Document zd1eD32je1D8809JVydpQJGRz
Monsanto
rPOK' i ; i/, i, ft. LOCATIONi R. L Neary - (4-8156) - General Offices - (Zone 269)
r*Tf. December 3, 1970 Anniston Liquid Aroclor Costs
TO : J. R. Savage
CC: P. B. Benignus H. S. Bergen T. L. Gossage F. J. Holzapfel R. E. Howard G. L. Jessee - Ann. R. M. Kountz J. C. Landwehr- Ann.
Potential cost savings by mothballing the Anniston liquid Aroclor Department were discussed with Joe Landwehr, and the results are conveyed herein:
Summary:
The basis for fixed and budgeted costs are the 1971 cost standards with reductions which were obtained from Joe Landwehr for three cases.
These costs are summarized in the table below: .
Case Description
Table 1
JE II III
Completely Mothballed ' No Production
Partially Mothballeci Produce 4M lb/y r 1221
No Mothballing .Produce up to
20M lb/yr
Costs/month
Fixed & Bud.
Dep., etc. on New Cap.
Total ($M/mo)
Incremental ($M/mo)
.
33.2 --
33.2 --
43.6 --
43.6 10.5
'
48.3
j)
52.5 19.4
^
Production 1221 (M lb/mo) 1242 (M lb/mo) Total (M lb/mo)
--- 333 ---- -- 333
333 500 833
Inc. Cost (/lb)
--
3.2
2.3
DSW 200102 STLCOPCB4058166
J. R. Savage
2 December 3, 1970
Potential savings in fixed and bndapt.pd costs could be $19,400 per\month, $233,000 per year, for total mothballing.-"These savings could be $8,900 per monfKT $107,000 per year if enough equipment is kept operating for 4 M ;bs//year of 1221.
New capital costs to prevent PCB pollution from 1242 produc
tion have been estimated by Anniston to be $278 M with $62 M
dismantling and repair expense.
.
It was assumed that no new capital would be required for 1221 manufacture. It was further assumed that a new incineration installation would not be required. If it were required, Anniston has projected this added cost to be about $500
This capital does not provide Monsanto with two manufacturing sites for MCS-1016. Additional capital of approximately $600 M would be required for a second distillation facility to be located at Anniston.
Details:
A. Fixed and Budgeted Operating Costs
The basis for the fixed and budgeted costs for Case I is cost 'standard bracket-1 with some reductioh. Cost standard bracket 4 is the basis for Cases II and III, with some reductions for Case II, but none for. Case III. A breakdown of these figures is given in the following table.
Case
Costs ($M/mo)
Labor, Salary & OH
TSD, PRD, Div. Res.
Maintenance
Toxicological
Miscellaneous Depreciation
FIE
.
Total ($M/mo)
I
II
3.9 4.5 16.6 3.3 1.5 13.1 10.1
53.0 '
6.6 4.5 16.6 3.3 13.2 13.1 10.1
67.4
III
6.6 4.5 16.6 3.3 13.2 13.1 10.1
67.4
dSNN200A03
STLCOPCB4058167
J. R. Savage
3-
)
December 3, 1970
Reductions TSD, PRD, Div. Res. Maintenance Toxicological Miscellaneous
Total $M/mo
4.5 12.0
3.3
19.8
4.5 12.0
3.3 4.0 23.8
4.5 9.3 3.3 2.0 19.1
ZTotal &B Cost $.M/mo
33.2
43.6
48.3
Costs fdTr-%oxicol ogical and.-TSD.-~etc^-were-subtracted, since they are primarily for development of Division-wide technology for reducing PCB pollution.
. No attempt was made to include the small increase in unit utility costs resulting from reduced usage.
The cost of $4.2M/mo for the new capital required in Case III of Table 1 was obtained by assuming 10% per year for depreciation, 5% per year for maintenance, and 3% per year FIE.
Fixed and budgeted costs were also shown in Table 1 as cost per pound for the incremental cost over the com pletely mothballed case. For comparison with the incre mental cost per pound, the 1970 bracket 3 cost standard fixed and budgeted cost is 1.9/lb.
B. Capital
The capital and expense for projects to reduce PCB in the department effluent are detailed in a letter "Aroclor Waste Control" from J. C. Landwehr to J. R. Savage (October. 20, 1970) .
DSW 200104
STLCOPCB4058168
J. R. Savage
4-
December 3, 1970
The main areas of non-deferrable capital expenditure are listed below:
Area
Capital
Expense
Spill Containment
36.5
37.5
Water Flow Reduction
65 20
HCl Cleanup
16.5
4.5
Final Water Treatment
160
--
Total
278
62
There is nothing included in the above list for carbon or sand filtration - adsorption or for incineration of still bottoms.
Two alternates to a new incinerator are:
1. Modify the present Parathion incinerator to handle still bottoms.
2. Dilute the still bottoms with fuel oil and ship, to Krummrich for incineration._
The still bottoms are only a small volume of material (*->- 4% of product) and should not be a disposal problem^
Since Aroclor 1221 only contains about (/.*5% of five^\^ chlorine and higher material, no capita]\uespendihures were included for PCB removal frorrPth"e"~effTueht tor the low production rate or 4 M lbs./year. The assumption that-nbthingT'additional is required should be confirmed.
\ *w
-7.
R. L. Neary
vo
200A05 qsnN
STLCOPCB4058169