Document zd7o4N3Dwv53DrwVX9VQeEZ3R

GPH-60 & 80 GAS BOILER by Am e rican " c^tandapd Installation -Operation AND Maintenance Manual I FOR PACKAGED GAS HEATING UNITS APPROVED BY AMERICAN GAS ASSOCIATION NOTICE TO INSTALLER AND OPERATOR THIS BOOKLET MUST BE AFT IX ED ON OR ADJACENT TO THE HEATING EQUIPMENT ...i _____ _ . J American Plrca in htatlng ... first in plvmb si BP-7950 REV.12-66 18789 GPH GAS BOILER BOILER NUMBER GPH-60 A 28f 8 24 C GPH-80 31 ^8 2*11 e NOTE: FOR GPH-60 CIRCULATOR LOCATED ON LEFT SIDE (SHOWN) FOR GPH-80 CIRCULATOR LOCATED ON RIGHT SIDE 1 GPH 60 & 8 0 GAS BOILERS Fig, 1 18790 CPU CO U SO CAS U O IIA .R S GPH CAS BOILER 2 package: The- Cm Gee Poller 1b flhlppod In one perkage - the assembled boiler, ark! draftho-vi. The bollpr unit lo chipped In two sizes, the GPR-60 and CPTI-PO. TNGTAI1ATI0N This appliance should be Installed in accordance with the latest American Standards Association Inotructlcmo, "Installation of Gao Appliances and Gas Piping.* Reference should also be made to gas company regulations end local building, plimblng, or other cod^o that are In effect. Should any conflict exist between the A.8.A. or code Instructions and the following suggestions, the former must take precedence. LOCATION Careful consideration must be given to the location of the boiler in relation to any combustible material and to any obstacle which might Interfere with maintenance. This boiler hftB been approved for less than standard clearance as Indicated on Figure 2. Minimum clearances are measured from the boiler Jacket} however, practical service clearance must be measured with external components in mind (Sec Figure l) unlecs those parts are to be separated from the unit. ACCES3TBILITY CLEARANCE!! MUCT TAKE PRECEDENCE OVER FIRE PROTECTION CLEARANCES. NOTE) 8" clearance on left side of boiler should be extended to 2 4" for access to control* if left closet panel is not removable. Closet outline Provisions must be made for combustion air where normal Infiltration Is not adequate (Fiill Ihsemente would normally provide adequate ventilation); either of two methods may be employed to insure proper circulation of air: a. Two (2) openings -- one near the floor and one near the ceiling -- to interior space with normal infiltration, each with a minimum free area of one oquare inch per 1000 Btu per hour of the Input rating but with a minimum of 100 square Inches. b. An opening to the outdoors with a minimum free area of one square inch per ^000 Btu per hour of the input rating. NOT! F rom Vitw Side clearances, - " ,.nd i apply to GPU-Go Boik : . These dimensions anreversed for CPil-m ikult : FIG. 2 18791 GPH r',s po t ;_rp CONNECT IONS The boiler should be roved in the shipping carton to its approximate location and its carton removed. :.ir.i ng and handling of the boiler into : i s final location "ay h- easier w 1 ' b. a convenient length of pipe screwed in', o the flow tanning cr. upper right-hand side. A. drip 1ol; piping a rrangerc-1 shot.Id be installed between the main gas line and The boiler, as sh'1 in Fig. 3. It is essential that a ground 'oint union be installed between a tee in the drip leg and the connection at the boiler gas valve. CAUTION -- Before the gas pining system is put into service, it must be carefully tested to insure a gas-tight arrangement; a soap and water solution, or other acceptable material, should be used in testing for leaks. '.P ll no and G PU HO B O ILE R S MAI SH'J VA MAIN G0^A0S LINE 40'To60` <3 /------pilot Filter -for USE / with MANUFACTURED GAS AND natural gas where D By t[ LOCAL utility pilot shutoff N"[FVJAL tlaml adjustment TO PiLO OR GA?, VA.Vf Recommended piping when Aux. manual shutoff valve or separate manual shutoff valve and automatic gas valve are supplied. TO MANUAL SHUTOFF VALVE ON APPLIANCE TLOOR UNC ~7 NOTE; All piping shown not supplied by ATUbSS Corp. T Tf 18792 G PH 60 & 80 GAS BO ILERS GPH CAS 4 ~0 r ^ ; 'v : Capacity of Pipes in Cu -1 c Feet of Gas Per Hour Length of Pipe in Feet 3A" Pipe Size 10 20 30 90 50 75 100 212 150 122 105 53 77 DO -25 300 2-2 2!o 195 loO 139 725 510 425 370 330 270 232 The supply to the heating system must be connected to the boiler at the upper right-hand side or top (see Page 9 for recommended hook-ups). The water return is connected to the circulator on the lower ieft-nand side (right-hand side for GPH-50). Installation of a conventional-type expansion tank is recommended since the GPH boiler induces me "Eiiml.oalre Principle" wnlch directs air, released by the nesting of water, out the top of me boiler. No air removing or separator; device need be added to the seating system because tne released air is directed into the expansion tank. The expansion tank must be installed with its connecting opening aligned vertically witn. tne tapping on top of tne ooiler. Tne pressure relief valve must be put in the bran.cn of tne pipe tee. In locating the tank, particularly cold or exposed places s.houlc not be utilized, to avoid tne possible serious damage resulting from freezing. A closed valve in. tne plpv tne expansion tank during operation of the boiler may cause equal carnage. A pre-pressured diap.nrag.m-type tank may be installed in lieu of tne conventional tank. If employee, it is important that an automatic air vent be Installed to relieve air from tne system. Recommended and alternate methods of expansion tank hook-ups are shown on Page 9. A gate valve (for purging) snould be installed as close as practical to the boiler outlet '(see "Fill Procedure" on Page 8), If an automatic fill valve is installed, it 1b recommended that a bypass (with shut-off valve) be piped around the valve so that full water flow rates may be used tn adequately purge tne system of air on initial fill. 30 psi relief valves are standard equipment on GPH boilerB; nowever, the boilers are suitable for use wit.n 50 csi relief valves, if required. 18793 GPH-60 THRU GPH-170 GAS BOILERS GPH GAS BOILER The drafthood must be installed on top of the boiler, and flue connection made from the drafthood to the gaB vent or chimney with a minimum of 1/4" pitch per foot of horizontal run. The flue connector should be at least as large aa the drafthood outlet. Care should be exercieed to avoid blocking the chimney by extending the flue pipe beyond the Inside wall of the chimney. When two or more appliances vent into a common flue, the area of the common flue must at least equal the area of the largest flue plus 50 per cent of the areas of the additional flues. An electric service line must be run from a switch to the Junction box, or--wlth self-energizing controls--to the circulator. Por multiple zone installations, the wiring instructions accompanying a zone control valve set should be followed. Other wiring will have been completed at the factory. At the beginning of the heading season the manual switch in the electric service line must be closed to start the circulator pump which will then concr.artly circulate water cf varying temperatures, depending upon the heat requirements. At the end of the heating season, the manual switch should be opened. 18794 CPU GAS BOILERS C GPU - 60 & 80 BOILKRS GPH - 60 GPH - 80 LC Of NO - WB - BNHl*1CTJ* - WCO BR-BROWN MOT l <Nf c*To" L 'Nt ---- e 'V / NoOo' T Tf ut oRNl ^iN*'ttDa ll-G -15511 Rev. D RQBCCCOAt0BOT t LWf *TWl*'O'CNCiR. CDOIALG*RTA|OMN 18795 GPH GAS BOILERS 7 GPH 60 & 8 0 GAS BOILERS ____________ LINE , CRC - 1I ^1 DOTTED LINES |B NOT FURNISHED w I II R- RED EM|| CIRCULATOR GPH 60 AND 80 GAS BOILER WIRING DIAGRAM FORCED HOT WATER CIRCULATION, SELF-ENERGIZING CONTROLS 18795 . GPH GAS BOILER RETURN A CONVENTIONAL ^^EXPANSION TANK WATER SUPPLY IP DIARDUG* TP7E EXPANSION TANK 19 USED AUTOMATIC VENT VALVE SHOULD BE INSTALLED IN CHECK VALVE (IF U3EDJ THIS LOCITIW BAJ>NC1NG COCKS OM ZONE YALVC3 4--rH-------------- K GPH-60 THRU GPH-170 gas b l r s . vo CIRCULATOR' ON A SINGLE CIRCUIT JOB BALANCING COCKS AND ZONE VALVES NOT NEEDED Pig. 6 PILLING The following procedure should be used to fill a series loop Heatrlm System (See Figure 6). 1. Close all zone valves except the or.e for the zone to be filled with water and purged of air. 2. Open the drain valve on the boiler. 3. Open the fill valve. 4. Close the purge valve. 5. Open the relief valve. 6. Open the valve to the second zone to be purged; then close the first Repeat this step until all zones have been purged of air and filled with water; but always have one zone open. (Zones are purged and filled when water can be felt m tne pipe at tne end of the zone). 7. Close the drain valve. 8. When water appears, release the lever on the relief valve, allowing it to close. 9. Continue filling the system until the pressure gauge reads 12 psl without heat; close the fill valve. 10, Open the purge valve. 11. For quietest operation, check the gauge pressure with the system at 200 F. Adjust the pressure to 25 psl If a 30 psl relief valve Is employed and 40 psi when a 50 psi relief valve is used. If an automatic fill valve is used, it may be necessary to readjust the setting of the valve to allow a higher fill pressure with the system cold to obtain desired pressure wltn the system at 200 F. Following the completion of the installation, a thorough check should be rrn of the entire hydronlc system to locate possible leaks. If a diaphragm-type expansion tank is used, it may be necessary to increas' the initial air pressure in the tank with the system cold to insure adequa expansion volume. Tnese tanks are usually fitted with a tire valve for th. purpose. 18797 GPH GAS BOILER EXPANSION TANK q VALVE TO SYSTEM RECOMMENDED HOOK-UP USING CONVENTIONAL EXPANSION TANK AUTOMATIC WATER GPH 6 0 THRU GPH- 170- ALTERNATE HOOK-UPS USING DIAPHRAGM-TYPE EXPANSION TANKS 18798 OPH GA3 BOI LUl 10 If this boiler la used in connection with refrigeration systems, tne boiler must be Installed so that the chilled medium Is piped parallel with the boiler, using appropriate valves to prevent the chilled medium from entering the boiler. RECOMMENDED BOU.iR PIFNNG FOR COMBINATION HEATING a COOLING UNITS Fig. 7 If this boiler is connected to heating coils in ar. air handling unit ./here coils may be exposed to refrigerated air# the boiler piping system must be equipped with flow control valves to prevent gravity circulation of boiler water during the operation of the cooling system. That safeguard will help prevent condensation on the boiler ana mere:ore, corrosion damge. 18799 GPH GAS BOILER i: GPH-60 THRU GPH-170 GAS BLRS. pig. 8 OPERATION The homeowner should occasionally check the readings on the gauge located on the front of the boiler. The lower scale Indicates the water temperature within the boiler-; ana, should the water exceed 250 F, operation must be discontinued until the system is checked and the fault corrected. The upper scale indicates the pressure within the system and should not exceed 30 Ids (50 lbs with 50-lb relief valve). In a closed system the boiler and piping are entirely filled wltn water except for a cushion of air in tne upper portion of tne expansion tank. When the water is heated, it expands, compressing the air. If, for any reason, tnis air were completely displaced from the tank, there would no longer be a cushion. In that event an increase in water temperatures would cause a corresponding Increase in volume and pressure would force the relief valve open to discharge the excess volume. To correct such a condition, the expansion tank must be drained enough to permit the tank to fill with air. The boiler is equipped with an adjustable limit control with a mechanical stop at 220 F. This setting can be reduced for lower system design temperatures. 18800 GPH - 60 & 80 BOILERS GPH GAS BJERS INSTRUCTIONS FOR SH7JTriING OFF AND LIGHTING MANUAL IGNITI??; -100% SHUTOFF 24 VOLT OR f-ELF ENERGIZING TO SHUT OFF: 1. DEPRESS THE MANUAL GAS COCK KNOB AND TURN TO "OFF". TO LIGHT: 1. SET ROOM THERMOSTAT TO LOWEST TEMPERATURE. 2. BE SURE MANUAL GAS COCK KNOB HAS BEEN TURNED TO "OFF" POSITION FOR AT LEAST FIVE (5) MINUTES BEFORE PROCEEDING. 3. DEPRESS KNOB AND TURN TO "PILOT". LIGHT PILOT BURNER HOLDING KNOB DOWN APPROXIMATELY ONE MINUTE. 4. TURN KNOB TO "ON" AND SET THERMOSTAT TO DESIRED TEMPERATURE. 382850-317-906 PILOT REMOVAL & INST/.L .ATION TO REMOVE: PULL SPRING CLIP (T) TO RIGHT APPROX 1/2 INCH AND PULL PILOT ASSEMBLY OUT. TO INSTALL PULL SPRING CLIP (T) TO RIGHT AND PJ PILOT ASSEMBLY IN MAKING SURE PILCT BRACKET FLANGE () SLIDES INSIDE VERT' T WALL OF BURNER DRAWER AS SHOWN. 12 GAS COCK KNOB GPH GAS BOILER Normal Pilot Input (Per burner Btu/hr.) 13 Re Natural Mixed Liquid Petroleum (LP) 1 -luO 1,200 1,000 Manifold Pressure Adjustment for Main Burner After the boiler has been in operation for fifteen minutes, all other gas appliances (including pilots) should be shut off and the consumption should be timed. The boiler input should be adjusted to the rated input, indicated on the nameplate attached to the boiler jacket, in accordance with the following procedure. 6 0 THRU GPH 1 7 0 BOILERS Input Rating (Btu/Hr .) Gas Consumption (Cubic I-ret per Hour) - Heating Value of Gas (Btu/Cu. Ft) The manifold gas pressure snould be checked with a manometer or pressure gage connected to the 1/S pipe pressure tapping located either on the manifold or bottom of actoi-atir gas valve. The pressure should be set at 3.6 iwc for natural and mixed gas, in no rase, should the final manifold pressure vary more than C.3 iwc eiilv-r \ ay. Tc. adjust the pressure, the protective cap on the regulator uaeulc tc rer: ,eo' and the adjusting screw should be turned clockwise tc. raise- . nc- pressure or counterclockwise to lower the pressure. The protective cap should be returned to its former position. Only small adjustments ii pas i*ow may be made with this regulator; major changes in the flov must bt mace through modification of the burner orific MAIN BURNER AIR Aid i d/.-'ZKT (Sec Pace 14 A) The burner flame should be adjusted, by opening or closing the primary O shutter, so that i: Vor-.s - 2y .ud so that it shows no yellow but has a noticeable blue inner core. F;liewing the adjustment, the screw should be tightened carefully -,.o loci, the shutter in the correct position. OPERATION DURING ELECTRICAL P0V.tr FAILURE The GPH Boiler equipped with self-energizing controls will continue to provide heat without electrical rover if the boiler is located below the heating system such as in a basement installation. THE BURNER FLAME SHOULD BE REDUCED DURING ELECTRICAL PO'VLR FAILURES TO 1/3 or 1/4 ITS NORMAL SIZE through a partial closing of the manual shutoff valve. Although the burnej equipped with self-energizing controls will continue to operate without adjustment and without damaere to the boiler, the reduction in flame size will help offset the loss of the circulating action in maintaining an even but reduced heat. The shutoff valve should be returned to its normal position immediately upon the re-establishment of electric power if the most efficient and effective operation is to be obtained. Flow control valves should be opened during power failure operation. Upon resumption of power, return flow valves to original position. 18802 BOILER CARE GPH GAS BOILER i Rev It 1b good practice with any boiler to Inspect it yearly and clean and adjust it, if necessary. Cleaning For maximum efficiency and safe operation, burners and boiler flue passages should be inspected and cleaned, if necessary, once a year. Inspection procedure: 1. Turn manual gas control valve to off position. 2. Remove manifold cover on front of the boiler. 3. Remove burner access door (see Fig. 10) by pulling straight out. 4. Remove burners by lifting them at rear, push toward rear and then pull out. 5. Check burner gas ports to see that they are free of scale, , lint and dirt. CLEANING BURNERS: Burners can be cleaned simply by blowing through ports and shaking foreign material out. 6. Section cleanliness can be checked with a mirror and light inserted in the opening where the burners have been removed. Section Cleaning: If section inspection reveals they are sooted or contain considerable scale, cleaning can be accomplished by the following steps (burners should be removed before cleaning sections) : 1. Remove flue pipe, drafthood, jacket top, canopy, and baffle (no baffle on GPH-170). 2. Clean sections with flue brush (see Fig. 9). 3. Reassemble, making sure baffle is seated over pins in top section bo that it is located properly. \ 4. Install burners and relight pilot. 5. Check burner operation (see Page 14a). GPH-60 THRU GPH-170 18803 GPH GAS BOILER I4A Burner Adjustment, It is recommended that burner air adjustment be checked as follows: Natural Gas - The most efficient operation is obtained with the air shutters adjusted to maximum opening. Mixed Gas - Adjust air shutters to give inner flame height of approxi mately 1/4 to 1/2 inch with no yellow in flame. LP (Bottled)- LP burner flames must be Gas adjusted properly to prevent excessive burner port tempera tures. Adjust air shutter to give blue-green inner flame without any traces of yellow in flame. (see illustrations). YELLOW TIPS (CAUSES CARBON FORMATIONS IN BOILER FLUES) LAZY, GREEN INNER FLAME NOT ENOUGH PRIMARY AIR SHARP, BLUE, HARD INNER FLAME (OVERHEATS BURNERS) TOO MUCH PRIMARY AIR SOFT, BLUE-GREEN INNER FLAME WRONG RIGHT PERIODS OF NON-USE When the boiler is out of operation focr periods of any considerable length, the electricity and all gas connections may be shut off, although no damage would occur and very little operating cost would be Involved if not shut off. Under normal operating conditions THE HEATING SYSTEM SHOULD NEVER BE DRAINED; however, if the boiler is not used during the winter months, and if adequate protection is not supplied to avoid the possibility of water freezing anywhere in the system, the entire system should be drained. G P H -60 and 80 18804 GPH GAS BOILERS 1. o z ' or ou. in i .: UoJ i u< GPH 60 & 80 BOILERS- o z o u, cc => O 0 -J u* IA U. 71' o2 1U0J 0- - u <3o*0< cXo o <z 18805 HdO GPH GAS BOILERS 18806 SECTION THRU COMBUSTION CHAMBER SHOWING PILOT TO BURNER ASSEMBLY 1