in Feet
3A"
Pipe Size
10 20
30 90 50
75 100
212
150 122
105 53 77 DO
-25 300 2-2 2!o
195 loO
139
725 510
425 370
330 270
232
The supply to the heating system must be connected to the boiler at the upper right-hand side or top (see Page 9 for recommended hook-ups). The water return is connected to the circulator on the lower ieft-nand side (right-hand side for GPH-50).
Installation of a conventional-type expansion tank is recommended
since the GPH boiler induces me "Eiiml.oalre Principle" wnlch directs
air, released by the nesting of water, out the top of me boiler.
No air removing or separator; device need be added to the seating
system because tne released air is directed into the expansion tank.
The expansion tank must be installed with its connecting opening
aligned vertically witn. tne tapping on top of tne ooiler. Tne
pressure relief valve must be put in the bran.cn of tne pipe tee.
In locating the tank, particularly cold or exposed places s.houlc not
be utilized, to avoid tne possible serious damage resulting from
freezing. A closed valve in. tne plpv
tne expansion tank during
operation of the boiler may cause equal carnage.
A pre-pressured diap.nrag.m-type tank may be installed in lieu of tne conventional tank. If employee, it is important that an automatic air vent be Installed to relieve air from tne system.
Recommended and alternate methods of expansion tank hook-ups are shown on Page 9.
A gate valve (for purging) snould be installed as close as practical to the boiler outlet '(see "Fill Procedure" on Page 8),
If an automatic fill valve is installed, it 1b recommended that a bypass (with shut-off valve) be piped around the valve so that full water flow rates may be used tn adequately purge tne system of air on initial fill.
30 psi relief valves are standard equipment on GPH boilerB; nowever, the boilers are suitable for use wit.n 50 csi relief valves, if required.
18793
GPH-60 THRU GPH-170 GAS BOILERS
GPH GAS BOILER
The drafthood must be installed on top of the boiler, and flue connection made from the drafthood to the gaB vent or chimney with a minimum of 1/4" pitch per foot of horizontal run. The flue connector should be at least as large aa the drafthood outlet. Care should be exercieed to avoid blocking the chimney by extending the flue pipe beyond the Inside wall of the chimney. When two or more appliances vent into a common flue, the area of the common flue must at least equal the area of the largest flue plus 50 per cent of the areas of the additional flues. An electric service line must be run from a switch to the Junction box, or--wlth self-energizing controls--to the circulator. Por multiple zone installations, the wiring instructions accompanying a zone control valve set should be followed. Other wiring will have been completed at the factory. At the beginning of the heading season the manual switch in the electric service line must be closed to start the circulator pump which will then concr.artly circulate water cf varying temperatures, depending upon the heat requirements. At the end of the heating season, the manual switch should be opened.
18794
CPU GAS BOILERS
C
GPU - 60 & 80 BOILKRS
GPH - 60
GPH - 80
LC Of NO -
WB - BNHl*1CTJ*
- WCO
BR-BROWN
MOT
l <Nf
c*To"
L 'Nt
---- e 'V
/
NoOo' T Tf ut oRNl ^iN*'ttDa
ll-G -15511 Rev. D
RQBCCCOAt0BOT t LWf *TWl*'O'CNCiR. CDOIALG*RTA|OMN
18795
GPH GAS BOILERS
7
GPH 60 & 8 0 GAS BOILERS
____________
LINE ,
CRC -
1I
^1
DOTTED LINES
|B
NOT FURNISHED w I
II
R- RED
EM||
CIRCULATOR
GPH 60 AND 80 GAS BOILER WIRING DIAGRAM FORCED HOT WATER CIRCULATION, SELF-ENERGIZING CONTROLS
18795
. GPH GAS BOILER
RETURN
A
CONVENTIONAL
^^EXPANSION TANK
WATER
SUPPLY
IP DIARDUG* TP7E EXPANSION TANK 19
USED AUTOMATIC VENT VALVE SHOULD BE INSTALLED IN
CHECK VALVE (IF U3EDJ
THIS LOCITIW
BAJ>NC1NG COCKS
OM ZONE YALVC3
4--rH-------------- K
GPH-60 THRU GPH-170 gas b l r s .
vo
CIRCULATOR'
ON A SINGLE CIRCUIT JOB BALANCING COCKS AND ZONE VALVES NOT NEEDED
Pig. 6
PILLING
The following procedure should be used to fill a series loop Heatrlm System (See Figure 6).
1. Close all zone valves except the or.e for the zone to be filled with water and purged of air.
2. Open the drain valve on the boiler. 3. Open the fill valve. 4. Close the purge valve. 5. Open the relief valve. 6. Open the valve to the second zone to be purged; then close the first
Repeat this step until all zones have been purged of air and filled with water; but always have one zone open. (Zones are purged and filled when water can be felt m tne pipe at tne end of the zone). 7. Close the drain valve. 8. When water appears, release the lever on the relief valve, allowing it to close. 9. Continue filling the system until the pressure gauge reads 12 psl without heat; close the fill valve. 10, Open the purge valve. 11. For quietest operation, check the gauge pressure with the system at 200 F. Adjust the pressure to 25 psl If a 30 psl relief valve Is employed and 40 psi when a 50 psi relief valve is used. If an automatic fill valve is used, it may be necessary to readjust the setting of the valve to allow a higher fill pressure with the system cold to obtain desired pressure wltn the system at 200 F.
Following the completion of the installation, a thorough check should be rrn of the entire hydronlc system to locate possible leaks.
If a diaphragm-type expansion tank is used, it may be necessary to increas' the initial air pressure in the tank with the system cold to insure adequa expansion volume. Tnese tanks are usually fitted with a tire valve for th. purpose.
18797
GPH GAS BOILER
EXPANSION TANK
q
VALVE
TO SYSTEM
RECOMMENDED HOOK-UP USING CONVENTIONAL EXPANSION TANK
AUTOMATIC
WATER
GPH 6 0 THRU GPH- 170-
ALTERNATE HOOK-UPS USING DIAPHRAGM-TYPE EXPANSION TANKS
18798
OPH GA3 BOI LUl
10
If this boiler la used in connection with refrigeration systems, tne boiler must be Installed so that the chilled medium Is piped parallel with the boiler, using appropriate valves to prevent the chilled medium from entering the boiler.
RECOMMENDED BOU.iR PIFNNG FOR COMBINATION HEATING a COOLING UNITS
Fig. 7 If this boiler is connected to heating coils in ar. air handling unit ./here coils may be exposed to refrigerated air# the boiler piping system must be equipped with flow control valves to prevent gravity circulation of boiler water during the operation of the cooling system. That safeguard will help prevent condensation on the boiler ana mere:ore, corrosion damge.
18799
GPH GAS BOILER
i:
GPH-60 THRU GPH-170 GAS BLRS.
pig. 8
OPERATION
The homeowner should occasionally check the readings on the gauge located on the front of the boiler. The lower scale Indicates the water temperature within the boiler-; ana, should the water exceed 250 F, operation must be discontinued until the system is checked and the fault corrected. The upper scale indicates the pressure within the system and should not exceed 30 Ids (50 lbs with 50-lb relief valve).
In a closed system the boiler and piping are entirely filled wltn water except for a cushion of air in tne upper portion of tne expansion tank. When the water is heated, it expands, compressing the air. If, for any reason, tnis air were completely displaced from the tank, there would no longer be a cushion. In that event an increase in water temperatures would cause a corresponding Increase in volume and pressure would force the relief valve open to discharge the excess volume. To correct such a condition, the expansion tank must be drained enough to permit the tank to fill with air.
The boiler is equipped with an adjustable limit control with a mechanical stop at 220 F. This setting can be reduced for lower system design temperatures.
18800
GPH - 60 & 80 BOILERS
GPH GAS BJERS
INSTRUCTIONS FOR SH7JTriING OFF AND LIGHTING MANUAL IGNITI??; -100% SHUTOFF 24 VOLT OR f-ELF ENERGIZING
TO SHUT OFF: 1. DEPRESS THE MANUAL GAS COCK KNOB AND TURN TO "OFF". TO LIGHT: 1. SET ROOM THERMOSTAT TO LOWEST TEMPERATURE. 2. BE SURE MANUAL GAS COCK KNOB HAS BEEN TURNED
TO "OFF" POSITION FOR AT LEAST FIVE (5) MINUTES BEFORE PROCEEDING. 3. DEPRESS KNOB AND TURN TO "PILOT". LIGHT PILOT BURNER HOLDING KNOB DOWN APPROXIMATELY ONE MINUTE. 4. TURN KNOB TO "ON" AND SET THERMOSTAT TO DESIRED TEMPERATURE. 382850-317-906
PILOT REMOVAL & INST/.L .ATION TO REMOVE:
PULL SPRING CLIP (T) TO RIGHT APPROX 1/2 INCH AND PULL PILOT ASSEMBLY OUT. TO INSTALL PULL SPRING CLIP (T) TO RIGHT AND PJ PILOT ASSEMBLY IN MAKING SURE PILCT BRACKET FLANGE () SLIDES INSIDE VERT' T WALL OF BURNER DRAWER AS SHOWN.
12
GAS COCK KNOB
GPH GAS BOILER Normal Pilot Input (Per burner Btu/hr.)
13 Re
Natural Mixed Liquid Petroleum (LP)
1 -luO 1,200 1,000
Manifold Pressure Adjustment for Main Burner
After the boiler has been in operation for fifteen minutes, all other gas appliances (including pilots) should be shut off and the consumption should be timed. The boiler input should be adjusted to the rated input, indicated on the nameplate attached to the boiler jacket, in accordance with the
following procedure.
6 0 THRU GPH 1 7 0 BOILERS
Input Rating (Btu/Hr .) Gas Consumption (Cubic I-ret per Hour) - Heating Value of Gas (Btu/Cu. Ft)
The manifold gas pressure snould be checked with a manometer or pressure gage connected to the 1/S pipe pressure tapping located either on the manifold or bottom of actoi-atir gas valve.
The pressure should be set at 3.6 iwc for natural and mixed gas, in no rase, should the final manifold pressure vary
more than C.3 iwc eiilv-r \ ay. Tc. adjust the pressure, the protective cap on the regulator uaeulc tc rer: ,eo' and the adjusting screw should be turned clockwise tc. raise- . nc- pressure or counterclockwise to lower the pressure. The protective cap should be returned to its former position. Only small adjustments ii pas i*ow may be made with this regulator; major changes in the flov must bt mace through modification of the burner orific
MAIN BURNER AIR Aid i d/.-'ZKT (Sec Pace 14 A)
The burner flame should be adjusted, by opening or closing the primary
O shutter, so that i: Vor-.s
- 2y .ud so that it shows no yellow but has
a noticeable blue inner core. F;liewing the adjustment, the screw should
be tightened carefully -,.o loci, the shutter in the correct position.
OPERATION DURING ELECTRICAL P0V.tr FAILURE
The GPH Boiler equipped with self-energizing controls will continue to provide heat without electrical rover if the boiler is located below the heating system such as in a basement installation. THE BURNER FLAME SHOULD BE REDUCED DURING ELECTRICAL PO'VLR FAILURES TO 1/3 or 1/4 ITS NORMAL SIZE through a partial closing of the manual shutoff valve. Although the burnej equipped with self-energizing controls will continue to operate without adjustment and without damaere to the boiler, the reduction in flame size
will help offset the loss of the circulating action in maintaining an even but reduced heat. The shutoff valve should be returned to its normal position immediately upon the re-establishment of electric power if the most efficient and effective operation is to be obtained. Flow control valves should be opened during power failure operation. Upon resumption of power, return flow valves to original position.
18802
BOILER CARE
GPH GAS BOILER
i Rev
It 1b good practice with any boiler to Inspect it yearly and clean and adjust it, if necessary.
Cleaning
For maximum efficiency and safe operation, burners and boiler flue passages should be inspected and cleaned, if necessary, once a year.
Inspection procedure:
1. Turn manual gas control valve to off position.
2. Remove manifold cover on front of the boiler.
3. Remove burner access door (see Fig. 10) by pulling straight out.
4. Remove burners by lifting them at rear, push toward rear and then pull out.
5. Check burner gas ports to see that they are free of scale, , lint and dirt. CLEANING BURNERS: Burners can be cleaned
simply by blowing through ports and shaking foreign material out.
6. Section cleanliness can be checked with a mirror and light inserted in the opening where the burners have been removed.
Section Cleaning:
If section inspection reveals they are sooted or contain considerable scale, cleaning can be accomplished by the following steps (burners should be removed before cleaning sections) :
1. Remove flue pipe, drafthood, jacket top, canopy, and baffle (no baffle on GPH-170).
2. Clean sections with flue brush (see Fig. 9).
3. Reassemble, making sure baffle is seated over pins in top section bo that it is located properly.
\
4. Install burners and relight pilot.
5. Check burner operation (see Page 14a).
GPH-60 THRU GPH-170
18803
GPH GAS BOILER
I4A
Burner Adjustment,
It is recommended that burner air adjustment be checked as follows:
Natural Gas - The most efficient operation is obtained with the air shutters adjusted to maximum opening.
Mixed Gas
- Adjust air shutters to give inner flame height of approxi mately 1/4 to 1/2 inch with no yellow in flame.
LP (Bottled)- LP burner flames must be Gas adjusted properly to prevent excessive burner port tempera
tures. Adjust air shutter to give blue-green inner flame without any traces of yellow in flame. (see illustrations).
YELLOW TIPS (CAUSES CARBON FORMATIONS IN BOILER FLUES)
LAZY, GREEN INNER FLAME
NOT ENOUGH PRIMARY AIR
SHARP, BLUE, HARD INNER FLAME (OVERHEATS BURNERS)
TOO MUCH PRIMARY AIR
SOFT, BLUE-GREEN INNER FLAME
WRONG
RIGHT
PERIODS OF NON-USE
When the boiler is out of operation focr periods of any considerable length, the electricity and all gas connections may be shut off, although no damage would occur and very little operating cost would be Involved if not shut off.
Under normal operating conditions THE HEATING SYSTEM SHOULD NEVER BE DRAINED; however, if the boiler is not used during the winter months, and if adequate protection is not supplied to avoid the possibility of water freezing anywhere in the system, the entire system should be drained.
G P H -60 and 80
18804
GPH GAS BOILERS
1.
o z ' or ou.
in
i .: UoJ i u<
GPH 60 & 80 BOILERS-
o z o u, cc
=> O
0 -J u*
IA U.
71' o2 1U0J 0- - u
<3o*0<
cXo o <z
18805
HdO
GPH GAS BOILERS
18806
SECTION THRU COMBUSTION CHAMBER SHOWING PILOT TO BURNER ASSEMBLY
1