Document zb0bkmad0kVvNqjRJLo3kRMxm

Monsanto ION''ROM (NtMr A LOf it J. W. Boehm / WGK DATE May 16, 1977 SUBJECT Incinerator Meeting - 5/11/77 REFERENCE TO Messrs. Present J. J. Kaiman W. E. Scruggs J. A. Alley - B2SD F. J. Basile E.R. Billen J.W. Boehm W.C. Engman R.W. Flint G--R*^.Ganote/Rw'R^,,Bunge^ W.A. Kuhn - EISA A.E. Leisy J.C. Peduzzi W.L. Smull M.A. Pierle - EISA R.A. Pohl - B2SB B.R. Williams The above met on 5/11 to discuss the shutdown plan for the WGK Incinerator. Attached is a copy of the presentation summarizing the plan and timing. Agreement was reached to proceed with the plan as proposed. Critical to successful implementation of this plan is achieve ment of acceptable clearance to permit shipment of PCB waste to Rollins for incineration. Manufacturing (Bob Pohl and others as required) will work with Environmental and Legal Personnel to resolve clearance details by 6/1/77. Plant personnel are proceeding to firm up details and begin, implementation of the plan immediately. Cpj (0Jt.W. Boehm cw Attachment DSW 355809 STLCOPCB4085429 SHUTDOWN OF AROCLOR INCINERATOR . 1) NO AROCLOR PRODUCTION 2) NO MATERIAL REQUIRING HIGH TEMP INCINERATION 3) CHEAPER TO SEND NON-PCB'S OUTSIDE 4) NEW AREAWIDE INCINERATOR WILL BURN ALL WASTES IN PLANT . 5) NEW PCB REGULATIONS -1 DSW 355810 STLCOPCB4085430 PCB REGULATIONS ANTICIPATED FOR 1/78 X) CONTINUOUS MONITORING ' :d 2 CO j i C02 TEMPERATURE . ri 2) WEEKLY MONITORING ; i4 NOx TOTAL HYDROCARBONS ` CHLORINATED ORGANICS 02 . CO C02 HC1 - 3) SHUTDOWN ON MONITOR FAILURE 4) MAINTAIN RECORDS OF DATE RECEIVED, PAST USER, PAST USE .' 5) MOVABLE EQUIPMENT (FORKLIFT) MUST BE DECONTAMINATED BEFORE REMOVAL . 6) ALL CONTAINERS (DRUMS) LABELED AND DATED AND STORED BY DATE 7) DECONTAMINATION TRIPLE RINSING WITH SOLVENT 8) SEWAGE TREATMENT SLUDGE OF ~7r 0.05$ PCB MUST BE INCINERATED . 9) SPECIAL LABEL ALL DRUMS 10) RECORDS, RECORDS, RECORDS, AND KEEP FOR 20 YEARS -2 DSW 355811 STLCOPCB4085431 . SHUTDOWN PLAN . 1) STOP NON-PCB WASTE RECEIPTS ASAP 2) STOP AROCLOR CUSTOMER RETURNS 8/31/77 3) BEGIN.TO SEND 500,OOO/M^IO. PCB WASTE OUTSIDE. MUST START NO LATER THAN 6/1/77 4) OPERATE UNTIL ALL WASTE INVENTORY IS EITHER BURNED OR SHIPPED OUTSIDE 10/1/77 5) DECONTAMINATE 10/77 TO 1/78 6) DISMANTLE . - 3- SW 355812 STLCOPCB4085432 i iSi.l STOP NON-PGB WASTES 1) ONA RESIDUE (25M#/foO.) TO BE DRUMMED AND SENT OUT. COULD START WITHIN 2 WEEKS 2) SANTOPHEN I RESIDUE'(35M#/faO.) SEND OUTSIDE. START WITHIN 2 WEEKS . 3) CHLORO-PHENOL/SANTOPHEN I ACID RESIDUE (lOOM#/fob.) ' A) MUST BE NEUTRALIZED STARTING 8/31 B) TEMPORARY LIME FACILITIES AT INCINERATOR 8/31 C) PERMANENT FACILITIES AT DEPT. 236 BY 6/j8 4) MCB PILOT PLANT (lOM#/faO.) - STORE IN DRUMS UNTIL OUTSIDE BURNING PERMIT IS OBTAINED - 4- DSW 355813 STLCOPCB4085433 NEUTRALIZATION FACILITIES 1) TEMPORARY A) DESIGN THRU STARTUP BY' ZONE D B) OPERATED BY ZONE B WHILE INCINERATOR IS IN OPERATION AND/OR DECONTAMINATION C) REQUIRE ARTICLE 10 FOR INCINERATOR D) COSTS - INSTALLATION $30,000 OPERATION $ 2,000/MO. 2) PERMANENT A) ALL WORK TO BE DONE BY ZONE D B) COSTS - CAPITAL $169,000 EXPENSE $ 5,000 ' $17^,000 - 5- DSW 355814 STLCOPCB4085434 STOP PCB WASTES 1) CUSTOMER RETURNS STOP 8/31 MARKETING TO HANDLE 2) RECEIVE 246 WASTES UNTIL INCINERATOR SHUTDOWN 10/1/77 3) AFTER 10/1/77 DECONTAMINATION WASTES TO GO OUTSIDE DSW 355815 STLCOPCB4085435 SENDING PCB'S OUTSIDE FOR 10/1/77 SHUTDOWN 1) CONTRACT FOR INCINERATION 2) THREE- 10,000 GALLON CARS FOR ' WASTE HAULING 3) MUST START BY 6/1/77 ' -( DSW 355816 STLCOPCB4085436 - ECONOMICS OPERATE UNTIL 1/1/80 -$1*744,000 BURN ALL PCB WASTE INVENTORY $1,525,000" IN HOUSE 3/1/78 SHUTDOWN - SEND PCB WASTES OUT SHUTDOWN 10/1/77 . $1,549,000 SEND PCB WASTES OUT FOR 1/1/78 SHUTDOWN $1,544,000 CURRENT OPERATIONS WILL BE TO MINIMIZE UNIT COST OF WASTE BURNING CONSISTENT WITH AVAILABLE RESOURCES COSTS TO BURN IN HOUSE COSTS FOR OUTSIDE INCINERATION 9'.5^/LB. 11.7^/LB. 8- - DSW 355817 STLCOPCB4085437 DECONTAMINATION/DISMANTLING 1) COSTS A) CHARGE TO OBSOLESCENCE $294,000 B) DECONTAMINATION $ 62,000 C) DISMANTLING $240., 000 2) PERSONNEL FOR DECONTAMINATION A) OPERATING - WILL REQUIRE 4 ADDITIONAL PEOPLE FROM UTILITY B) SUPERVISION - AROCLOR DEPT. TO HANDLE 3) TIMING ' A) DECONTAMINATION BY 1/78 B) DISMANTLING . - 9- DSW 355818 STLCOPCB4085438 mm i ~jn- 5? LOOSE ENDS 1) PHENOL HANDLING, DISTRIBUTION, 236, 248, 212, ? .2) FUEL OIL TANK, USED BY 239 AND 245 ? 212 ? 3) TEMPORARY LIME FACILITIES WILL BE OPERATED BY 236 AFTER DECONTAMINATION IS COMPLETED ' 1 * - 10 - - OS\N 355819 STLCOPCB4085439