=ST VIRGINIA * "5 -7 December 8, 1978 VC1 Leak Detection Action Plan
The EPA Vinyl Chloride Standard, Section 61.65(b)(8), requires us as a user of Vinyl Chloride to monitor the piping and equipment in our department to detect leaks. This standard goes on to require us to develop a standard procedure for a "routine leak check patrol" to inspect equipment by using portable detectors. The full compliance date for these patrols was Nov. 7, 1978.
Attached are copies of the new Weekly and Biweekly VC1 Equipment Patrol Schedules as developed by George VandeLinde. An operator(s) designated by the foreman will be responsible for checking the items listed on the check list schedule on a weekly basis. All discovered leaks and the appropriate actions taken should be recorded on the checklist schedules. The completed checklist should be routed through the Senior Production Supervisor, and then the Department EP/OH Contact, where it will be filed.
Please realize that this patrol and documentation is mandatory! Failure to comply with this standard will result in fines; and if we continue to defy the standard, we will be shut down. Let's do our best to comply!
'aimer
JLPAag Attachments
UCC 102735
SOLVENT VINl^ptESINS BI-WEEKLY VCl EQUIPMENT LEAK DETECTION PATROL SCHEDULE
AND EQUIPMENT LIST
BY
Check Point
Location
B1,B2,B5,B6 Circ. Pump Suction Line & Valves B1,B2,B5,B6 Circ. Pump Discharge Line & Valves B1,B2,B5,B6 Dynatrol Loop Line & Valves B1,B2,B5,B6 Line From Circ. Pump to Dilution Tank B1,B2,B5,B6 Manheads B1,B2,B5,B6 LL Hiqh Lead Flanqe B1,B2,B5,B6 Temp. Control JCmitter Flanqe B1,B2,B5,B6 Pipinq & Flanqes to Safety Valves B1,B2,B5,B6 Pipinq & Flanqes to Hand Vent B1,B2,B5,B6 Pipinq & Flanqes to Batch Vent B1,B2,B5,B6 Press. Xmitter Taps B1,B2,B5,B6 Pipinq & Flanqes In Continuous Vent B1,B2,B5,B6 VCl fi Mixed Feed Valve B1,B2,B5,B6 LL Low Lead Tap B1,B2,B5,B6 Cat Flanqe B1,B2,B5,B6 MA Valve B1,B2,B5,B6 Coil Mount Flanges B1,B2,B5,B6 Agitator Mount Flanges
153-1 153-1 153-1 153-1 153-1 153-1 153-1 153-2 153-2 153-2 153-2 153-2 153-2 153-2 153-2 153-2 153-2 153-2
Leak Yes No
DATE Comments/Corrective Action Taken
oc o
a
VJ wro1
COO)
Check Point
SOLVENT VINRESINS BI-WEEKLY VCl EQUIPMENT LEA^ftlTECTION PATROL SCHEDULE
AND EQUIPMENT LIST
BY
Location
Le ak Yes No
DATE Comments/Corrective Action Taken
Dilution Tank Suction Line to Pump Dilution Tank Discharge Line to No. 1 Stripping Column No. 1 Stripping Column Pump Suction Line No. 1 Stripping Col. Pump Discharge Line to No. 2 Stripping Column No. 2 Stripping Column Pump Suction Line to Pump Auto Feed Line From Circ. Pumps to Dilution Tank Dilution Tank Vent Line to #1 Stripping Column Dilution Tank Top Valves and Flanges No. 1 and 2 Stripping Column Bottom Flanges and Piping No. 1 and 2 Stripping Column Flanges and Piping on 3rd Level No. 1 and 2 Stripping Column Flanges and Piping on 4th Level No. 1 & 2 Stripping Line & Trap to LP Condenser LP Condenser Lines & Flanges to Rect. Column No. 14 Compressor Discharge Line to HP Condenser HP Condenser Flanges LP Condenser Lines K Flanges to Rect. Column HP Condenser Vent Line to 2622 Tank HP Condenser Trap Flanges HP Condenser Vent Line to No. 14 Compressor
153-1 153-1
153-1 153-1
153-1 153-1 153-2 153-2 153-2
153-3
153-4
153-5 153-5 153-5 153-5 153-4 153-4 153-4 153-4
UCC 102737
Check Point
SOLVENT VI
SINS
BI- WEEKLY VCl EQUIPMENT LEAK DETECTION PATROL SCHEDULE
AND EQUIPMENT LIST
BY
Location
Leak Yes No
DATE Comments/Corrective Action Taken
Rect. Column Top Flanges
153-4
Line From Top Rect. Column to Suction of No. 14 Compressor
153-4
Sucticn Line to #24 Compressor
153-3
No. 14 Compressor Discharge Line to HP Condenser
153-3
No. 24 Compressor Discharge Line to HP Condenser
153-3
VCl Filters and Flanges
153-3
VCl Make Line to 2521 and 2623 Tanks
153-1
VCl Recycle Line Trap to Rect. Column
153-1
No. 14 Compressor Suction Line Valves & Trap
153-1
No. 14 Compressor Suction Trap & Flanges
153-1
No. 14 Compressor Trap & Lines Between First and Second Stages
153-1
VCl Receiving Line From River Crossing to Tank Farm Inlet Cooler
Tank Farm
VCl Inlet Cooler Valves
Tank Farm
VCl Line from Inlet Cooler to 2611 & 2613 Tanks Tank Farm
VCl Equalizing Lines from 2611 & 2613 to 2621 & 2623 Tank Farm
VCl Cylinder Loading Line
Tank Farm
2611 and 2613 VCl Make Line
Tank Farm
2611 & 2613 Top Flanges & Valves (Can't get to)
Tank Farm
2621 & 2623 Circ. Line and Valves
Tank Farm
2621 & 2623 Suction Line and Valves
Tank Farm
VCl Feed Line & Valves from Pump to Autoclaves
Tank Farm
-
Ucc 102738
Check Point
SOLVENT VINYL RESINS BI- WEEKLY VC1 EQUIPMENT LEaWtcTECTION PATROL SCHEDULE
AND EQUIPMENT LIST
BY
Location
Leak Yes No
DATE Comments/Corrective Action Taken
Make Line From HP Condenser to 2621 and 2623 2621 and 2623 Circ. Lines and Valves Vent Line from Field VC1 Tanks to 2622 2626 2622 and 2626 Top Valves & Flanges 2622 2626 Vent Line to IPH 2622 S 2626 VC1 Charge Line 2622 and 2626 Suction Line and Valves 2622 and 2626 VC1 Charge Line to Autoclaves 2622 and 2626 Stripping Line to Dilution Tank 2622 and 2626 Vent Line from Rect. Column 2622 and 2626 Line to 2621 and 2623
WHEN IN SERVICE 24 Compressor Suction & Discharge Lines 24 Compressor Trap Between 1st 2nd Staqes 24 Compressor Suction Trap and Valves 24 Compressor Suction Trap Liquid Pot 24 Compressor Liquid Pot Line to Rect. Column
Tank Farm Tank Farm Tank Farm
154-1 154-1 154-1 154-1 154-1 154-1 154-1 154-1
152-1 152-1 152-1 152-1 152-1
c
o
o
ml
w N9i CO CO
Check Point
B1,B2,B5,B6 Circ. Pump Seals B1,B2,B5,B6 LL Control DMV B1,B2,B5,B6 Agitator Seals B1,B2,B5,B6 Safety Valves B1,B2,B5,B6 Hand Vent Valve B1,B2,B5,B6 Batch Vent B1,B2,B5,B6 VC1 Feed DMV B1,B2,B5,B6 Continuous Vent DMV
SOLVENT VINJ^RESINS WEEKLY VC1 EQUIPMENT LEA^^ETECTION PATROL SCHEDULE
AND EQUIPMENT LIST
BY
Location
Leak Yes No
DATE
153-1 153-1 153-2 153-2 153-2 153-2 153-2 153-2
ooc
--L
IoO
- vl----------------------------------- -------------------------------------------------------
SOLVENT VINY^RESINS WEEKLY VCl EQUIPMENT LEaWRtECTION PATROL SCHEDULE
AND EQUIPMENT LIST
BY
Check Point
Location
Dilution Tank Pump Packinq No. 1 Stripping Column Pump Packing No. 2 Stripping Column Pump Packing Dilution Tank Agitator Seal Dilution Tank Safety Valve No. 1 s 2 Stripping Col. Safety Valves 3rd Level No. 1 & 2 Stripping Col. Safety Valves 4th Level No. 1 & 2 Stripping Col. Safety Valves 5th Level VCl DMV to Rect. Column HP Condenser Vent DMV Rect. Col. Pressure Control DMV Compressor Discharge Safety Valve VCl Make DMV to 2621 and 2623 Tanks No. 14 Compressor Suction Trap Safety Valve No. 14 Compressor Seals
153-1 153-1 153-1 153-1 153-2 15 3-3 153-4 153-5 153-4 153-4 153-3 153-3 153-1 153-1 153-1
No. 14 Compressor Unloader Valves No. 14 Compressor Discharge Safety Valve 2611 & 2613 Tank Vent Line to Air (Can't qet to) 2611 & 2613 Tank Safety Valves (Can't get to) VCl Feed Pump Seals 2621 and 2623 Charge Pump Seal 2621 and 2623 Safety Valves VCl Vent DMV to 2626 and 2622
153-1 153-1 Tank Farm Tank Farm Tank Farm Tank Farm Tank Farm Tank Farm
Leak Yes No
DATE Comments/Corrective Action Taken
UCC 102741
SOLVENT VIN^^ESINS WEEKLY VC1 EQUIPMENT LEA^PsTECTION PATROL SCHEDULE
AND EQUIPMENT LIST
BY
r
Check Point
Location
Leak. Yes No
DATE
Yw* 1UL11 X Lr f
^ i VTM< Y- 1_ V Yv
2622 and 2626 Safety Valves 2622 and 2626 Pump Seal 2622 and 2626 Hand Vent to Air 2622 and 2626 Vent DMV to IPH 2622 and 2626 Int. Orifice
WHEN IN SERVICE 24 Compressor Seals 24 Compressor Valves 24 Compressor Safety Valves 24 Compressor Suction Trap Safety Valve
154-1 154-1 154-1 154-1 154-1
152-1 152-1 152-1 152-1