Document zd7Xb45V8xo77m47aMm046Mqz
INTER-OFFICE MEMO TENNECO .CHEMICALS I INC.
To G.I. Rozand (2) F.W. Kanzler
From R.A. Loj'ewski
Subject VCM Personal Monitoring Charcoal Tube Measurements November, 1975
AT Piscataway
Burlington at Flemington
date December 4, 1975
copy to
p.m. Reed
F.X. Ritter P.R. Scarito - Burl da J.T. Sweeney - Flem da F. Toca File
Attached are the VCM personal monitoring results for the Flemington and Burlington Resin Plants and the Burlington Compound Plant, by job des cription, for the month of November, 1975.
Attachments FWK-RAL/jst
F.W. Kanzler/R.A. Lojewski^^
013212
1
'.
..
FLEMINGTON RESIN PLANT PERSONNEL MONITORING SUMMARY
PPM VCM BY CHARCOAL TUBE METHOD (8-Hour Sampling Period)
PERIOD:
November, 1975.
.-
Distribution:
P.M. Reed G.I. Rozand J.T. Sweeney Q.C. File
1
Job Classification: RESIN PLANT
Shift Foreman Polymerization Foreman Reactor Operator Utility Operator Dryer Operator ' WAREHOUSE Warehouse Foreman V/a re houseman Baqqer MAINTENANCE Maintenance Foreman Maintenance Clerk Mechanic Q. . C. LAB Q. C. Lab Supervisor
C, Technician/Days Q. C. Technician/Shift Monitorinq Analyst BOILER HOUSE Boiler Lead Operator Boiler Operator
0.7, 1.7, 0.3, 0.7 0.7, 0.9 0.6, 0.9, 3.7, 8.7, 1.3, 1.0, 1.8, 2.7, 0.1 0.6, 1.6, 0.3, 1.2 0.1
1
0.3, 0.2
o.i
0.1 0.1 0.1, 1.0
` .. .
0.2 O.i 0.1
*
0.1 0.1
` i
bhha
013213
2" ~
PILOT PLANT
Pilot Plant Group Leader
Pilot Plant Enqineer
Pilot Plant Technician
Pilot Plant Maintenance
0.7 0.3 0.5 0.4
QUARTERLY R. & D. Personnel
QUARTERLY Office Personnel
i
013214
FLEMINGTON EIGHT-HOUR CHARCOAL TUBE TWA BY JOB CLASSIFICATION NOVEMBER, 1975
Job Classification
TWA
m.
Resin Plant
Polyforeman Shift Foreman Reactor Operator - charging Reactor Operator - dumping Reactor Operator - relief Utility Operator Dryer Operator Warehouse Supervisor Warehouseman Bagger
0.7 0.7 3.7 0.9 0.6 0.6 0.1 0.3 0.2 0.1
General Area
Maintenance Foreman Mechanic - shift Mechanic - day Lead Boiler Operator Boiler Operator Maintenance Cler.k Effluent Man Quality Control Technician - day Quality Control Technician - shift Quality Control Supervisor
0.1 1.0 0.1 0.1 0.1 0.1 1.9 0.1 0.1 0.2
Pilot Plant
Group' Leader Engineer Technologist Technician Maintenance Technician
0.7 0.3 0.6 0.5 * 0.4
Time in Air Mask
4 --
15 mins -
* 30 mins --
--
-
--
60 mins -
-
-
-
-- -
45 mins
R.A. Lojewski
12/4/75
01321 r,